Solar installers in Santa Clara County, California

Who installs the most solar in Santa Clara County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Santa Clara County are Sunrun (2,535), Tesla Energy Operations (formerly SolarCity) (1,798) and BRIGHT OPS (616). They account for 4,949 of the 12,427 residential solar installs interconnected there in that window.

In all, 89,753 homes in Santa Clara County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 430 installers with installs in this window. 400 installs in the window were self-installed or had no installer recorded.

1Sunrun2,53510,047
2Tesla Energy Operations (formerly SolarCity)1,79816,117
3BRIGHT OPS616694
4CINNAMON ENERGY SYSTEMS INC4891,386
5Citadel Roofing and Solar3831,102
6INFINIUM SOLAR, INC.3651,033
7Complete Solar286687
8NRG Clean Power2511,047
9FREEDOM FOREVER LLC248966
10Semper Solaris Construction Inc2391,297
11Cobalt Power Systems, Inc.2271,828
12Solar Optimum Inc.2031,050
13Clean Solar1921,753
14YOUR ENERGY SOLUTIONS161696
15SunPower1595,571
16Infinity Energy, Inc131689
17AXIA SOLAR CORP113121
18Nexus Energy Systems112689
19ROCKIN ROOFERS110462
20NABU ENERGY LLC104331
21American Array Solar93489
22Solar Technologies87829
23SUNVAULT87247
24AMECO SOLAR LLC80135
25POWER UP SOLUTIONS LLC8081

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)16,11716,117
2Sunrun10,04710,047
3SunPower5,5715,571
4Vivint Solar Developer, LLC3,2353,235
5PetersenDean2,4442,444
6Cobalt Power Systems, Inc.1,8281,828
7Clean Solar1,7531,753
8CINNAMON ENERGY SYSTEMS INC1,3861,386
9Semper Solaris Construction Inc1,2971,297
10Bright Planet Solar1,2221,222

Installs by year

YearInstalls interconnectedWith battery storage
20229,5492,322
202311,8362,342
20246,2544,024
20256,4785,006
2026 (through Aug 31, 2026)4,0203,139

Under the Net Billing Tariff (NEM 3.0)

12,747 of the 89,753 residential solar installs in Santa Clara County (14.2% of the 89,752 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Santa Clara County

1Sunrun2,7882,70597.0%
2Tesla Energy Operations (formerly SolarCity)2,2652,15495.1%
3BRIGHT OPS68867197.5%
4CINNAMON ENERGY SYSTEMS INC52450496.2%
5INFINIUM SOLAR, INC.37633388.6%
6FREEDOM FOREVER LLC32631195.4%
7Solar Optimum Inc.28726592.3%
8NRG Clean Power27524990.5%
9Cobalt Power Systems, Inc.23822293.3%
10SunPower23218378.9%
11Semper Solaris Construction Inc21817781.2%
12Clean Solar18017195.0%
13YOUR ENERGY SOLUTIONS16414689.0%
14ROCKIN ROOFERS11510389.6%
15American Array Solar1129383.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Santa Clara County

CityAll-time installs
San Jose48,554
Gilroy5,816
Sunnyvale5,378
Morgan Hill5,264
Los Altos3,611
Cupertino3,463
Saratoga3,395
Milpitas3,273
Los Gatos3,223
Mountain View2,777
Campbell2,438
Los Altos Hills1,036
San Martin486
East Palo Alto336
Monte Sereno253
Stanford218
Alviso51
Palo Alto16
Redwood Estates10
Hollister6

ZIP codes in Santa Clara County

ZIP codes with their own page where the utilities recorded Santa Clara County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

950205,8145,814792
950375,2635,263780
951244,1624,162562
951204,0064,006490
951233,9673,967401
951253,5293,529535
950143,4643,464677
950703,3963,396509
950353,2723,272464
940873,2113,211546
951482,9872,988300
951272,8442,844352
940242,6182,618388
950082,4372,437373
951182,2372,237224
951322,2212,221262
940222,0292,029291
950322,0262,026290
951362,0132,013221
951211,9321,932184
951291,8851,885240
951351,8831,883191
951111,7151,715177
951381,6391,639146
951221,6131,613202
940401,4151,416230
951281,2981,298194
940861,2381,238189
950301,1441,146195
951171,1191,119314
951191,1031,103144
951121,0271,027145
95133944944133
95131903903100
95116900900133
94043880880124
95130848848120
95126759759115
9513954554560
9408550750762
9504648848858
9404147047081
94089410410146
9511036736752
94303343695109
9503331467483
9430522322328
9500265656
9514039395
9513428283

Equipment recorded

In the last 24 months, 11,663 of Santa Clara County’s 12,427 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4,212, 36.1%) used modules recorded as Qcells.

In the last 24 months, 12,427 of Santa Clara County’s 12,427 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6,711, 54.0%) used inverters recorded as Tesla.

In the last 24 months, 7,888 of Santa Clara County’s 12,427 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5,060, 64.1%) used batteries recorded as Tesla.

16,648 of 19,817 battery-paired PG&E and SCE installs (84.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4,21214,845
REC2,1279,906
JA Solar1,5743,601
Hyundai639not in top list
LONGi5103,346
Inverter makerTesla6,71114,605
Enphase4,65429,993
SolarEdge1,63223,247
FranklinWH607not in top list
SunPower2388,800
Battery makerTesla5,06010,544
Enphase1,1742,005
SolarEdge720924
FranklinWH595821
Lunar Energy190190

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 83,598 of 89,753 installs, inverters on 89,748. See the methodology and the equipment index.

SGIP battery storage projects in Santa Clara County

The SGIP public project report downloaded Nov 16, 2026 lists 2,492 battery storage projects in Santa Clara County with the status Paid, carrying $25,545,548 in current incentive allocations and 64,536 kWh of storage. Across every status it lists 4,082 storage projects there, 1,054 of them cancelled and 536 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,49264,536$25,545,548
PBI in Process2618,244$6,018,225
Reserved24727,810$10,441,974
Pending Reservation50975$1,631,443
Waitlist228$54,757
Cancelled1,054138,518$60,870,364
RRF Rejected2114,320$1,011,817

Installers named on the most SGIP storage projects in Santa Clara County

InstallerProjectsPaid
Semper Solaris Construction Inc742457
Sunrun342222
SunPower290183
Tesla247220
SWELL SERVICES INC DBA SWELL CONTRACTORS217160
Tesla Energy Operations (formerly SolarCity)216194
Cobalt Power Systems, Inc.204172
HAVEN ENERGY SERVICES INC18329
Infinity Energy, Inc17896
Clean Solar155122

240 of the 4,082 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Santa Clara County (EIA)

EIA’s 2025 Service Territory file lists 4 utilities serving Santa Clara County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
City of Palo Alto - (CA)Municipal1,8911,76321.6AC229
City of Santa Clara - (CA)Municipal1,3471,23324.527AC0

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Santa Clara County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Santa Clara County

51 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Santa Clara County as the county: 38 with the business type Corporation, Limited Liability, Partnership or JointVenture and 13 Sole Owner. 27 C-10 Electrical licenses in Santa Clara County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Santa Clara County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

Solar permit data in Santa Clara County

One permit dataset in Santa Clara County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Area coveredAgencySolar permits, 2025Battery permits, 2025Full table
City of CampbellCity of Campbell29573Below

Solar permits issued in the City of Campbell

From The City of Campbell’s open data: CampbellPermits_ActiveBuilding and CampbellPermits_Inactive Building, City of Campbell ArcGIS layers. Counted by calendar year of the IssuedDate field. Solar: WorkType 'Residential - Photovoltaic' or 'Residential - Photovoltaic (Automated)', or 'Residential - PV/Carport' with a ProjectDescription that mentions solar, photovoltaic, PV, modules or panels; the active and inactive layers are combined and a PermitID in both counts once. Battery: those solar permits whose ProjectDescription mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 13, 2026. Checked Nov 16, 2026.

YearSolar permitsBattery permits
202012537
202124659
202231245
202331542
202421490
202529573
2026 (through Nov 16, 2026)22421

By month, December 2024 to November 2026

Month issuedSolar permitsWith a battery
December 2024176
January 2025195
February 2025145
March 2025178
April 2025285
May 2025154
June 2025256
July 2025366
August 2025259
September 2025408
October 20253211
November 2025274
December 2025172
January 2026202
February 2026151
March 2026273
April 2026291
May 2026193
June 2026301
July 2026293
August 2026242
September 2026202
October 202671
November 2026 (through Nov 16, 2026)42

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. The city publishes building permits in two layers, active and inactive (finaled, closed or expired). Its permit system’s issue dates start in late 2019, so years before 2020 are not shown. The layers name no contractor or license number, so permits are not linked to installers.

At a glance

Residential solar installs
89,753
Last 24 months
12,427
Capacity
558.8 MW DC
Median system size
5.6 kW DC
With battery storage
22.1% all time; 77.4% last 24 months
Third-party owned
18.6% where reported
Ownership types recorded
PPA 14,124, lease 2,202, prepaid lease 144, other 188
Median battery size
13.5 kWh
Earliest install in data
Jul 13, 1999

Common questions

How many homes in Santa Clara County have solar?

89,753 residential solar systems in Santa Clara County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 12,427 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Santa Clara County?

430 installer names have at least one install interconnected in Santa Clara County in the last 24 months, and 1,801 appear in the full record.

How common are batteries with new solar in Santa Clara County?

22.1% of the solar installs interconnected in Santa Clara County include battery storage across all years, and 77.4% in the last 24 months (9,622 of 12,427).

How many solar installs in Santa Clara County are under NEM 3.0?

12,747 of the 89,753 residential solar installs in Santa Clara County (14.2% of the 89,752 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.