Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Lakeside are Sunrun (106), GAF Energy (39) and Bright Planet Solar (35). They account for 180 of the 443 residential solar installs interconnected there in that window.
In all, 5,557 homes in Lakeside have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 84 installers with installs in this window. 25 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 106 | 623 |
| 2 | GAF Energy | 39 | 39 |
| 3 | Bright Planet Solar | 35 | 196 |
| 4 | Simms Solar Electric Inc. | 28 | 79 |
| 5 | Baker Electric, Inc. | 26 | 336 |
| 6 | CalSolar | 18 | 34 |
| 7 | Semper Solaris Construction Inc | 16 | 320 |
| 8 | Solartech | 10 | 118 |
| 9 | Aloha Solar Power | 7 | 21 |
| 10 | Freedom Solar Co | 7 | 69 |
| 11 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 7 | 8 |
| 12 | Blalock electric | 6 | 35 |
| 13 | California Premier Solar | 5 | 12 |
| 14 | EXO Energy | 4 | 44 |
| 15 | Tesla Energy Operations (formerly SolarCity) | 4 | 375 |
| 16 | BETTER EARTH ELECTRIC INC | 3 | 8 |
| 17 | Cyberdyne construction | 3 | 7 |
| 18 | New Day Solar | 3 | 11 |
| 19 | PALOMAR SOLAR LTD | 3 | 60 |
| 20 | PEAK ENERGY GROUP | 3 | 3 |
| 21 | Raneri and Long | 3 | 46 |
| 22 | Shorebreak Electric | 3 | 3 |
| 23 | Solar Optimum Inc. | 3 | 9 |
| 24 | Solar Permit Specialists | 3 | 11 |
| 25 | Wave Electric Energy | 3 | 25 |
Most installs, all time
| 1 | Sunrun | 623 | 623 |
| 2 | Vivint Solar Developer, LLC | 423 | 423 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 375 | 375 |
| 4 | Baker Electric, Inc. | 336 | 336 |
| 5 | Semper Solaris Construction Inc | 320 | 320 |
| 6 | Bright Planet Solar | 196 | 196 |
| 7 | Solartech | 118 | 118 |
| 8 | SunPower | 112 | 112 |
| 9 | Sullivan Solar Power | 86 | 86 |
| 10 | Stellar Solar | 80 | 80 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 555 | 0 |
| 2023 | 496 | 0 |
| 2024 | 250 | 0 |
| 2025 | 227 | 0 |
| 2026 (through Aug 31, 2026) | 128 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
501 of the 5,557 residential solar installs in Lakeside (9.0% of the 5,557 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Lakeside
| 1 | Sunrun | 143 | 0 | not recorded |
| 2 | Bright Planet Solar | 56 | 0 | not recorded |
| 3 | GAF Energy | 39 | 0 | not recorded |
| 4 | Semper Solaris Construction Inc | 33 | 0 | not recorded |
| 5 | Baker Electric, Inc. | 26 | 0 | not recorded |
| 6 | Solartech | 14 | 0 | not recorded |
| 7 | Freedom Solar Co | 13 | 0 | not recorded |
| 8 | California Premier Solar | 10 | 0 | not recorded |
| 9 | Simms Solar Electric Inc. | 9 | 0 | not recorded |
| 10 | Blalock electric | 8 | 0 | not recorded |
| 11 | Aloha Solar Power | 7 | 0 | not recorded |
| 12 | SunPower | 6 | 0 | not recorded |
| 13 | Tesla Energy Operations (formerly SolarCity) | 6 | 0 | not recorded |
| 14 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 5 | 0 | not recorded |
| 15 | Stellar Solar | 5 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 362 of Lakeside’s 443 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (115, 31.8%) used modules recorded as Qcells.
In the last 24 months, 443 of Lakeside’s 443 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (236, 53.3%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 115 | 721 |
| Canadian Solar | 54 | 277 | |
| LONGi | 51 | not in top list | |
| Silfab | 31 | 206 | |
| BovietSolarTechnologyCo.,Ltd. | 18 | not in top list | |
| Inverter maker | Tesla | 236 | 284 |
| Enphase | 150 | 2,033 | |
| SolarEdge | 77 | 1,850 | |
| SMA | 9 | 423 | |
| ABB | 5 | 240 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,762 of 5,557 installs, inverters on 5,336. See the methodology and the equipment index.
ZIP codes in Lakeside
ZIP codes with their own page where the utilities recorded Lakeside on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92040 | 5,557 | 5,557 | 443 |
SGIP battery storage projects in Lakeside
The SGIP report lists 192 battery storage projects with the city Lakeside, 113 with the status Paid ($1,815,094 in current incentive allocations, 2,719 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 113 | 2,719 | $1,815,094 |
| PBI in Process | 2 | 647 | $179,074 |
| Reserved | 4 | 59 | $94,019 |
| Pending Reservation | 1 | 10 | $23,758 |
| Cancelled | 69 | 1,539 | $838,551 |
| RRF Rejected | 3 | 35 | $5,399 |
Installers named on the most SGIP storage projects in Lakeside
35 of the 192 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 5,557
- Last 24 months
- 443
- Capacity
- 39.8 MW DC
- Median system size
- 6.3 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 33.6% where reported
- Ownership types recorded
- PPA 1,209, lease 225, prepaid lease 8, other 85
- Earliest install in data
- May 22, 2001
Common questions
How many homes in Lakeside have solar?
5,557 residential solar systems in Lakeside were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 443 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Lakeside?
84 installer names have at least one install interconnected in Lakeside in the last 24 months, and 450 appear in the full record.
How common are batteries with new solar in Lakeside?
Battery storage is not recorded on the solar installs interconnected in Lakeside: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in Lakeside are under NEM 3.0?
501 of the 5,557 residential solar installs in Lakeside (9.0% of the 5,557 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.