Solar installers in Butte County, California
Who installs the most solar in Butte County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Butte County are Sunrun (387), OHM SOLAR SOLUTIONS (205) and BRIGHT OPS (155). They account for 747 of the 2,695 residential solar installs interconnected there in that window.
In all, 22,000 homes in Butte County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 189 installers with installs in this window. 373 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 387 | 1,288 |
| 2 | OHM SOLAR SOLUTIONS | 205 | 844 |
| 3 | BRIGHT OPS | 155 | 174 |
| 4 | URBAN DESIGN | 123 | 491 |
| 5 | Alternative Energy Systems, Inc. | 112 | 2,117 |
| 6 | Royal Aire, Inc. | 87 | 993 |
| 7 | UNDER THE SUN SOLAR AND ELECTRIC | 73 | 73 |
| 8 | FREEDOM FOREVER LLC | 65 | 566 |
| 9 | WEBB BILL CONSTRUCTION INC | 65 | 137 |
| 10 | BLM HOLDINGS INC | 51 | 254 |
| 11 | FEATHER RIVER AIRE AND SOLAR | 48 | 317 |
| 12 | REVAMP SOLAR ENERGY LLC | 48 | 213 |
| 13 | Westhaven Inc | 45 | 359 |
| 14 | American Dream Construction, Inc | 44 | 91 |
| 15 | Tesla Energy Operations (formerly SolarCity) | 40 | 1,527 |
| 16 | United Sun Energy | 34 | 517 |
| 17 | PREMIER SOLAR ENERGY INC | 30 | 475 |
| 18 | CHICO SOLAR WORKS | 24 | 206 |
| 19 | V3 Electric | 24 | 158 |
| 20 | SAC TOWN ELECTRIC | 23 | 24 |
| 21 | SENGA ENERGY LLC | 23 | 74 |
| 22 | B J K CONSTRUCTORS | 22 | 25 |
| 23 | GRID Alternatives | 20 | 170 |
| 24 | CALIFORNIA BUILDERS | 19 | 90 |
| 25 | AXIA SOLAR CORP | 16 | 16 |
Most installs, all time
| 1 | Alternative Energy Systems, Inc. | 2,117 | 2,117 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,527 | 1,527 |
| 3 | Sunrun | 1,288 | 1,288 |
| 4 | Vivint Solar Developer, LLC | 1,063 | 1,063 |
| 5 | Royal Aire, Inc. | 993 | 993 |
| 6 | OHM SOLAR SOLUTIONS | 844 | 844 |
| 7 | FREEDOM FOREVER LLC | 566 | 566 |
| 8 | United Sun Energy | 517 | 517 |
| 9 | URBAN DESIGN | 491 | 491 |
| 10 | PREMIER SOLAR ENERGY INC | 475 | 475 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,325 | 110 |
| 2023 | 3,060 | 194 |
| 2024 | 1,541 | 724 |
| 2025 | 1,471 | 820 |
| 2026 (through Aug 31, 2026) | 755 | 366 |
Under the Net Billing Tariff (NEM 3.0)
2,742 of the 22,000 residential solar installs in Butte County (12.5% of the 21,999 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Butte County
| 1 | Sunrun | 420 | 419 | 99.8% |
| 2 | OHM SOLAR SOLUTIONS | 235 | 220 | 93.6% |
| 3 | BRIGHT OPS | 173 | 154 | 89.0% |
| 4 | URBAN DESIGN | 130 | 77 | 59.2% |
| 5 | FREEDOM FOREVER LLC | 96 | 89 | 92.7% |
| 6 | Royal Aire, Inc. | 75 | 65 | 86.7% |
| 7 | Alternative Energy Systems, Inc. | 72 | 62 | 86.1% |
| 8 | PREMIER SOLAR ENERGY INC | 72 | 67 | 93.1% |
| 9 | UNDER THE SUN SOLAR AND ELECTRIC | 69 | 0 | 0.0% |
| 10 | American Dream Construction, Inc | 67 | 3 | 4.5% |
| 11 | REVAMP SOLAR ENERGY LLC | 55 | 30 | 54.5% |
| 12 | Tesla Energy Operations (formerly SolarCity) | 54 | 50 | 92.6% |
| 13 | Westhaven Inc | 52 | 50 | 96.2% |
| 14 | WEBB BILL CONSTRUCTION INC | 46 | 11 | 23.9% |
| 15 | FEATHER RIVER AIRE AND SOLAR | 42 | 38 | 90.5% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Butte County
| City | All-time installs |
|---|---|
| Chico | 12,798 |
| Oroville | 4,443 |
| Paradise | 2,630 |
| Durham | 611 |
| Gridley | 494 |
| Magalia | 348 |
| Biggs | 157 |
| Forest Ranch | 122 |
| Bangor | 97 |
| Palermo | 96 |
| Berry Creek | 58 |
| Richvale | 49 |
| Cohasset | 28 |
| Butte Valley | 12 |
| Nelson | 10 |
| Forbestown | 7 |
| Butte Meadows | 4 |
| Stirling City | 4 |
| Yankee Hill | 3 |
| Clipper Mills | 2 |
ZIP codes in Butte County
ZIP codes with their own page where the utilities recorded Butte County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95973 | 5,578 | 5,579 | 515 |
| 95928 | 3,786 | 3,786 | 337 |
| 95926 | 3,452 | 3,453 | 297 |
| 95966 | 2,968 | 2,968 | 356 |
| 95969 | 2,622 | 2,622 | 722 |
| 95965 | 1,515 | 1,517 | 172 |
| 95938 | 610 | 610 | 56 |
| 95948 | 493 | 493 | 43 |
| 95954 | 349 | 349 | 98 |
| 95917 | 157 | 157 | 13 |
| 95942 | 125 | 125 | 16 |
| 95914 | 92 | 95 | 6 |
| 95968 | 86 | 86 | 18 |
| 95916 | 57 | 57 | 12 |
| 95974 | 48 | 48 | 5 |
Equipment recorded
In the last 24 months, 2,520 of Butte County’s 2,695 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (710, 28.2%) used modules recorded as Qcells.
In the last 24 months, 2,695 of Butte County’s 2,695 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,699, 63.0%) used inverters recorded as Enphase.
In the last 24 months, 1,287 of Butte County’s 2,695 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (565, 43.9%) used batteries recorded as Tesla.
2,117 of 2,518 battery-paired PG&E and SCE installs (84.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 710 | 4,940 |
| LONGi | 406 | 1,075 | |
| Canadian Solar | 293 | 2,497 | |
| JA Solar | 284 | not in top list | |
| Mission Solar | 124 | not in top list | |
| Inverter maker | Enphase | 1,699 | 12,123 |
| Tesla | 723 | 1,271 | |
| SolarEdge | 418 | 4,587 | |
| SMA | 47 | 1,452 | |
| APsystems (Altenergy Power System) | 40 | not in top list | |
| Battery maker | Tesla | 565 | 946 |
| Enphase | 503 | 783 | |
| SolarEdge | 177 | 240 | |
| FranklinWH | 17 | 25 | |
| PointGuard Energy Inc. | 13 | 13 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20,110 of 22,000 installs, inverters on 21,998. See the methodology and the equipment index.
SGIP battery storage projects in Butte County
The SGIP public project report downloaded Nov 16, 2026 lists 342 battery storage projects in Butte County with the status Paid, carrying $5,027,323 in current incentive allocations and 8,423 kWh of storage. Across every status it lists 603 storage projects there, 190 of them cancelled and 71 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 342 | 8,423 | $5,027,323 |
| PBI in Process | 6 | 5,982 | $5,261,568 |
| Reserved | 38 | 727 | $951,133 |
| Pending Reservation | 9 | 132 | $196,167 |
| Cancelled | 190 | 8,016 | $4,873,298 |
| RRF Rejected | 18 | 263 | $40,224 |
Installers named on the most SGIP storage projects in Butte County
| Installer | Projects | Paid |
|---|---|---|
| Alternative Energy Systems, Inc. | 112 | 83 |
| Infinity Energy, Inc | 76 | 46 |
| Hooked On Solar | 69 | 52 |
| HAVEN ENERGY SERVICES INC | 32 | 7 |
| V3 Electric | 30 | 15 |
| Phoenix Solar Energy | 29 | 11 |
| Sunrun | 27 | 18 |
| Climate and Energy Solutions | 26 | 11 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 19 | 13 |
| GRID Alternatives | 17 | 15 |
31 of the 603 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Butte County (EIA)
EIA’s 2025 Service Territory file lists 4 utilities serving Butte County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: City of Biggs - (CA); City of Gridley - (CA); WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Butte County
16 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Butte County as the county: 13 with the business type Corporation, Limited Liability, Partnership or JointVenture and 3 Sole Owner. 12 C-10 Electrical licenses in Butte County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Butte County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 22,000
- Last 24 months
- 2,695
- Capacity
- 164.3 MW DC
- Median system size
- 6.7 kW DC
- With battery storage
- 11.4% all time; 55.0% last 24 months
- Third-party owned
- 16.5% where reported
- Ownership types recorded
- PPA 2,815, lease 663, prepaid lease 12, other 148
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jul 12, 2001
Common questions
How many homes in Butte County have solar?
22,000 residential solar systems in Butte County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,695 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Butte County?
189 installer names have at least one install interconnected in Butte County in the last 24 months, and 736 appear in the full record.
How common are batteries with new solar in Butte County?
11.4% of the solar installs interconnected in Butte County include battery storage across all years, and 55.0% in the last 24 months (1,483 of 2,695).
How many solar installs in Butte County are under NEM 3.0?
2,742 of the 22,000 residential solar installs in Butte County (12.5% of the 21,999 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.