Solar installers in San Joaquin County, California
Who installs the most solar in San Joaquin County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in San Joaquin County are Sunrun (3,452), Citadel Roofing and Solar (855) and GAF Energy (599). They account for 4,906 of the 10,905 residential solar installs interconnected there in that window.
In all, 64,446 homes in San Joaquin County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 274 installers with installs in this window. 122 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 3,452 | 11,137 |
| 2 | Citadel Roofing and Solar | 855 | 1,216 |
| 3 | GAF Energy | 599 | 606 |
| 4 | BRIGHT OPS | 529 | 626 |
| 5 | SonRay Construction Inc. | 464 | 1,267 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 420 | 7,484 |
| 7 | SOLARA HOME ENERGY LLC | 319 | 339 |
| 8 | V3 Electric | 295 | 719 |
| 9 | Complete Solar | 272 | 548 |
| 10 | SunPower | 234 | 4,993 |
| 11 | SENGA ENERGY LLC | 208 | 427 |
| 12 | FREEDOM FOREVER LLC | 195 | 1,536 |
| 13 | GRID Alternatives | 184 | 851 |
| 14 | Empower Electric Solar | 177 | 990 |
| 15 | ALLEN ELECTRIC INC | 144 | 488 |
| 16 | CALIFORNIA SOLAR PROS INC | 117 | 117 |
| 17 | POWER UP SOLUTIONS LLC | 113 | 136 |
| 18 | BETTER EARTH ELECTRIC INC | 110 | 451 |
| 19 | SIG SOLAR, S.I.G. | 85 | 440 |
| 20 | MARS BUILDER SOLUTIONS | 78 | 78 |
| 21 | Infinity Energy, Inc | 72 | 1,510 |
| 22 | AXIA SOLAR CORP | 70 | 71 |
| 23 | FIVE STAR SOLAR | 67 | 281 |
| 24 | Semper Solaris Construction Inc | 63 | 404 |
| 25 | NORTH VALLEY LLC | 62 | 202 |
Most installs, all time
| 1 | Sunrun | 11,137 | 11,137 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 7,484 | 7,484 |
| 3 | SunPower | 4,993 | 4,993 |
| 4 | Vivint Solar Developer, LLC | 3,696 | 3,696 |
| 5 | Bright Planet Solar | 2,032 | 2,032 |
| 6 | FREEDOM FOREVER LLC | 1,536 | 1,536 |
| 7 | Infinity Energy, Inc | 1,510 | 1,510 |
| 8 | SonRay Construction Inc. | 1,267 | 1,267 |
| 9 | Citadel Roofing and Solar | 1,216 | 1,216 |
| 10 | Empower Electric Solar | 990 | 990 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 8,461 | 502 |
| 2023 | 7,884 | 865 |
| 2024 | 5,340 | 3,045 |
| 2025 | 5,850 | 4,013 |
| 2026 (through Aug 31, 2026) | 3,183 | 2,064 |
Under the Net Billing Tariff (NEM 3.0)
9,679 of the 64,446 residential solar installs in San Joaquin County (15.0% of the 64,443 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.0% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in San Joaquin County
| 1 | Sunrun | 3,433 | 3,328 | 96.9% |
| 2 | BRIGHT OPS | 624 | 593 | 95.0% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 560 | 488 | 87.1% |
| 4 | FREEDOM FOREVER LLC | 345 | 317 | 91.9% |
| 5 | Citadel Roofing and Solar | 343 | 22 | 6.4% |
| 6 | V3 Electric | 339 | 331 | 97.6% |
| 7 | Empower Electric Solar | 316 | 266 | 84.2% |
| 8 | GRID Alternatives | 297 | 140 | 47.1% |
| 9 | SENGA ENERGY LLC | 226 | 222 | 98.2% |
| 10 | BETTER EARTH ELECTRIC INC | 165 | 158 | 95.8% |
| 11 | NORTH VALLEY LLC | 134 | 133 | 99.3% |
| 12 | POWER UP SOLUTIONS LLC | 125 | 122 | 97.6% |
| 13 | SunPower | 125 | 110 | 88.0% |
| 14 | SIG SOLAR, S.I.G. | 116 | 106 | 91.4% |
| 15 | Bright Planet Solar | 115 | 30 | 26.1% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in San Joaquin County
| City | All-time installs |
|---|---|
| Stockton | 27,302 |
| Manteca | 14,836 |
| Tracy | 12,015 |
| Lathrop | 4,001 |
| Ripon | 1,417 |
| Escalon | 1,308 |
| Lodi | 969 |
| Acampo | 863 |
| Linden | 477 |
| Woodbridge | 344 |
| Lockeford | 335 |
| French Camp | 158 |
| Clements | 151 |
| Galt | 53 |
| Thornton | 48 |
| Farmington | 27 |
| Oakdale | 25 |
| Banta | 8 |
| Victor | 8 |
| Vernalis | 6 |
ZIP codes in San Joaquin County
ZIP codes with their own page where the utilities recorded San Joaquin County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95337 | 9,110 | 9,110 | 2,363 |
| 95336 | 5,693 | 5,694 | 737 |
| 95377 | 5,365 | 5,366 | 984 |
| 95376 | 5,191 | 5,191 | 423 |
| 95206 | 4,892 | 4,892 | 783 |
| 95209 | 4,829 | 4,830 | 596 |
| 95330 | 4,001 | 4,001 | 1,025 |
| 95219 | 3,505 | 3,505 | 769 |
| 95212 | 3,499 | 3,499 | 520 |
| 95207 | 2,407 | 2,407 | 351 |
| 95204 | 2,068 | 2,068 | 315 |
| 95210 | 2,026 | 2,026 | 282 |
| 95205 | 1,721 | 1,721 | 362 |
| 95215 | 1,625 | 1,625 | 358 |
| 95304 | 1,457 | 1,457 | 124 |
| 95366 | 1,417 | 1,417 | 167 |
| 95320 | 1,309 | 1,310 | 124 |
| 95220 | 864 | 864 | 90 |
| 95203 | 676 | 676 | 112 |
| 95240 | 669 | 669 | 61 |
| 95236 | 478 | 498 | 50 |
| 95258 | 344 | 344 | 44 |
| 95237 | 336 | 336 | 33 |
| 95242 | 303 | 303 | 62 |
| 95231 | 159 | 159 | 31 |
| 95227 | 148 | 148 | 22 |
| 95632 | 53 | 105 | 17 |
| 95202 | 52 | 52 | 6 |
| 95686 | 48 | 48 | 9 |
| 95230 | 27 | 35 | 2 |
Equipment recorded
In the last 24 months, 10,218 of San Joaquin County’s 10,905 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4,041, 39.5%) used modules recorded as Qcells.
In the last 24 months, 10,905 of San Joaquin County’s 10,905 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5,502, 50.5%) used inverters recorded as Enphase.
In the last 24 months, 5,702 of San Joaquin County’s 10,905 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3,375, 59.2%) used batteries recorded as Tesla.
9,019 of 11,127 battery-paired PG&E and SCE installs (81.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 4,041 | 14,349 |
| JA Solar | 2,392 | 4,741 | |
| Silfab | 1,051 | not in top list | |
| LONGi | 954 | 5,135 | |
| Canadian Solar | 453 | 3,708 | |
| Inverter maker | Enphase | 5,502 | 22,846 |
| Tesla | 4,638 | 6,709 | |
| SolarEdge | 1,979 | 21,633 | |
| FranklinWH | 323 | not in top list | |
| SunPower | 223 | 6,351 | |
| Battery maker | Tesla | 3,375 | 4,679 |
| Enphase | 1,083 | 1,770 | |
| SolarEdge | 729 | 1,266 | |
| FranklinWH | 318 | 381 | |
| LG | 73 | 531 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59,197 of 64,446 installs, inverters on 64,442. See the methodology and the equipment index.
SGIP battery storage projects in San Joaquin County
The SGIP public project report downloaded Nov 16, 2026 lists 556 battery storage projects in San Joaquin County with the status Paid, carrying $7,570,979 in current incentive allocations and 15,212 kWh of storage. Across every status it lists 1,198 storage projects there, 326 of them cancelled and 316 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 556 | 15,212 | $7,570,979 |
| PBI in Process | 22 | 24,018 | $7,596,139 |
| Reserved | 214 | 53,910 | $14,181,196 |
| Pending Reservation | 11 | 343 | $829,556 |
| Waitlist | 1 | 13 | $14,520 |
| Cancelled | 326 | 65,881 | $22,470,949 |
| RRF Rejected | 68 | 847 | $130,610 |
Installers named on the most SGIP storage projects in San Joaquin County
| Installer | Projects | Paid |
|---|---|---|
| GRID Alternatives | 211 | 128 |
| Semper Solaris Construction Inc | 136 | 76 |
| Sunrun | 122 | 82 |
| Infinity Energy, Inc | 46 | 31 |
| SOLAR SAVINGS DIRECT INC | 45 | 2 |
| HAVEN ENERGY SERVICES INC | 42 | 9 |
| SOLAR 4 AMERICA | 39 | 26 |
| PetersenDean | 36 | 25 |
| Vivint Solar Developer, LLC | 35 | 4 |
| Hooked On Solar | 26 | 22 |
173 of the 1,198 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving San Joaquin County (EIA)
EIA’s 2025 Service Territory file lists 6 utilities serving San Joaquin County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Modesto Irrigation District | Political Subdivision | 12,254 | 11,986 | 95.713 | AC | 1,175 |
| City of Lodi - (CA) | Municipal | 710 | 643 | 7.701 | AC | 0 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Lathrop Irrigation District; Port of Stockton - (CA); WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
San Joaquin County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in San Joaquin County
17 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list San Joaquin County as the county: 13 with the business type Corporation, Limited Liability, Partnership or JointVenture and 4 Sole Owner. 9 C-10 Electrical licenses in San Joaquin County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in San Joaquin County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 64,446
- Last 24 months
- 10,905
- Capacity
- 420.4 MW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 17.3% all time; 66.4% last 24 months
- Third-party owned
- 36.9% where reported
- Ownership types recorded
- PPA 18,168, lease 4,633, prepaid lease 87, other 862
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jan 10, 2000
Common questions
How many homes in San Joaquin County have solar?
64,446 residential solar systems in San Joaquin County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 10,905 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in San Joaquin County?
274 installer names have at least one install interconnected in San Joaquin County in the last 24 months, and 1,277 appear in the full record.
How common are batteries with new solar in San Joaquin County?
17.3% of the solar installs interconnected in San Joaquin County include battery storage across all years, and 66.4% in the last 24 months (7,244 of 10,905).
How many solar installs in San Joaquin County are under NEM 3.0?
9,679 of the 64,446 residential solar installs in San Joaquin County (15.0% of the 64,443 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.