Solar installers in Mendocino County, California
Who installs the most solar in Mendocino County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Mendocino County are Mendocino Solar Service (52), BRIGHT OPS (41) and FREEDOM FOREVER LLC (34). They account for 127 of the 385 residential solar installs interconnected there in that window.
In all, 3,254 homes in Mendocino County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 70 installers with installs in this window. 46 installs in the window were self-installed or had no installer recorded.
| 1 | Mendocino Solar Service | 52 | 478 |
| 2 | BRIGHT OPS | 41 | 44 |
| 3 | FREEDOM FOREVER LLC | 34 | 142 |
| 4 | GRID Alternatives | 18 | 154 |
| 5 | Sunrun | 18 | 39 |
| 6 | V3 Electric | 15 | 17 |
| 7 | POWUR HOME CONSTRUCTION | 14 | 14 |
| 8 | Radiant Solar Technology | 13 | 164 |
| 9 | M D ELECTRIC & SOLAR INC | 12 | 49 |
| 10 | A C & R SERVICE HEATING & COOLING INC | 10 | 22 |
| 11 | Tesla Energy Operations (formerly SolarCity) | 8 | 53 |
| 12 | A P ELECTRICAL | 6 | 11 |
| 13 | REDWOOD ELECTRICAL SERVICES/R E S | 6 | 16 |
| 14 | NOYO ELECTRIC AND SOLAR INC | 5 | 18 |
| 15 | AXIA SOLAR CORP | 4 | 4 |
| 16 | SOLAR AND ROOF DIRECT | 4 | 4 |
| 17 | BETTER EARTH ELECTRIC INC | 3 | 27 |
| 18 | Fort Bragg Electric | 3 | 20 |
| 19 | ORIGIN SOLAR USA INC | 3 | 3 |
| 20 | SENGA ENERGY LLC | 3 | 6 |
| 21 | SUSTAINABLE LIVING BUILDERS INC | 3 | 3 |
| 22 | VITAL ENERGY SOLUTIONS LLC | 3 | 3 |
| 23 | ABUNDANCE BUILDERS | 2 | 7 |
| 24 | Eclectric Solar | 2 | 18 |
| 25 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 2 | 2 |
Most installs, all time
| 1 | Mendocino Solar Service | 478 | 478 |
| 2 | Radiant Solar Technology | 164 | 164 |
| 3 | GRID Alternatives | 154 | 154 |
| 4 | FREEDOM FOREVER LLC | 142 | 142 |
| 5 | Real Goods Solar | 76 | 76 |
| 6 | RISE ENERGY | 75 | 75 |
| 7 | Rock Mountain Electric | 66 | 66 |
| 8 | Gaia Energy Systems | 56 | 56 |
| 9 | Roger | 53 | 53 |
| 10 | Tesla Energy Operations (formerly SolarCity) | 53 | 53 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 282 | 48 |
| 2023 | 454 | 44 |
| 2024 | 195 | 82 |
| 2025 | 200 | 135 |
| 2026 (through Aug 31, 2026) | 119 | 94 |
Under the Net Billing Tariff (NEM 3.0)
389 of the 3,254 residential solar installs in Mendocino County (12.0% of the 3,254 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.7% of those include battery storage. The latest was approved Aug 25, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Mendocino County
| 1 | Mendocino Solar Service | 72 | 51 | 70.8% |
| 2 | BRIGHT OPS | 44 | 37 | 84.1% |
| 3 | FREEDOM FOREVER LLC | 36 | 36 | 100.0% |
| 4 | Sunrun | 25 | 25 | 100.0% |
| 5 | V3 Electric | 16 | 16 | 100.0% |
| 6 | GRID Alternatives | 14 | 13 | 92.9% |
| 7 | POWUR HOME CONSTRUCTION | 14 | 14 | 100.0% |
| 8 | M D ELECTRIC & SOLAR INC | 11 | 10 | 90.9% |
| 9 | Radiant Solar Technology | 11 | 5 | 45.5% |
| 10 | A C & R SERVICE HEATING & COOLING INC | 10 | 9 | 90.0% |
| 11 | Tesla Energy Operations (formerly SolarCity) | 10 | 10 | 100.0% |
| 12 | A P ELECTRICAL | 6 | 6 | 100.0% |
| 13 | FORT BRAGG ELECTRIC INC | 6 | 3 | 50.0% |
| 14 | REDWOOD ELECTRICAL SERVICES/R E S | 5 | 3 | 60.0% |
| 15 | AXIA SOLAR CORP | 4 | 4 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Mendocino County
| City | All-time installs |
|---|---|
| Fort Bragg | 765 |
| Ukiah | 648 |
| Willits | 396 |
| Redwood Valley | 356 |
| Mendocino | 159 |
| Gualala | 149 |
| Covelo | 94 |
| Potter Valley | 81 |
| Boonville | 76 |
| Point Arena | 72 |
| Hopland | 67 |
| Philo | 67 |
| Albion | 60 |
| Laytonville | 49 |
| Little River | 43 |
| Manchester | 36 |
| Caspar | 26 |
| Elk | 24 |
| Comptche | 20 |
| Yorkville | 20 |
ZIP codes in Mendocino County
ZIP codes with their own page where the utilities recorded Mendocino County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95437 | 766 | 766 | 79 |
| 95482 | 648 | 648 | 90 |
| 95490 | 396 | 396 | 59 |
| 95470 | 356 | 356 | 40 |
| 95460 | 160 | 160 | 19 |
| 95445 | 149 | 149 | 17 |
| 95428 | 94 | 94 | 9 |
| 95469 | 81 | 81 | 5 |
| 95415 | 77 | 77 | 6 |
| 95468 | 73 | 73 | 10 |
| 95449 | 67 | 67 | 11 |
| 95466 | 66 | 66 | 7 |
| 95410 | 61 | 61 | 4 |
| 95454 | 50 | 50 | 2 |
| 95456 | 42 | 42 | 5 |
| 95459 | 36 | 36 | 4 |
| 95420 | 26 | 26 | 2 |
Equipment recorded
In the last 24 months, 368 of Mendocino County’s 385 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (127, 34.5%) used modules recorded as Qcells.
In the last 24 months, 385 of Mendocino County’s 385 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (158, 41.0%) used inverters recorded as Enphase.
In the last 24 months, 232 of Mendocino County’s 385 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (80, 34.5%) used batteries recorded as Enphase.
376 of 458 battery-paired PG&E and SCE installs (82.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 127 | 486 |
| Silfab | 56 | 260 | |
| JA Solar | 48 | not in top list | |
| Mission Solar | 25 | not in top list | |
| REC | 20 | 130 | |
| Inverter maker | Enphase | 158 | 1,024 |
| Tesla | 96 | 148 | |
| SolarEdge | 86 | 735 | |
| Sol-Ark | 23 | 71 | |
| SMA | 13 | 687 | |
| Battery maker | Enphase | 80 | 148 |
| Tesla | 76 | 114 | |
| SolarEdge | 55 | 60 | |
| PointGuard Energy Inc. | 8 | 8 | |
| FranklinWH | 5 | 8 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,099 of 3,254 installs, inverters on 3,254. See the methodology and the equipment index.
SGIP battery storage projects in Mendocino County
The SGIP public project report downloaded Nov 16, 2026 lists 105 battery storage projects in Mendocino County with the status Paid, carrying $1,551,528 in current incentive allocations and 2,389 kWh of storage. Across every status it lists 258 storage projects there, 85 of them cancelled and 68 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 105 | 2,389 | $1,551,528 |
| PBI in Process | 8 | 5,600 | $4,935,559 |
| Reserved | 50 | 955 | $1,234,307 |
| Pending Reservation | 6 | 179 | $251,394 |
| Waitlist | 2 | 28 | $31,285 |
| Cancelled | 85 | 10,126 | $6,260,782 |
| RRF Rejected | 2 | 26 | $4,620 |
Installers named on the most SGIP storage projects in Mendocino County
40 of the 258 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Mendocino County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving Mendocino County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: City of Ukiah - (CA). For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Mendocino County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Mendocino County
13 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Mendocino County as the county: 5 with the business type Corporation, Limited Liability, Partnership or JointVenture and 8 Sole Owner. 7 C-10 Electrical licenses in Mendocino County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Mendocino County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 3,254
- Last 24 months
- 385
- Capacity
- 21.8 MW DC
- Median system size
- 5.6 kW DC
- With battery storage
- 14.1% all time; 69.1% last 24 months
- Third-party owned
- 14.4% where reported
- Ownership types recorded
- PPA 290, lease 130, prepaid lease 1, other 47
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jan 1, 1997
Common questions
How many homes in Mendocino County have solar?
3,254 residential solar systems in Mendocino County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 385 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Mendocino County?
70 installer names have at least one install interconnected in Mendocino County in the last 24 months, and 386 appear in the full record.
How common are batteries with new solar in Mendocino County?
14.1% of the solar installs interconnected in Mendocino County include battery storage across all years, and 69.1% in the last 24 months (266 of 385).
How many solar installs in Mendocino County are under NEM 3.0?
389 of the 3,254 residential solar installs in Mendocino County (12.0% of the 3,254 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.