Solar installers in Ventura County, California
Who installs the most solar in Ventura County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ventura County are Sunrun (1,899), Tesla Energy Operations (formerly SolarCity) (504) and ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING (230). They account for 2,633 of the 6,587 residential solar installs interconnected there in that window.
In all, 42,885 homes in Ventura County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 353 installers with installs in this window. 136 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 1,899 | 6,228 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 504 | 4,595 |
| 3 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 230 | 813 |
| 4 | SunPower | 209 | 2,124 |
| 5 | ORANGE COUNTY CONTRACTING SERVICES | 142 | 143 |
| 6 | PORTICADE ENERGY LLC | 139 | 139 |
| 7 | SESPE POWER SOLUTIONS | 132 | 384 |
| 8 | FREEDOM FOREVER LLC | 125 | 1,123 |
| 9 | SHELTER ROOFING & SOLAR CONSTRUCTION | 125 | 385 |
| 10 | GAF Energy | 123 | 125 |
| 11 | SOLARA HOME ENERGY LLC | 101 | 101 |
| 12 | CALIFORNIA SOLAR ELECTRIC SYSTEMS INC | 93 | 366 |
| 13 | Solar Optimum Inc. | 93 | 482 |
| 14 | Complete Solar | 91 | 234 |
| 15 | Quantum Solar Designs, Inc. | 85 | 652 |
| 16 | AXIA SOLAR CORP | 70 | 72 |
| 17 | COASTAL SOLAR | 65 | 184 |
| 18 | A P ELECTRICAL | 64 | 333 |
| 19 | AMECO SOLAR LLC | 63 | 168 |
| 20 | NRG Clean Power | 59 | 206 |
| 21 | SUNNOVA ENERGY CORPORATION | 56 | 335 |
| 22 | V3 Electric | 53 | 128 |
| 23 | BRIGHT OPS | 51 | 56 |
| 24 | WAYNE PENDREY CONSTRUCTION INC DBA THE SOLAR CONTRACTOR | 46 | 105 |
| 25 | APOLLO HOME POWER LLC | 45 | 45 |
Most installs, all time
| 1 | Sunrun | 6,228 | 6,228 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 4,595 | 4,595 |
| 3 | Vivint Solar Developer, LLC | 4,162 | 4,162 |
| 4 | SunPower | 2,124 | 2,124 |
| 5 | FREEDOM FOREVER LLC | 1,123 | 1,123 |
| 6 | Kota Construction LLC | 1,010 | 1,010 |
| 7 | Verengo | 818 | 818 |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 813 | 813 |
| 9 | Quantum Solar Designs, Inc. | 652 | 652 |
| 10 | Semper Solaris Construction Inc | 497 | 497 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 5,770 | 1,480 |
| 2023 | 5,667 | 1,546 |
| 2024 | 2,573 | 1,974 |
| 2025 | 3,541 | 3,140 |
| 2026 (through Aug 31, 2026) | 2,268 | 1,998 |
Under the Net Billing Tariff (NEM 3.0)
7,165 of the 42,885 residential solar installs in Ventura County (16.7% of the 42,885 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Ventura County
| 1 | Sunrun | 2,194 | 2,054 | 93.6% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 549 | 529 | 96.4% |
| 3 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 269 | 260 | 96.7% |
| 4 | FREEDOM FOREVER LLC | 214 | 204 | 95.3% |
| 5 | SunPower | 158 | 119 | 75.3% |
| 6 | ORANGE COUNTY CONTRACTING SERVICES | 141 | 141 | 100.0% |
| 7 | PORTICADE ENERGY LLC | 139 | 139 | 100.0% |
| 8 | SESPE POWER SOLUTIONS | 136 | 135 | 99.3% |
| 9 | GAF Energy | 123 | 39 | 31.7% |
| 10 | SHELTER ROOFING & SOLAR CONSTRUCTION | 117 | 107 | 91.5% |
| 11 | Solar Optimum Inc. | 102 | 92 | 90.2% |
| 12 | SOLARA HOME ENERGY LLC | 101 | 98 | 97.0% |
| 13 | Quantum Solar Designs, Inc. | 94 | 88 | 93.6% |
| 14 | Complete Solar | 80 | 73 | 91.3% |
| 15 | Kota Construction LLC | 75 | 74 | 98.7% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Ventura County
| City | All-time installs |
|---|---|
| Simi Valley | 10,110 |
| Camarillo | 5,393 |
| Ventura | 5,297 |
| Thousand Oaks | 5,167 |
| Oxnard | 4,187 |
| Newbury Park | 2,976 |
| Moorpark | 2,402 |
| Ojai | 1,729 |
| Fillmore | 1,457 |
| Santa Paula | 1,404 |
| Oak Park | 872 |
| Santa Rosa Valley | 422 |
| Oak View | 377 |
| Piru | 335 |
| Port Hueneme | 266 |
| Somis | 228 |
| Bell Canyon | 183 |
| Lake Sherwood | 59 |
| Westlake Village | 10 |
| Santa Clarita | 3 |
ZIP codes in Ventura County
ZIP codes with their own page where the utilities recorded Ventura County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 93065 | 5,899 | 5,903 | 797 |
| 93063 | 4,193 | 4,197 | 586 |
| 91320 | 3,274 | 3,277 | 629 |
| 93010 | 3,251 | 3,252 | 456 |
| 91360 | 3,029 | 3,032 | 420 |
| 93012 | 2,562 | 2,565 | 420 |
| 93003 | 2,423 | 2,427 | 498 |
| 93021 | 2,396 | 2,396 | 310 |
| 93004 | 1,904 | 1,905 | 317 |
| 93023 | 1,723 | 1,723 | 219 |
| 91362 | 1,615 | 2,202 | 334 |
| 93015 | 1,461 | 1,462 | 138 |
| 93060 | 1,404 | 1,404 | 259 |
| 93036 | 1,216 | 1,218 | 148 |
| 93033 | 1,172 | 1,172 | 193 |
| 93030 | 1,127 | 1,128 | 158 |
| 93001 | 969 | 970 | 187 |
| 91377 | 872 | 877 | 141 |
| 93035 | 672 | 674 | 114 |
| 93022 | 378 | 378 | 45 |
| 93040 | 329 | 329 | 154 |
| 91361 | 286 | 1,172 | 196 |
| 93041 | 266 | 267 | 50 |
| 93066 | 228 | 228 | 32 |
| 91307 | 182 | 246 | 36 |
Equipment recorded
In the last 24 months, 6,530 of Ventura County’s 6,587 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2,481, 38.0%) used modules recorded as Qcells.
In the last 24 months, 6,586 of Ventura County’s 6,587 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2,806, 42.6%) used inverters recorded as Tesla.
In the last 24 months, 5,647 of Ventura County’s 6,587 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3,723, 65.9%) used batteries recorded as Tesla.
11,682 of 12,283 battery-paired PG&E and SCE installs (95.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 2,481 | 9,044 |
| JA Solar | 662 | 1,928 | |
| LONGi | 600 | 1,869 | |
| REC | 454 | 2,592 | |
| Silfab | 430 | not in top list | |
| Inverter maker | Tesla | 2,806 | 3,560 |
| Enphase | 2,491 | 14,027 | |
| SolarEdge | 1,037 | 13,743 | |
| SunPower | 134 | 3,402 | |
| SMA | 101 | 2,437 | |
| Battery maker | Tesla | 3,723 | 7,094 |
| Enphase | 1,154 | 1,948 | |
| FranklinWH | 362 | 439 | |
| SolarEdge | 259 | 498 | |
| Lunar Energy | 43 | 43 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34,216 of 42,885 installs, inverters on 42,868. See the methodology and the equipment index.
SGIP battery storage projects in Ventura County
The SGIP public project report downloaded Nov 16, 2026 lists 3,015 battery storage projects in Ventura County with the status Paid, carrying $47,238,100 in current incentive allocations and 72,262 kWh of storage. Across every status it lists 4,965 storage projects there, 1,291 of them cancelled and 659 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 3,015 | 72,262 | $47,238,100 |
| PBI in Process | 76 | 92,832 | $76,243,134 |
| Reserved | 413 | 34,099 | $25,553,364 |
| Pending Reservation | 50 | 1,469 | $2,385,361 |
| Waitlist | 79 | 1,313 | $1,990,107 |
| Cancelled | 1,291 | 103,832 | $71,201,302 |
| RRF Rejected | 41 | 1,268 | $468,863 |
Installers named on the most SGIP storage projects in Ventura County
| Installer | Projects | Paid |
|---|---|---|
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 536 | 402 |
| Sunrun | 487 | 314 |
| LA Solar Group | 454 | 357 |
| Semper Solaris Construction Inc | 331 | 281 |
| Plug It In Solar | 223 | 148 |
| Tesla | 216 | 137 |
| SunPower | 193 | 113 |
| Solar Optimum Inc. | 174 | 118 |
| SESPE POWER SOLUTIONS | 173 | 107 |
| PLUG IT IN SYSTEMS INC | 164 | 110 |
428 of the 4,965 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Ventura County (EIA)
EIA’s 2025 Service Territory file lists 1 utility serving Ventura County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Ventura County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Ventura County
17 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Ventura County as the county: 11 with the business type Corporation, Limited Liability, Partnership or JointVenture and 6 Sole Owner. 25 C-10 Electrical licenses in Ventura County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Ventura County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 42,885
- Last 24 months
- 6,587
- Capacity
- 286.3 MW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 28.6% all time; 88.2% last 24 months
- Third-party owned
- 37.4% where reported
- Ownership types recorded
- PPA 11,243, lease 2,930, prepaid lease 49, other 364
- Median battery size
- 13.5 kWh
- Earliest install in data
- Sep 15, 1999
Common questions
How many homes in Ventura County have solar?
42,885 residential solar systems in Ventura County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 6,587 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Ventura County?
353 installer names have at least one install interconnected in Ventura County in the last 24 months, and 1,324 appear in the full record.
How common are batteries with new solar in Ventura County?
28.6% of the solar installs interconnected in Ventura County include battery storage across all years, and 88.2% in the last 24 months (5,812 of 6,587).
How many solar installs in Ventura County are under NEM 3.0?
7,165 of the 42,885 residential solar installs in Ventura County (16.7% of the 42,885 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.