Solar installers in Colusa County, California

Who installs the most solar in Colusa County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Colusa County are Sunrun (74), Citadel Roofing and Solar (22) and FREEDOM FOREVER LLC (16). They account for 112 of the 239 residential solar installs interconnected there in that window.

In all, 2,137 homes in Colusa County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 45 installers with installs in this window. 5 installs in the window were self-installed or had no installer recorded.

1Sunrun74204
2Citadel Roofing and Solar2247
3FREEDOM FOREVER LLC16107
4NORTH STATE SOLAR ENERGY CONSTRUCTION1358
5NORTH VALLEY LLC1228
6OHM SOLAR SOLUTIONS1242
7Westhaven Inc12110
8BRIGHT OPS1119
9C M C O ELECTRIC SOLAR915
10ALSCO - GEYER IRRIGATION INC34
11BETTER EARTH ELECTRIC INC317
12FREEDOM FOREVER NORTHERN CALIFORNIA LLC33
13RME INNOVATIONS INC33
14Tesla Energy Operations (formerly SolarCity)3196
15Alternative Energy Systems, Inc.222
16AXIA SOLAR CORP22
17Complete Solar211
18CONTINUUM22
19POWER UP SOLUTIONS LLC23
20PREMIER SOLAR ENERGY INC292
21V3 Electric226
22ACCELERATED ENVIRONMENTAL SERVICES INC11
23AMBROSE SOLAR14
24Bright Planet Solar130
25CALIFORNIA RENEWABLE ENERGY12

Most installs, all time

1Sunrun204204
2Tesla Energy Operations (formerly SolarCity)196196
3Vivint Solar Developer, LLC165165
4Westhaven Inc110110
5FREEDOM FOREVER LLC107107
6North State Solar Energy107107
7PREMIER SOLAR ENERGY INC9292
8Sunworks6262
9NORTH STATE SOLAR ENERGY CONSTRUCTION5858
10Citadel Roofing and Solar4747

Installs by year

YearInstalls interconnectedWith battery storage
20221967
202329318
2024161118
202511392
2026 (through Aug 31, 2026)6041

Under the Net Billing Tariff (NEM 3.0)

281 of the 2,137 residential solar installs in Colusa County (13.1% of the 2,137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.2% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Colusa County

1Sunrun9494100.0%
2FREEDOM FOREVER LLC211990.5%
3BRIGHT OPS1919100.0%
4Westhaven Inc1616100.0%
5NORTH VALLEY LLC1515100.0%
6OHM SOLAR SOLUTIONS1313100.0%
7PREMIER SOLAR ENERGY INC7685.7%
8C M C O ELECTRIC SOLAR66100.0%
9NORTH STATE SOLAR ENERGY CONSTRUCTION6466.7%
10V3 Electric66100.0%
11Bright Planet Solar55100.0%
12Empower Electric Solar5360.0%
13LEVION CONSTRUCTION LLC44100.0%
14A P ELECTRICAL300.0%
15BETTER EARTH ELECTRIC INC33100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Colusa County

CityAll-time installs
Colusa798
Williams581
Arbuckle504
Maxwell116
Princeton45
Stonyford33
College City27
Grimes27
Knights Landing1

ZIP codes in Colusa County

ZIP codes with their own page where the utilities recorded Colusa County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

95932798798107
9598758058052
9591253153255
9595511611610
9597046556
9597933333
9595027273

Equipment recorded

In the last 24 months, 221 of Colusa County’s 239 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (63, 28.5%) used modules recorded as Qcells.

In the last 24 months, 239 of Colusa County’s 239 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (112, 46.9%) used inverters recorded as Tesla.

In the last 24 months, 144 of Colusa County’s 239 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (69, 47.9%) used batteries recorded as Tesla.

232 of 291 battery-paired PG&E and SCE installs (79.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells63395
LONGi48165
JA Solar4099
Silfab24not in top list
Trina Solar16106
Inverter makerTesla112145
Enphase86839
SolarEdge57645
FranklinWH9not in top list
APsystems (Altenergy Power System)5not in top list
Battery makerTesla6996
Enphase3664
SolarEdge2746
FranklinWH910
PointGuard Energy Inc.22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,965 of 2,137 installs, inverters on 2,137. See the methodology and the equipment index.

SGIP battery storage projects in Colusa County

The SGIP public project report downloaded Nov 16, 2026 lists 7 battery storage projects in Colusa County with the status Paid, carrying $19,546 in current incentive allocations and 129 kWh of storage. Across every status it lists 24 storage projects there, 9 of them cancelled and 8 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid7129$19,546
PBI in Process1992$218,240
Reserved5237$77,186
Cancelled9833$326,568
RRF Rejected219$2,912

Installers named on the most SGIP storage projects in Colusa County

InstallerProjectsPaid
Hooked On Solar33
Infinity Energy, Inc31
ADT SOLAR LLC20
Semper Solaris Construction Inc21
Sunpro Solar20
Westhaven Solar20
AMBROSE SOLAR10
Chico Electric10
Enable Energy10
GREEN DAY POWER10

3 of the 24 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Colusa County (EIA)

EIA’s 2025 Service Territory file lists 2 utilities serving Colusa County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

At a glance

Residential solar installs
2,137
Last 24 months
239
Capacity
16 MW DC
Median system size
6.7 kW DC
With battery storage
13.6% all time; 78.7% last 24 months
Third-party owned
33.7% where reported
Ownership types recorded
PPA 561, lease 142, prepaid lease 3, other 14
Median battery size
13.5 kWh
Earliest install in data
Jan 28, 2002

Common questions

How many homes in Colusa County have solar?

2,137 residential solar systems in Colusa County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 239 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Colusa County?

45 installer names have at least one install interconnected in Colusa County in the last 24 months, and 236 appear in the full record.

How common are batteries with new solar in Colusa County?

13.6% of the solar installs interconnected in Colusa County include battery storage across all years, and 78.7% in the last 24 months (188 of 239).

How many solar installs in Colusa County are under NEM 3.0?

281 of the 2,137 residential solar installs in Colusa County (13.1% of the 2,137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.