Semper Solaris Construction Inc

How many solar installs has Semper Solaris Construction Inc done in California, and which license number is on its installs?

Semper Solaris Construction Inc has 31,085 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Mar 29, 2013 to Aug 28, 2026), most of them in San Diego County (14,479), Los Angeles County (2,347) and Riverside County (2,308). CSLB lists license 978152 (SEMPER SOLARIS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
31,085
Last 24 months
3,280
Total capacity
201,991.5 kW DC
Median system size
5.9 kW DC
With battery storage
34.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 81.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.1% of 29,684 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3,294 installs, latest Aug 28, 2026
Ownership types recorded
PPA 538, lease 71, prepaid lease 1
Median battery size
13.5 kWh (3,434 installs list a capacity)
First install
Mar 29, 2013
Latest install
Aug 28, 2026
Counties
45
Utilities
SDGE 15,302, SCE 8,493, PGE 7,290
CSLB license
978152

Is Semper Solaris still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1,623 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
20132100
20144320
20151,1720
20161,7840
20172,2230
20182,8068
20192,729182
20202,916702
20213,434911
20224,323904
20234,651856
20241,575704
20251,909766
2026 (through Aug 31, 2026)921449

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3,294 of its 31,085 interconnected installs (10.8% of the 30,476 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03,84812.6%not counted
NEM 2.023,33476.6%3,756 (30.9%)
Net Billing Tariff3,29410.8%1,593 (81.6%)
Not recorded609

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 610 of Semper Solaris Construction Inc’s installs the utility recorded a third-party ownership type: PPA 538, lease 71, prepaid lease 1, other 0. Across all installers, 82 residential systems list a third-party owner name that matches Semper Solaris Construction Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
EverBright199
Semper Solaris82
EVER BRIGHT81
SUNPOWER61
EnFin51

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2,331 of Semper Solaris Construction Inc’s 3,280 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,651, 70.8%) used modules recorded as Canadian Solar.

In the last 24 months, 2,672 of Semper Solaris Construction Inc’s 3,280 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,450, 54.3%) used inverters recorded as Tesla.

In the last 24 months, 1,271 of Semper Solaris Construction Inc’s 3,280 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (793, 62.4%) used batteries recorded as Tesla.

4,732 of 5,482 battery-paired PG&E and SCE installs (86.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1,6512,041
Qcells3833,201
Silfab2608,402
SunPower646,981
REC26not in top list
Inverter makerTesla1,4503,039
Enphase1,29910,838
SolarEdge20111,701
SunPower804,237
SMA512,581
Battery makerTesla7933,350
Enphase4761,366
LG463
SunPower22
ENPHSE ENERGY11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 27,786 of 31,085 installs, inverters on 30,476. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Semper Solaris Construction Inc as developer on 11,192 battery storage projects and as installer on 11,177 (11,164 name it as both), 11,205 projects in all with 229,257 kWh of storage. 7,802 have the status Paid, with $88,103,332 in current incentive allocations. Applications were received from May 1, 2017 to Oct 6, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid7,802162,808$88,103,332
Reserved2493,521$3,043,281
Pending Reservation31454$895,657
Waitlist13201$377,756
Cancelled2,52253,312$31,063,097
RRF Rejected5888,961$1,342,075

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage6,669109,992$19,569,4575,050$15,240,228
Equity Resiliency3,38394,745$94,582,5642,486$69,573,053
Large-Scale Storage30111,979$2,869,623203$1,938,353
Residential Solar and Storage Equity - AB 2091221,690$2,973,40343$1,023,894
Residential Solar and Storage Equity - AB 209 Non-POU1061,403$2,969,7785$111,944
Residential Solar and Storage Equity - Ratepayer31411$436,58114$204,640
Residential Storage Equity466$56,1001$11,220
Residential Solar and Storage Equity - AB 209 POU110$25,6160$0
Not stated5888,961$1,342,0750$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978152SEMPER SOLARIS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar ContractorOct 26, 2012Oct 31, 202827,999

License numbers are the ones the utilities recorded on the interconnection applications (28,025 of 31,085 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 978152. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Semper Solaris Construction Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco978152181344431038
unincorporated San Diego County9781524024183493633014052042071112,760
unincorporated Marin County97815281022150000055

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego14,479
Los Angeles2,347
Riverside2,308
Orange2,146
San Bernardino1,640
Santa Clara1,297
Alameda1,289
Contra Costa1,168
San Mateo617
Kern542
Ventura497
San Joaquin404
Solano333
Marin282
Fresno238
Sonoma213
Placer123
Santa Cruz123
Napa122
Tulare109
El Dorado94
Yolo84
Monterey81
Merced65
Kings64
San Benito56
Madera53
Calaveras45
San Francisco40
Yuba39
Stanislaus37
Nevada25
Amador23
Tuolumne23
Sutter21
Mariposa16
Butte15
Lake7
San Luis Obispo6
Colusa5
Santa Barbara4
Mendocino2
Sacramento1
Sierra1
Tehama1

Top cities

CityInstalls
San Diego4,661
Chula Vista1,409
El Cajon884
Oceanside735
San Jose692
Escondido673
Santee493
Carlsbad464
La Mesa425
Vista404
San Marcos402
Spring Valley360
Ramona351
Poway346
Lakeside320

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Semper Solaris Construction Inc15,275
SEMPER SOLARIS6,624
SEMPER SOLARIS CONSTRUCTION INC5,356
Semper Solaris3,681
semper solaris145
Semper solaris2
semper Solaris1
sEMPER sOLARIS1

Common questions

Where does Semper Solaris Construction Inc install solar?

Its installs are spread across 45 counties. The most are in San Diego County (14,479 installs), followed by Los Angeles County (2,347).

How often does Semper Solaris Construction Inc install batteries with solar?

34.7% of its interconnected solar installs include battery storage across all years, and 81.9% in the last 24 months (1,436 of 1,754). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Semper Solaris Construction Inc installs are under NEM 3.0 (the Net Billing Tariff)?

3,294 of its 31,085 interconnected installs (10.8% of the 30,476 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.