Solar installers in Merced County, California

Who installs the most solar in Merced County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Merced County are Sunrun (941), Citadel Roofing and Solar (295) and BRIGHT OPS (214). They account for 1,450 of the 2,625 residential solar installs interconnected there in that window.

In all, 17,106 homes in Merced County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 154 installers with installs in this window. 93 installs in the window were self-installed or had no installer recorded.

1Sunrun9413,106
2Citadel Roofing and Solar295389
3BRIGHT OPS214255
4Empower Electric Solar185442
5FREEDOM FOREVER LLC51457
6GAF Energy5051
7SENGA ENERGY LLC46108
8POWER UP SOLUTIONS LLC4546
9Tesla Energy Operations (formerly SolarCity)411,805
10APG Solar38404
11Leonard's Roofing, Inc.3260
12SOLAR NEGOTIATORS31136
13BETTER EARTH ELECTRIC INC27116
14PORTER GRAHAM CONSTRUCTION INC22130
15GRID Alternatives21206
16LIFESTYLE SOLAR INC2152
17ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING19173
18Extreme Solar Solutions19148
19POWUR HOME CONSTRUCTION1925
20INFLUX ENERGY1515
21Quality Home Services15230
22LIFESTYLE SOLAR ELECTRIC1313
23EXO Energy1231
24R. T. Maher Construction12226
25SUPREME SOLAR & ELECTRIC1213

Most installs, all time

1Sunrun3,1063,106
2Tesla Energy Operations (formerly SolarCity)1,8051,805
3Vivint Solar Developer, LLC1,2441,244
4FREEDOM FOREVER LLC457457
5American Array Solar443443
6Empower Electric Solar442442
7APG Solar404404
8Citadel Roofing and Solar389389
9SOLGEN ELECTRIC369369
10Infinity Energy, Inc366366

Installs by year

YearInstalls interconnectedWith battery storage
20222,19099
20232,175227
20241,5101,098
20251,3121,107
2026 (through Aug 31, 2026)776600

Under the Net Billing Tariff (NEM 3.0)

3,123 of the 17,106 residential solar installs in Merced County (18.3% of the 17,106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Merced County

1Sunrun1,1291,12299.4%
2BRIGHT OPS25522989.8%
3Empower Electric Solar24523194.3%
4Bright Planet Solar11554.3%
5FREEDOM FOREVER LLC1019190.1%
6Citadel Roofing and Solar946266.0%
7BETTER EARTH ELECTRIC INC575291.2%
8SENGA ENERGY LLC555294.5%
9Tesla Energy Operations (formerly SolarCity)524892.3%
10GRID Alternatives431637.2%
11SOLAR NEGOTIATORS434297.7%
12APG Solar393076.9%
13Leonard's Roofing, Inc.3800.0%
14POWER UP SOLUTIONS LLC363494.4%
15Quality Home Services292896.6%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Merced County

CityAll-time installs
Merced5,656
Los Banos5,235
Atwater2,908
Gustine702
Dos Palos671
Winton606
Livingston549
Planada274
Le Grand179
Stevinson100
Santa Nella91
Snelling48
South Dos Palos22
Cressey16
El Nido13
Ballico10
Clovis5
Newman5
Chowchilla1
Monte Sereno1

ZIP codes in Merced County

ZIP codes with their own page where the utilities recorded Merced County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

936355,2305,231797
953403,0513,051463
953012,9052,905381
953481,6181,618280
95341989989191
9532279379372
9362067168282
95388606606101
9533455055097
9536527527582
9533317717737
9537410010019
9536948575

Equipment recorded

In the last 24 months, 2,446 of Merced County’s 2,625 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (679, 27.8%) used modules recorded as Qcells.

In the last 24 months, 2,625 of Merced County’s 2,625 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,321, 50.3%) used inverters recorded as Tesla.

In the last 24 months, 1,706 of Merced County’s 2,625 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (910, 53.3%) used batteries recorded as Tesla.

2,686 of 3,255 battery-paired PG&E and SCE installs (82.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6793,025
JA Solar6701,436
LONGi4151,571
Canadian Solar1611,170
Elin Energy156not in top list
Inverter makerTesla1,3211,685
Enphase7425,226
SolarEdge7236,366
Delta Electronics69446
FranklinWH65not in top list
Battery makerTesla9101,194
Enphase325527
SolarEdge271380
LG90407
FranklinWH6185

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15,512 of 17,106 installs, inverters on 17,106. See the methodology and the equipment index.

SGIP battery storage projects in Merced County

The SGIP public project report downloaded Nov 16, 2026 lists 149 battery storage projects in Merced County with the status Paid, carrying $2,754,285 in current incentive allocations and 3,443 kWh of storage. Across every status it lists 334 storage projects there, 104 of them cancelled and 81 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid1493,443$2,754,285
PBI in Process58,775$2,270,920
Reserved59883$2,177,541
Pending Reservation566$200,934
Waitlist226$29,040
Cancelled10416,231$6,817,767
RRF Rejected10144$22,299

Installers named on the most SGIP storage projects in Merced County

InstallerProjectsPaid
RICHARD HEATH & ASSOCIATES INC9974
Sunrun3819
HAVEN ENERGY SERVICES INC3510
GRID Alternatives2013
SOLAR 4 AMERICA1511
PetersenDean1410
Vivint Solar Developer, LLC131
Semper Solaris Construction Inc126
Infinity Energy, Inc73
ADT SOLAR LLC30

59 of the 334 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Merced County (EIA)

EIA’s 2025 Service Territory file lists 4 utilities serving Merced County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Turlock Irrigation DistrictPolitical Subdivision5,6135,41571.514AC0
Merced Irrigation DistrictPolitical Subdivision3,6993,62325.906AC141

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Merced County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Merced County

5 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Merced County as the county: 4 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 5 C-10 Electrical licenses in Merced County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Merced County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
17,106
Last 24 months
2,625
Capacity
127.2 MW DC
Median system size
6.6 kW DC
With battery storage
19.0% all time; 81.7% last 24 months
Third-party owned
35.4% where reported
Ownership types recorded
PPA 5,033, lease 866, prepaid lease 32, other 118
Median battery size
13.5 kWh
Earliest install in data
Aug 28, 2001

Common questions

How many homes in Merced County have solar?

17,106 residential solar systems in Merced County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,625 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Merced County?

154 installer names have at least one install interconnected in Merced County in the last 24 months, and 674 appear in the full record.

How common are batteries with new solar in Merced County?

19.0% of the solar installs interconnected in Merced County include battery storage across all years, and 81.7% in the last 24 months (2,144 of 2,625).

How many solar installs in Merced County are under NEM 3.0?

3,123 of the 17,106 residential solar installs in Merced County (18.3% of the 17,106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.