Solar installers in La Mesa, California
Most installs here are in San Diego County.
Who installs the most solar in La Mesa?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in La Mesa are Sunrun (156), Baker Electric, Inc. (48) and Semper Solaris Construction Inc (34). They account for 238 of the 631 residential solar installs interconnected there in that window.
In all, 7,315 homes in La Mesa have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 126 installers with installs in this window. 28 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 156 | 650 |
| 2 | Baker Electric, Inc. | 48 | 418 |
| 3 | Semper Solaris Construction Inc | 34 | 425 |
| 4 | Jamar Power System | 27 | 72 |
| 5 | Stellar Solar | 26 | 217 |
| 6 | Aloha Solar Power | 25 | 44 |
| 7 | Bright Planet Solar | 18 | 187 |
| 8 | Freedom Solar Co | 18 | 91 |
| 9 | Tesla Energy Operations (formerly SolarCity) | 18 | 484 |
| 10 | Solartech | 15 | 203 |
| 11 | Hooked On Solar | 8 | 8 |
| 12 | West Coast Solar | 8 | 46 |
| 13 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 7 | 8 |
| 14 | Solar Universe San Marcos | 7 | 65 |
| 15 | EXO Energy | 6 | 22 |
| 16 | G C Electric-Solar | 5 | 37 |
| 17 | Powur PBC (Powur Home) | 5 | 27 |
| 18 | Solar Renewable Energy | 5 | 12 |
| 19 | Sunline Energy Inc. | 5 | 139 |
| 20 | youpower Construction LLC | 5 | 5 |
| 21 | Alltech Solar | 4 | 28 |
| 22 | GAF Energy | 4 | 7 |
| 23 | Incentive Electric | 4 | 10 |
| 24 | San Diego County Solar | 4 | 14 |
| 25 | ADVANCED SOLAR | 3 | 14 |
Most installs, all time
| 1 | Sunrun | 650 | 650 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 484 | 484 |
| 3 | Semper Solaris Construction Inc | 425 | 425 |
| 4 | Baker Electric, Inc. | 418 | 418 |
| 5 | Vivint Solar Developer, LLC | 281 | 281 |
| 6 | Sullivan Solar Power | 234 | 234 |
| 7 | Stellar Solar | 217 | 217 |
| 8 | Solartech | 203 | 203 |
| 9 | Bright Planet Solar | 187 | 187 |
| 10 | Sunline Energy Inc. | 139 | 139 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 794 | 0 |
| 2023 | 981 | 0 |
| 2024 | 407 | 0 |
| 2025 | 345 | 0 |
| 2026 (through Aug 31, 2026) | 148 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
761 of the 7,315 residential solar installs in La Mesa (10.4% of the 7,315 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in La Mesa
| 1 | Sunrun | 201 | 0 | not recorded |
| 2 | Baker Electric, Inc. | 48 | 0 | not recorded |
| 3 | Semper Solaris Construction Inc | 47 | 0 | not recorded |
| 4 | CalState Solar | 38 | 0 | not recorded |
| 5 | Bright Planet Solar | 35 | 0 | not recorded |
| 6 | Stellar Solar | 29 | 0 | not recorded |
| 7 | Aloha Solar Power | 26 | 0 | not recorded |
| 8 | Tesla Energy Operations (formerly SolarCity) | 26 | 0 | not recorded |
| 9 | Freedom Solar Co | 23 | 0 | not recorded |
| 10 | Solartech | 16 | 0 | not recorded |
| 11 | Jamar Power System | 12 | 0 | not recorded |
| 12 | SunPower | 11 | 0 | not recorded |
| 13 | West Coast Solar | 11 | 0 | not recorded |
| 14 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 8 | 0 | not recorded |
| 15 | Solar Renewable Energy | 7 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 533 of La Mesa’s 631 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (145, 27.2%) used modules recorded as Qcells.
In the last 24 months, 631 of La Mesa’s 631 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (331, 52.5%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 145 | 1,093 |
| Silfab | 77 | 344 | |
| Canadian Solar | 61 | 313 | |
| LONGi | 43 | 242 | |
| HDHYUNDAIENERGYSOLUTIONSCO.,LTD. | 38 | not in top list | |
| Inverter maker | Tesla | 331 | 441 |
| Enphase | 207 | 2,918 | |
| SolarEdge | 91 | 2,278 | |
| Delta Electronics | 13 | 107 | |
| SMA | 9 | 492 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,587 of 7,315 installs, inverters on 7,067. See the methodology and the equipment index.
ZIP codes in La Mesa
ZIP codes with their own page where the utilities recorded La Mesa on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in La Mesa
The SGIP report lists 194 battery storage projects with the city La Mesa, 120 with the status Paid ($446,990 in current incentive allocations, 1,765 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 120 | 1,765 | $446,990 |
| Reserved | 12 | 224 | $301,782 |
| Waitlist | 1 | 15 | $16,765 |
| Cancelled | 57 | 1,096 | $352,998 |
| RRF Rejected | 4 | 55 | $8,410 |
Installers named on the most SGIP storage projects in La Mesa
43 of the 194 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 7,315
- Last 24 months
- 631
- Capacity
- 45.4 MW DC
- Median system size
- 5.5 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 23.3% where reported
- Ownership types recorded
- PPA 1,210, lease 189, prepaid lease 15, other 53
- Earliest install in data
- Jan 29, 2001
Common questions
How many homes in La Mesa have solar?
7,315 residential solar systems in La Mesa were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 631 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in La Mesa?
126 installer names have at least one install interconnected in La Mesa in the last 24 months, and 554 appear in the full record.
How common are batteries with new solar in La Mesa?
Battery storage is not recorded on the solar installs interconnected in La Mesa: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in La Mesa are under NEM 3.0?
761 of the 7,315 residential solar installs in La Mesa (10.4% of the 7,315 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.