Solar installers in Riverside County, California
Who installs the most solar in Riverside County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Riverside County are Sunrun (9,829), SUNNOVA ENERGY CORPORATION (1,812) and SunPower (1,698). They account for 13,339 of the 29,736 residential solar installs interconnected there in that window.
In all, 203,423 homes in Riverside County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 596 installers with installs in this window. 440 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 9,829 | 24,719 |
| 2 | SUNNOVA ENERGY CORPORATION | 1,812 | 6,455 |
| 3 | SunPower | 1,698 | 23,523 |
| 4 | BRIGHT OPS | 1,274 | 1,682 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 1,138 | 16,191 |
| 6 | GAF Energy | 998 | 1,001 |
| 7 | FREEDOM FOREVER LLC | 668 | 4,701 |
| 8 | Current Home | 561 | 2,712 |
| 9 | Renova Energy Corp | 417 | 8,375 |
| 10 | Complete Solar | 402 | 1,423 |
| 11 | V3 Electric | 384 | 1,112 |
| 12 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 367 | 2,105 |
| 13 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 356 | 545 |
| 14 | Hot Purple Energy | 311 | 2,185 |
| 15 | SOLARA HOME ENERGY LLC | 309 | 309 |
| 16 | BETTER EARTH ELECTRIC INC | 295 | 1,067 |
| 17 | Empower Electric Solar | 283 | 544 |
| 18 | EXO Energy | 270 | 1,081 |
| 19 | MY SMART HOUSE LLC | 267 | 276 |
| 20 | APOLLO HOME POWER LLC | 256 | 256 |
| 21 | SolarMax Renewable Energy Provider, Inc | 255 | 2,861 |
| 22 | New Day Solar | 220 | 1,611 |
| 23 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 210 | 210 |
| 24 | SOLAR TECH ENERGY SYSTEMS INC | 205 | 459 |
| 25 | LIFESTYLE SOLAR INC | 174 | 192 |
Most installs, all time
| 1 | Sunrun | 24,719 | 24,719 |
| 2 | SunPower | 23,523 | 23,523 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 16,191 | 16,191 |
| 4 | Renova Energy Corp | 8,375 | 8,375 |
| 5 | Vivint Solar Developer, LLC | 8,367 | 8,367 |
| 6 | SUNNOVA ENERGY CORPORATION | 6,455 | 6,455 |
| 7 | Solcius | 5,434 | 5,434 |
| 8 | Horizon Solar Power | 5,162 | 5,162 |
| 9 | FREEDOM FOREVER LLC | 4,701 | 4,701 |
| 10 | SunStreet Energy Group LLC | 4,204 | 4,204 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 25,615 | 2,478 |
| 2023 | 27,040 | 3,791 |
| 2024 | 17,800 | 9,996 |
| 2025 | 15,096 | 11,242 |
| 2026 (through Aug 31, 2026) | 9,450 | 7,449 |
Under the Net Billing Tariff (NEM 3.0)
35,771 of the 203,423 residential solar installs in Riverside County (17.6% of the 203,423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Riverside County
| 1 | Sunrun | 11,177 | 8,763 | 78.4% |
| 2 | SUNNOVA ENERGY CORPORATION | 2,670 | 1,815 | 68.0% |
| 3 | SunPower | 1,943 | 520 | 26.8% |
| 4 | BRIGHT OPS | 1,682 | 1,535 | 91.3% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 1,248 | 1,152 | 92.3% |
| 6 | FREEDOM FOREVER LLC | 1,049 | 992 | 94.6% |
| 7 | GAF Energy | 999 | 988 | 98.9% |
| 8 | Current Home | 729 | 719 | 98.6% |
| 9 | Renova Energy Corp | 684 | 572 | 83.6% |
| 10 | V3 Electric | 541 | 529 | 97.8% |
| 11 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 485 | 407 | 83.9% |
| 12 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 472 | 448 | 94.9% |
| 13 | Bright Planet Solar | 468 | 208 | 44.4% |
| 14 | EXO Energy | 445 | 270 | 60.7% |
| 15 | BETTER EARTH ELECTRIC INC | 422 | 408 | 96.7% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Riverside County
| City | All-time installs |
|---|---|
| Corona | 17,957 |
| Murrieta | 16,321 |
| Menifee | 15,637 |
| Temecula | 14,311 |
| Moreno Valley | 11,284 |
| Riverside | 10,920 |
| Hemet | 10,372 |
| Lake Elsinore | 10,154 |
| Palm Springs | 8,889 |
| Beaumont | 8,863 |
| Winchester | 8,784 |
| Palm Desert | 8,407 |
| Perris | 8,135 |
| Cathedral City | 6,404 |
| San Jacinto | 5,678 |
| Rancho Mirage | 5,361 |
| Eastvale | 5,006 |
| Desert Hot Springs | 4,507 |
| Wildomar | 4,293 |
| Jurupa Valley | 3,768 |
ZIP codes in Riverside County
ZIP codes with their own page where the utilities recorded Riverside County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92584 | 12,045 | 12,047 | 1,630 |
| 92223 | 9,367 | 9,372 | 1,194 |
| 92563 | 9,316 | 9,321 | 888 |
| 92596 | 8,700 | 8,703 | 2,151 |
| 92592 | 8,647 | 8,654 | 895 |
| 92880 | 7,519 | 7,587 | 913 |
| 92562 | 7,171 | 7,176 | 784 |
| 92234 | 6,393 | 6,394 | 924 |
| 92530 | 6,091 | 6,097 | 1,205 |
| 92883 | 5,641 | 5,650 | 852 |
| 92262 | 5,451 | 5,456 | 655 |
| 92509 | 5,398 | 5,399 | 1,035 |
| 92270 | 5,359 | 5,361 | 472 |
| 92591 | 5,250 | 5,254 | 855 |
| 92585 | 4,915 | 4,917 | 882 |
| 92260 | 4,545 | 4,547 | 522 |
| 92571 | 4,498 | 4,499 | 788 |
| 92545 | 4,267 | 4,270 | 767 |
| 92240 | 4,232 | 4,236 | 792 |
| 92595 | 4,183 | 4,185 | 569 |
| 92882 | 4,076 | 4,079 | 523 |
| 92557 | 4,067 | 4,070 | 529 |
| 92532 | 3,961 | 3,961 | 462 |
| 92211 | 3,855 | 3,855 | 524 |
| 92544 | 3,776 | 3,778 | 517 |
| 92570 | 3,527 | 3,529 | 653 |
| 92264 | 3,412 | 3,413 | 459 |
| 91752 | 3,231 | 3,255 | 280 |
| 92553 | 3,143 | 3,145 | 445 |
| 92586 | 3,008 | 3,010 | 711 |
| 92881 | 2,944 | 2,947 | 324 |
| 92582 | 2,818 | 2,819 | 595 |
| 92507 | 2,741 | 2,743 | 459 |
| 92503 | 2,723 | 2,723 | 376 |
| 92587 | 2,695 | 2,697 | 272 |
| 92583 | 2,681 | 2,684 | 500 |
| 92543 | 2,489 | 2,492 | 485 |
| 92555 | 2,303 | 2,304 | 258 |
| 92860 | 2,287 | 2,288 | 256 |
| 92879 | 2,065 | 2,069 | 303 |
| 92210 | 1,862 | 1,863 | 180 |
| 92551 | 1,829 | 1,833 | 266 |
| 92320 | 1,705 | 1,709 | 126 |
| 92225 | 1,255 | 1,255 | 200 |
| 92504 | 1,081 | 1,082 | 149 |
| 92548 | 1,040 | 1,040 | 392 |
| 92567 | 926 | 927 | 185 |
| 92508 | 565 | 565 | 58 |
| 92590 | 373 | 375 | 52 |
| 92878 | 331 | 331 | 99 |
| 92241 | 269 | 270 | 41 |
| 92549 | 181 | 181 | 22 |
| 92501 | 153 | 153 | 58 |
| 92506 | 147 | 147 | 24 |
| 92282 | 132 | 132 | 24 |
| 92220 | 124 | 124 | 15 |
| 92230 | 110 | 110 | 16 |
| 92531 | 94 | 94 | 94 |
| 92536 | 43 | 55 | 7 |
| 92514 | 36 | 36 | 18 |
| 92877 | 28 | 28 | 0 |
Equipment recorded
In the last 24 months, 29,541 of Riverside County’s 29,736 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14,155, 47.9%) used modules recorded as Qcells.
In the last 24 months, 29,736 of Riverside County’s 29,736 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (13,667, 46.0%) used inverters recorded as Enphase.
In the last 24 months, 21,625 of Riverside County’s 29,736 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13,740, 63.5%) used batteries recorded as Tesla.
37,211 of 38,582 battery-paired PG&E and SCE installs (96.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 14,155 | 46,963 |
| JA Solar | 3,998 | 10,139 | |
| LONGi | 3,474 | 12,312 | |
| Canadian Solar | 1,652 | 10,257 | |
| Silfab | 1,333 | not in top list | |
| Inverter maker | Enphase | 13,667 | 71,624 |
| Tesla | 10,967 | 14,611 | |
| SolarEdge | 5,711 | 63,319 | |
| SunPower | 666 | 22,308 | |
| Delta Electronics | 510 | 5,086 | |
| Battery maker | Tesla | 13,740 | 19,766 |
| Enphase | 3,712 | 5,787 | |
| SolarEdge | 2,014 | 3,821 | |
| FranklinWH | 1,503 | 1,944 | |
| LG | 286 | 4,008 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 172,359 of 203,423 installs, inverters on 203,344. See the methodology and the equipment index.
SGIP battery storage projects in Riverside County
The SGIP public project report downloaded Nov 16, 2026 lists 4,199 battery storage projects in Riverside County with the status Paid, carrying $43,263,386 in current incentive allocations and 92,880 kWh of storage. Across every status it lists 7,645 storage projects there, 2,049 of them cancelled and 1,397 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 4,199 | 92,880 | $43,263,386 |
| PBI in Process | 46 | 50,591 | $30,022,646 |
| Reserved | 685 | 87,979 | $40,663,657 |
| Pending Reservation | 117 | 10,430 | $3,850,094 |
| Waitlist | 426 | 9,859 | $16,509,789 |
| Cancelled | 2,049 | 217,913 | $119,016,943 |
| RRF Rejected | 123 | 3,545 | $968,683 |
Installers named on the most SGIP storage projects in Riverside County
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 1,230 | 683 |
| Hot Purple Energy | 807 | 698 |
| Semper Solaris Construction Inc | 612 | 443 |
| APOLLO HOME POWER LLC | 507 | 105 |
| Renova Energy Corp | 427 | 356 |
| SolarMax Renewable Energy Provider, Inc | 406 | 225 |
| SunPower | 300 | 121 |
| HAVEN ENERGY SERVICES INC | 214 | 68 |
| Tesla | 208 | 121 |
| Infinity Energy, Inc | 176 | 102 |
749 of the 7,645 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Riverside County (EIA)
EIA’s 2025 Service Territory file lists 8 utilities serving Riverside County. 5 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
| Imperial Irrigation District | Political Subdivision | 12,078 | 11,728 | 163.208 | AC | 0 |
| City of Riverside - (CA) | Municipal | 8,248 | 7,975 | 79 | DC | 0 |
| City of Moreno Valley - (CA) | Municipal | 3,225 | 3,204 | 20.363 | AC | 87 |
| City of Corona - (CA) | Municipal | 25 | 20 | 1.45 | AC | 0 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Anza Electric Coop Inc; City of Banning - (CA); WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Riverside County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Riverside County
81 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Riverside County as the county: 56 with the business type Corporation, Limited Liability, Partnership or JointVenture and 25 Sole Owner. 76 C-10 Electrical licenses in Riverside County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Riverside County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
Solar permit data in Riverside County
One permit dataset in Riverside County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Area covered | Agency | Solar permits, 2025 | Battery permits, 2025 | Full table |
|---|---|---|---|---|
| City of Corona | City of Corona | 921 | 357 | City page |
At a glance
- Residential solar installs
- 203,423
- Last 24 months
- 29,736
- Capacity
- 1,463.9 MW DC
- Median system size
- 6.2 kW DC
- With battery storage
- 19.0% all time; 74.4% last 24 months
- Third-party owned
- 47.8% where reported
- Ownership types recorded
- PPA 60,752, lease 23,584, prepaid lease 298, other 5,787
- Median battery size
- 13.5 kWh
- Earliest install in data
- Apr 27, 1999
Common questions
How many homes in Riverside County have solar?
203,423 residential solar systems in Riverside County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 29,736 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Riverside County?
596 installer names have at least one install interconnected in Riverside County in the last 24 months, and 2,603 appear in the full record.
How common are batteries with new solar in Riverside County?
19.0% of the solar installs interconnected in Riverside County include battery storage across all years, and 74.4% in the last 24 months (22,135 of 29,736).
How many solar installs in Riverside County are under NEM 3.0?
35,771 of the 203,423 residential solar installs in Riverside County (17.6% of the 203,423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.