Solar installers in Contra Costa County, California

Who installs the most solar in Contra Costa County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Contra Costa County are Sunrun (2,659), BRIGHT OPS (1,090) and Tesla Energy Operations (formerly SolarCity) (1,039). They account for 4,788 of the 12,099 residential solar installs interconnected there in that window.

In all, 91,776 homes in Contra Costa County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 413 installers with installs in this window. 245 installs in the window were self-installed or had no installer recorded.

1Sunrun2,65910,634
2BRIGHT OPS1,0901,238
3Tesla Energy Operations (formerly SolarCity)1,03913,909
4Citadel Roofing and Solar1,0252,689
5FREEDOM FOREVER LLC3881,892
6GOT WATTS ELECTRIC, SOLAR & HVAC344762
7SunPower2085,670
8V3 Electric205747
9Semper Solaris Construction Inc1831,168
10AMBROSE SOLAR159649
11YOUR ENERGY SOLUTIONS147875
12GRID Alternatives1411,091
13AXIA SOLAR CORP134143
14Empower Electric Solar131751
15Complete Solar126516
16Solar Optimum Inc.116538
17Solar Technologies110770
18BETTER EARTH ELECTRIC INC109949
19NRG Clean Power105494
20West Coast Solar1042,632
21UNITED SOLAR ELECTRIC100330
22Diablo Solar Services901,316
23NORTH VALLEY LLC86146
24ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING79555
25FREEDOM FOREVER NORTHERN CALIFORNIA LLC7878

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)13,90913,909
2Sunrun10,63410,634
3SunPower5,6705,670
4Vivint Solar Developer, LLC3,9643,964
5Citadel Roofing and Solar2,6892,689
6West Coast Solar2,6322,632
7FREEDOM FOREVER LLC1,8921,892
8Bright Planet Solar1,7031,703
9PetersenDean1,5821,582
10Diablo Solar Services1,3161,316

Installs by year

YearInstalls interconnectedWith battery storage
202211,4781,911
202310,5411,906
20246,0733,796
20256,4275,161
2026 (through Aug 31, 2026)3,6172,848

Under the Net Billing Tariff (NEM 3.0)

12,969 of the 91,776 residential solar installs in Contra Costa County (14.1% of the 91,775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Contra Costa County

1Sunrun3,3503,32699.3%
2Tesla Energy Operations (formerly SolarCity)1,2851,20693.9%
3BRIGHT OPS1,2341,20697.7%
4FREEDOM FOREVER LLC50948895.9%
5GOT WATTS ELECTRIC, SOLAR & HVAC34833295.4%
6V3 Electric26025096.2%
7Empower Electric Solar25619475.8%
8Citadel Roofing and Solar2208337.7%
9Semper Solaris Construction Inc20715273.4%
10SunPower18415182.1%
11AMBROSE SOLAR18017496.7%
12GRID Alternatives1774726.6%
13BETTER EARTH ELECTRIC INC17016597.1%
14Solar Optimum Inc.14313594.4%
15AXIA SOLAR CORP14013697.1%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Contra Costa County

CityAll-time installs
Antioch11,460
Brentwood10,444
San Ramon7,893
Concord7,516
Oakley6,108
Danville5,838
Walnut Creek5,698
Pittsburg5,350
Richmond5,124
Martinez3,500
Lafayette2,651
Pleasant Hill2,621
Orinda1,898
Alamo1,793
Discovery Bay1,728
Hercules1,593
El Cerrito1,529
Clayton1,303
Moraga1,180
Pinole1,030

ZIP codes in Contra Costa County

ZIP codes with their own page where the utilities recorded Contra Costa County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

9451310,40010,400905
945316,4686,4681,029
945656,3046,304852
945616,1086,108746
945094,9964,996607
945834,0284,030589
945823,8763,971368
945533,6743,674473
945213,2013,201417
945263,1893,189410
945062,6402,640356
945492,6382,638385
945232,6212,621343
945052,4702,471331
945982,4022,402283
945631,8991,899221
945071,8021,802216
945181,8001,800220
948061,6711,671358
948031,6481,648253
945471,5941,594241
948041,5421,542307
945301,5311,531240
945191,4631,463214
945171,3031,303145
948011,1941,194161
945561,1821,182148
945961,1591,159135
945971,1451,145237
945201,0561,056141
945641,0301,030139
945951,0021,002116
94805719719107
9451144644667
9457243843872
9451426026117
947071801,360165
9452516616639
947081331,093148
9452811011019
9454876768
9561339753

Equipment recorded

In the last 24 months, 11,276 of Contra Costa County’s 12,099 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3,420, 30.3%) used modules recorded as Qcells.

In the last 24 months, 12,099 of Contra Costa County’s 12,099 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6,180, 51.1%) used inverters recorded as Tesla.

In the last 24 months, 7,779 of Contra Costa County’s 12,099 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4,630, 59.5%) used batteries recorded as Tesla.

15,507 of 18,482 battery-paired PG&E and SCE installs (83.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3,42015,815
JA Solar2,7155,007
REC1,2748,884
LONGi8135,562
Hyundai540not in top list
Inverter makerTesla6,18012,150
Enphase4,45030,964
SolarEdge2,32629,371
SunPower3018,176
FranklinWH287not in top list
Battery makerTesla4,6308,883
Enphase1,3352,348
SolarEdge1,1871,583
FranklinWH277372
Lunar Energy154154

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85,372 of 91,776 installs, inverters on 91,770. See the methodology and the equipment index.

SGIP battery storage projects in Contra Costa County

The SGIP public project report downloaded Nov 16, 2026 lists 2,511 battery storage projects in Contra Costa County with the status Paid, carrying $19,017,393 in current incentive allocations and 49,325 kWh of storage. Across every status it lists 3,962 storage projects there, 949 of them cancelled and 502 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,51149,325$19,017,393
PBI in Process1825,790$8,002,163
Reserved27215,279$9,912,015
Pending Reservation431,326$2,278,378
Cancelled94951,594$29,160,333
RRF Rejected1692,516$435,842

Installers named on the most SGIP storage projects in Contra Costa County

InstallerProjectsPaid
Semper Solaris Construction Inc725489
Sunrun305190
SunPower251159
Hooked On Solar215173
Tesla191165
SOLAR 4 AMERICA15399
Tesla Energy Operations (formerly SolarCity)150132
SWELL SERVICES INC DBA SWELL CONTRACTORS149112
HAVEN ENERGY SERVICES INC14745
Infinity Energy, Inc13492

215 of the 3,962 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Contra Costa County (EIA)

EIA’s 2025 Service Territory file lists 2 utilities serving Contra Costa County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Contra Costa County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Contra Costa County

49 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Contra Costa County as the county: 33 with the business type Corporation, Limited Liability, Partnership or JointVenture and 16 Sole Owner. 19 C-10 Electrical licenses in Contra Costa County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Contra Costa County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
91,776
Last 24 months
12,099
Capacity
595.3 MW DC
Median system size
5.7 kW DC
With battery storage
20.1% all time; 79.0% last 24 months
Third-party owned
23.1% where reported
Ownership types recorded
PPA 16,670, lease 3,510, prepaid lease 429, other 621
Median battery size
13.5 kWh
Earliest install in data
May 16, 1997

Common questions

How many homes in Contra Costa County have solar?

91,776 residential solar systems in Contra Costa County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 12,099 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Contra Costa County?

413 installer names have at least one install interconnected in Contra Costa County in the last 24 months, and 1,804 appear in the full record.

How common are batteries with new solar in Contra Costa County?

20.1% of the solar installs interconnected in Contra Costa County include battery storage across all years, and 79.0% in the last 24 months (9,554 of 12,099).

How many solar installs in Contra Costa County are under NEM 3.0?

12,969 of the 91,776 residential solar installs in Contra Costa County (14.1% of the 91,775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.