Solar installers in Carlsbad, California
Most installs here are in San Diego County.
Who installs the most solar in Carlsbad?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Carlsbad are Sunrun (171), Asgard Electric (110) and Baker Electric, Inc. (66). They account for 347 of the 910 residential solar installs interconnected there in that window.
In all, 11,720 homes in Carlsbad have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 133 installers with installs in this window. 26 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 171 | 1,068 |
| 2 | Asgard Electric | 110 | 124 |
| 3 | Baker Electric, Inc. | 66 | 1,304 |
| 4 | Stellar Solar | 57 | 729 |
| 5 | Aloha Solar Power | 46 | 106 |
| 6 | Swell Energy | 41 | 76 |
| 7 | Tesla Energy Operations (formerly SolarCity) | 37 | 916 |
| 8 | SOLARA HOME ENERGY LLC | 23 | 24 |
| 9 | Sunline Energy Inc. | 19 | 206 |
| 10 | Semper Solaris Construction Inc | 17 | 464 |
| 11 | Freedom Solar Co | 15 | 118 |
| 12 | Solartech | 13 | 201 |
| 13 | Bright Planet Solar | 12 | 104 |
| 14 | San Diego County Solar | 11 | 106 |
| 15 | Solar Universe San Marcos | 10 | 68 |
| 16 | Cosmic Solar, Inc. | 8 | 81 |
| 17 | Powur PBC (Powur Home) | 8 | 75 |
| 18 | G C Electric-Solar | 7 | 70 |
| 19 | home unplugged | 7 | 236 |
| 20 | West Coast Solar | 7 | 78 |
| 21 | PALOMAR SOLAR LTD | 6 | 79 |
| 22 | Solar Optimum Inc. | 6 | 62 |
| 23 | Eriksson | 5 | 97 |
| 24 | AXIA SOLAR CORP | 4 | 4 |
| 25 | Bitterend Ventures Inc DBA BVI SOLAR | 4 | 13 |
Most installs, all time
| 1 | Baker Electric, Inc. | 1,304 | 1,304 |
| 2 | Sunrun | 1,068 | 1,068 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 916 | 916 |
| 4 | Stellar Solar | 729 | 729 |
| 5 | Semper Solaris Construction Inc | 464 | 464 |
| 6 | SunPower | 420 | 420 |
| 7 | Sullivan Solar Power | 364 | 364 |
| 8 | home unplugged | 236 | 236 |
| 9 | Sunline Energy Inc. | 206 | 206 |
| 10 | Vivint Solar Developer, LLC | 204 | 204 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,317 | 0 |
| 2023 | 1,609 | 0 |
| 2024 | 480 | 0 |
| 2025 | 486 | 0 |
| 2026 (through Aug 31, 2026) | 283 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
1,110 of the 11,720 residential solar installs in Carlsbad (9.5% of the 11,720 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Carlsbad
| 1 | Sunrun | 259 | 0 | not recorded |
| 2 | Asgard Electric | 110 | 0 | not recorded |
| 3 | Baker Electric, Inc. | 77 | 0 | not recorded |
| 4 | Swell Energy | 76 | 0 | not recorded |
| 5 | Tesla Energy Operations (formerly SolarCity) | 61 | 0 | not recorded |
| 6 | Aloha Solar Power | 57 | 0 | not recorded |
| 7 | Stellar Solar | 55 | 0 | not recorded |
| 8 | Semper Solaris Construction Inc | 26 | 0 | not recorded |
| 9 | SOLARA HOME ENERGY LLC | 24 | 0 | not recorded |
| 10 | Freedom Solar Co | 23 | 0 | not recorded |
| 11 | Bright Planet Solar | 15 | 0 | not recorded |
| 12 | Sunline Energy Inc. | 14 | 0 | not recorded |
| 13 | Cosmic Solar, Inc. | 13 | 0 | not recorded |
| 14 | Solartech | 12 | 0 | not recorded |
| 15 | Kota Construction LLC | 11 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 822 of Carlsbad’s 910 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (328, 39.9%) used modules recorded as Qcells.
In the last 24 months, 910 of Carlsbad’s 910 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (412, 45.3%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 328 | 1,912 |
| HDHYUNDAIENERGYSOLUTIONSCO.,LTD. | 86 | not in top list | |
| Silfab | 71 | 365 | |
| LONGi | 70 | not in top list | |
| Canadian Solar | 61 | 370 | |
| Inverter maker | Tesla | 412 | 691 |
| Enphase | 405 | 4,211 | |
| SolarEdge | 89 | 3,551 | |
| Delta Electronics | 9 | 208 | |
| PointGuardEnergyInc. | 6 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 10,948 of 11,720 installs, inverters on 11,433. See the methodology and the equipment index.
ZIP codes in Carlsbad
ZIP codes with their own page where the utilities recorded Carlsbad on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Carlsbad
The SGIP report lists 470 battery storage projects with the city Carlsbad, 329 with the status Paid ($4,185,885 in current incentive allocations, 8,896 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 329 | 8,896 | $4,185,885 |
| PBI in Process | 11 | 8,162 | $3,717,236 |
| Reserved | 9 | 136 | $197,180 |
| Pending Reservation | 3 | 1,064 | $892,526 |
| Waitlist | 1 | 13 | $34,624 |
| Cancelled | 110 | 11,013 | $5,547,487 |
| RRF Rejected | 7 | 88 | $14,475 |
Installers named on the most SGIP storage projects in Carlsbad
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 76 | 49 |
| Sullivan Solar Power | 45 | 43 |
| Sunrun | 40 | 31 |
| Solare Energy, Inc | 23 | 20 |
| Home Energy Systems, Inc. | 16 | 14 |
| Tesla Energy Operations (formerly SolarCity) | 15 | 15 |
| Sunline Energy Inc. | 14 | 9 |
| HAVEN ENERGY SERVICES INC | 13 | 7 |
| Tesla | 13 | 12 |
| SunPower | 10 | 5 |
132 of the 470 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Carlsbad is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 11,720
- Last 24 months
- 910
- Capacity
- 75.2 MW DC
- Median system size
- 5.7 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 15.7% where reported
- Ownership types recorded
- PPA 1,206, lease 303, prepaid lease 17, other 62
- Earliest install in data
- Jul 12, 2000
Common questions
How many homes in Carlsbad have solar?
11,720 residential solar systems in Carlsbad were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 910 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Carlsbad?
133 installer names have at least one install interconnected in Carlsbad in the last 24 months, and 600 appear in the full record.
How common are batteries with new solar in Carlsbad?
Battery storage is not recorded on the solar installs interconnected in Carlsbad: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in Carlsbad are under NEM 3.0?
1,110 of the 11,720 residential solar installs in Carlsbad (9.5% of the 11,720 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.