Solar installers in El Dorado County, California

Who installs the most solar in El Dorado County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in El Dorado County are Sunrun (268), V3 Electric (259) and GAF Energy (177). They account for 704 of the 2,534 residential solar installs interconnected there in that window.

In all, 23,143 homes in El Dorado County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 200 installers with installs in this window. 137 installs in the window were self-installed or had no installer recorded.

1Sunrun2681,628
2V3 Electric2591,679
3GAF Energy177179
4Citadel Roofing and Solar135552
5Leonard's Roofing, Inc.1271,471
6SENGA ENERGY LLC127207
7Tesla Energy Operations (formerly SolarCity)1021,969
8BRIGHT OPS81102
9SOLAR AND ROOF DIRECT5858
10SolarHut, LLC48360
11Complete Solar4659
12SOLAR SAVINGS DIRECT INC42414
13Sunrise Solar38151
14NORTH VALLEY LLC3788
15BETTER EARTH ELECTRIC INC3367
16Apex Solar, Inc.30422
17FREEDOM FOREVER LLC28282
18COOL ELECTRIC2334
19DIAMOND SOLAR SOLUTIONS INC2360
20SunPower231,133
21EXCITE ENERGY21255
22Hooked On Solar21491
23Sierra Energy Savers18111
24SOLCORE INC1818
25Sunriver Solar1821

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)1,9691,969
2V3 Electric1,6791,679
3Sunrun1,6281,628
4Leonard's Roofing, Inc.1,4711,471
5SunPower1,1331,133
6Gold Rush Energy Solutions600600
7Citadel Roofing and Solar552552
8Hooked On Solar491491
9Bright Planet Solar457457
10Apex Solar, Inc.422422

Installs by year

YearInstalls interconnectedWith battery storage
20222,478417
20232,708472
20241,562998
20251,2991,019
2026 (through Aug 31, 2026)788639

Under the Net Billing Tariff (NEM 3.0)

2,675 of the 23,143 residential solar installs in El Dorado County (11.6% of the 23,140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in El Dorado County

1V3 Electric40339197.0%
2Sunrun39339099.2%
3Tesla Energy Operations (formerly SolarCity)13512894.8%
4SENGA ENERGY LLC11710993.2%
5BRIGHT OPS1019796.0%
6Leonard's Roofing, Inc.846476.2%
7GAF Energy807998.8%
8SOLAR SAVINGS DIRECT INC676191.0%
9NORTH VALLEY LLC646398.4%
10SolarHut, LLC523975.0%
11SOLAR AND ROOF DIRECT494898.0%
12Bright Planet Solar474391.5%
13FREEDOM FOREVER LLC474595.7%
14SunPower403177.5%
15BETTER EARTH ELECTRIC INC373697.3%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in El Dorado County

CityAll-time installs
El Dorado Hills10,896
Placerville3,637
Cameron Park2,448
Shingle Springs1,805
Rescue880
Cool644
El Dorado548
Diamond Springs356
Camino340
Somerset279
Pollock Pines266
Garden Valley231
Pilot Hill202
Georgetown166
Greenwood97
Lotus87
Kelsey54
Grizzly Flats53
Mount Aukum48
Coloma34

ZIP codes in El Dorado County

ZIP codes with their own page where the utilities recorded El Dorado County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

9576210,92510,9271,028
956824,2444,244414
956673,7043,704494
9567288088098
9561464464479
9562354354371
9561935835857
9570934134153
9568428228237
9572626826835
9563323023039
9566420220221
9563416716739
9563595969
95651888813
95636525215
9565649522
9561336753

Equipment recorded

In the last 24 months, 2,349 of El Dorado County’s 2,534 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (925, 39.4%) used modules recorded as Qcells.

In the last 24 months, 2,534 of El Dorado County’s 2,534 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,218, 48.1%) used inverters recorded as Tesla.

In the last 24 months, 1,664 of El Dorado County’s 2,534 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (967, 58.1%) used batteries recorded as Tesla.

3,398 of 4,255 battery-paired PG&E and SCE installs (79.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells9254,847
JA Solar364745
LONGi2651,305
REC1351,566
Canadian Solar1261,146
Inverter makerTesla1,2182,407
Enphase1,2038,934
SolarEdge4367,482
FranklinWH120not in top list
SunPower671,877
Battery makerTesla9671,697
Enphase334657
SolarEdge164314
FranklinWH115151
PointGuard Energy Inc.2727

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 21,021 of 23,143 installs, inverters on 23,142. See the methodology and the equipment index.

SGIP battery storage projects in El Dorado County

The SGIP public project report downloaded Nov 16, 2026 lists 1,335 battery storage projects in El Dorado County with the status Paid, carrying $25,214,667 in current incentive allocations and 34,436 kWh of storage. Across every status it lists 2,092 storage projects there, 634 of them cancelled and 123 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid1,33534,436$25,214,667
PBI in Process1116,588$12,980,075
Reserved621,258$1,578,534
Pending Reservation16302$593,109
Cancelled63427,935$19,234,894
RRF Rejected34485$79,003

Installers named on the most SGIP storage projects in El Dorado County

InstallerProjectsPaid
V3 Electric290194
SWELL SERVICES INC DBA SWELL CONTRACTORS257172
Hooked On Solar246189
Infinity Energy, Inc13584
Sunrun12977
Semper Solaris Construction Inc11480
SolarNorcal, LLC10277
SOLAR SAVINGS DIRECT INC7030
Gold Rush Energy Solutions6849
Tesla6341

68 of the 2,092 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving El Dorado County (EIA)

EIA’s 2025 Service Territory file lists 2 utilities serving El Dorado County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Liberty UtilitiesInvestor Owned8377445.366AC60

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in El Dorado County

13 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list El Dorado County as the county: 12 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 12 C-10 Electrical licenses in El Dorado County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in El Dorado County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
23,143
Last 24 months
2,534
Capacity
171.4 MW DC
Median system size
6.9 kW DC
With battery storage
18.4% all time; 79.0% last 24 months
Third-party owned
26.2% where reported
Ownership types recorded
PPA 5,430, lease 555, prepaid lease 19, other 64
Median battery size
13.5 kWh
Earliest install in data
Jan 12, 2000

Common questions

How many homes in El Dorado County have solar?

23,143 residential solar systems in El Dorado County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,534 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in El Dorado County?

200 installer names have at least one install interconnected in El Dorado County in the last 24 months, and 980 appear in the full record.

How common are batteries with new solar in El Dorado County?

18.4% of the solar installs interconnected in El Dorado County include battery storage across all years, and 79.0% in the last 24 months (2,001 of 2,534).

How many solar installs in El Dorado County are under NEM 3.0?

2,675 of the 23,143 residential solar installs in El Dorado County (11.6% of the 23,140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources