Solar installers in El Dorado County, California
Who installs the most solar in El Dorado County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in El Dorado County are Sunrun (268), V3 Electric (259) and GAF Energy (177). They account for 704 of the 2,534 residential solar installs interconnected there in that window.
In all, 23,143 homes in El Dorado County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 200 installers with installs in this window. 137 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 268 | 1,628 |
| 2 | V3 Electric | 259 | 1,679 |
| 3 | GAF Energy | 177 | 179 |
| 4 | Citadel Roofing and Solar | 135 | 552 |
| 5 | Leonard's Roofing, Inc. | 127 | 1,471 |
| 6 | SENGA ENERGY LLC | 127 | 207 |
| 7 | Tesla Energy Operations (formerly SolarCity) | 102 | 1,969 |
| 8 | BRIGHT OPS | 81 | 102 |
| 9 | SOLAR AND ROOF DIRECT | 58 | 58 |
| 10 | SolarHut, LLC | 48 | 360 |
| 11 | Complete Solar | 46 | 59 |
| 12 | SOLAR SAVINGS DIRECT INC | 42 | 414 |
| 13 | Sunrise Solar | 38 | 151 |
| 14 | NORTH VALLEY LLC | 37 | 88 |
| 15 | BETTER EARTH ELECTRIC INC | 33 | 67 |
| 16 | Apex Solar, Inc. | 30 | 422 |
| 17 | FREEDOM FOREVER LLC | 28 | 282 |
| 18 | COOL ELECTRIC | 23 | 34 |
| 19 | DIAMOND SOLAR SOLUTIONS INC | 23 | 60 |
| 20 | SunPower | 23 | 1,133 |
| 21 | EXCITE ENERGY | 21 | 255 |
| 22 | Hooked On Solar | 21 | 491 |
| 23 | Sierra Energy Savers | 18 | 111 |
| 24 | SOLCORE INC | 18 | 18 |
| 25 | Sunriver Solar | 18 | 21 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 1,969 | 1,969 |
| 2 | V3 Electric | 1,679 | 1,679 |
| 3 | Sunrun | 1,628 | 1,628 |
| 4 | Leonard's Roofing, Inc. | 1,471 | 1,471 |
| 5 | SunPower | 1,133 | 1,133 |
| 6 | Gold Rush Energy Solutions | 600 | 600 |
| 7 | Citadel Roofing and Solar | 552 | 552 |
| 8 | Hooked On Solar | 491 | 491 |
| 9 | Bright Planet Solar | 457 | 457 |
| 10 | Apex Solar, Inc. | 422 | 422 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,478 | 417 |
| 2023 | 2,708 | 472 |
| 2024 | 1,562 | 998 |
| 2025 | 1,299 | 1,019 |
| 2026 (through Aug 31, 2026) | 788 | 639 |
Under the Net Billing Tariff (NEM 3.0)
2,675 of the 23,143 residential solar installs in El Dorado County (11.6% of the 23,140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in El Dorado County
| 1 | V3 Electric | 403 | 391 | 97.0% |
| 2 | Sunrun | 393 | 390 | 99.2% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 135 | 128 | 94.8% |
| 4 | SENGA ENERGY LLC | 117 | 109 | 93.2% |
| 5 | BRIGHT OPS | 101 | 97 | 96.0% |
| 6 | Leonard's Roofing, Inc. | 84 | 64 | 76.2% |
| 7 | GAF Energy | 80 | 79 | 98.8% |
| 8 | SOLAR SAVINGS DIRECT INC | 67 | 61 | 91.0% |
| 9 | NORTH VALLEY LLC | 64 | 63 | 98.4% |
| 10 | SolarHut, LLC | 52 | 39 | 75.0% |
| 11 | SOLAR AND ROOF DIRECT | 49 | 48 | 98.0% |
| 12 | Bright Planet Solar | 47 | 43 | 91.5% |
| 13 | FREEDOM FOREVER LLC | 47 | 45 | 95.7% |
| 14 | SunPower | 40 | 31 | 77.5% |
| 15 | BETTER EARTH ELECTRIC INC | 37 | 36 | 97.3% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in El Dorado County
| City | All-time installs |
|---|---|
| El Dorado Hills | 10,896 |
| Placerville | 3,637 |
| Cameron Park | 2,448 |
| Shingle Springs | 1,805 |
| Rescue | 880 |
| Cool | 644 |
| El Dorado | 548 |
| Diamond Springs | 356 |
| Camino | 340 |
| Somerset | 279 |
| Pollock Pines | 266 |
| Garden Valley | 231 |
| Pilot Hill | 202 |
| Georgetown | 166 |
| Greenwood | 97 |
| Lotus | 87 |
| Kelsey | 54 |
| Grizzly Flats | 53 |
| Mount Aukum | 48 |
| Coloma | 34 |
ZIP codes in El Dorado County
ZIP codes with their own page where the utilities recorded El Dorado County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95762 | 10,925 | 10,927 | 1,028 |
| 95682 | 4,244 | 4,244 | 414 |
| 95667 | 3,704 | 3,704 | 494 |
| 95672 | 880 | 880 | 98 |
| 95614 | 644 | 644 | 79 |
| 95623 | 543 | 543 | 71 |
| 95619 | 358 | 358 | 57 |
| 95709 | 341 | 341 | 53 |
| 95684 | 282 | 282 | 37 |
| 95726 | 268 | 268 | 35 |
| 95633 | 230 | 230 | 39 |
| 95664 | 202 | 202 | 21 |
| 95634 | 167 | 167 | 39 |
| 95635 | 95 | 96 | 9 |
| 95651 | 88 | 88 | 13 |
| 95636 | 52 | 52 | 15 |
| 95656 | 49 | 52 | 2 |
| 95613 | 36 | 75 | 3 |
Equipment recorded
In the last 24 months, 2,349 of El Dorado County’s 2,534 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (925, 39.4%) used modules recorded as Qcells.
In the last 24 months, 2,534 of El Dorado County’s 2,534 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,218, 48.1%) used inverters recorded as Tesla.
In the last 24 months, 1,664 of El Dorado County’s 2,534 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (967, 58.1%) used batteries recorded as Tesla.
3,398 of 4,255 battery-paired PG&E and SCE installs (79.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 925 | 4,847 |
| JA Solar | 364 | 745 | |
| LONGi | 265 | 1,305 | |
| REC | 135 | 1,566 | |
| Canadian Solar | 126 | 1,146 | |
| Inverter maker | Tesla | 1,218 | 2,407 |
| Enphase | 1,203 | 8,934 | |
| SolarEdge | 436 | 7,482 | |
| FranklinWH | 120 | not in top list | |
| SunPower | 67 | 1,877 | |
| Battery maker | Tesla | 967 | 1,697 |
| Enphase | 334 | 657 | |
| SolarEdge | 164 | 314 | |
| FranklinWH | 115 | 151 | |
| PointGuard Energy Inc. | 27 | 27 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 21,021 of 23,143 installs, inverters on 23,142. See the methodology and the equipment index.
SGIP battery storage projects in El Dorado County
The SGIP public project report downloaded Nov 16, 2026 lists 1,335 battery storage projects in El Dorado County with the status Paid, carrying $25,214,667 in current incentive allocations and 34,436 kWh of storage. Across every status it lists 2,092 storage projects there, 634 of them cancelled and 123 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1,335 | 34,436 | $25,214,667 |
| PBI in Process | 11 | 16,588 | $12,980,075 |
| Reserved | 62 | 1,258 | $1,578,534 |
| Pending Reservation | 16 | 302 | $593,109 |
| Cancelled | 634 | 27,935 | $19,234,894 |
| RRF Rejected | 34 | 485 | $79,003 |
Installers named on the most SGIP storage projects in El Dorado County
| Installer | Projects | Paid |
|---|---|---|
| V3 Electric | 290 | 194 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 257 | 172 |
| Hooked On Solar | 246 | 189 |
| Infinity Energy, Inc | 135 | 84 |
| Sunrun | 129 | 77 |
| Semper Solaris Construction Inc | 114 | 80 |
| SolarNorcal, LLC | 102 | 77 |
| SOLAR SAVINGS DIRECT INC | 70 | 30 |
| Gold Rush Energy Solutions | 68 | 49 |
| Tesla | 63 | 41 |
68 of the 2,092 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving El Dorado County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving El Dorado County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Liberty Utilities | Investor Owned | 837 | 744 | 5.366 | AC | 60 |
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in El Dorado County
13 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list El Dorado County as the county: 12 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 12 C-10 Electrical licenses in El Dorado County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in El Dorado County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 23,143
- Last 24 months
- 2,534
- Capacity
- 171.4 MW DC
- Median system size
- 6.9 kW DC
- With battery storage
- 18.4% all time; 79.0% last 24 months
- Third-party owned
- 26.2% where reported
- Ownership types recorded
- PPA 5,430, lease 555, prepaid lease 19, other 64
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jan 12, 2000
Common questions
How many homes in El Dorado County have solar?
23,143 residential solar systems in El Dorado County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,534 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in El Dorado County?
200 installer names have at least one install interconnected in El Dorado County in the last 24 months, and 980 appear in the full record.
How common are batteries with new solar in El Dorado County?
18.4% of the solar installs interconnected in El Dorado County include battery storage across all years, and 79.0% in the last 24 months (2,001 of 2,534).
How many solar installs in El Dorado County are under NEM 3.0?
2,675 of the 23,143 residential solar installs in El Dorado County (11.6% of the 23,140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.