Solar installers in Chula Vista, California

Most installs here are in San Diego County.

Who installs the most solar in Chula Vista?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Chula Vista are Sunrun (683), Lennar (309) and GAF Energy (159). They account for 1,151 of the 2,342 residential solar installs interconnected there in that window.

In all, 22,628 homes in Chula Vista have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 148 installers with installs in this window. 40 installs in the window were self-installed or had no installer recorded.

1Sunrun6833,736
2Lennar309994
3GAF Energy159159
4SunPower155993
5Bright Planet Solar121995
6Semper Solaris Construction Inc871,409
7Tesla Energy Operations (formerly SolarCity)832,545
8Freedom Solar Co77476
9SOLARA HOME ENERGY LLC4848
10Baker Electric, Inc.45637
11Solartech36464
12BETTER EARTH ELECTRIC INC2390
13Stellar Solar22329
14Sunline Energy Inc.22274
15LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC2150
16EXO Energy2097
17California Premier Solar1927
18Empower Electric Solar1720
19Jamar Power System1735
20Solar Universe San Marcos17199
21Aloha Solar Power1447
22West Coast Solar13171
23ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING10186
24Sunlight Solar Inc10115
25Cyberdyne construction946

Most installs, all time

1Sunrun3,7363,736
2Tesla Energy Operations (formerly SolarCity)2,5452,545
3Semper Solaris Construction Inc1,4091,409
4Vivint Solar Developer, LLC1,1421,142
5Bright Planet Solar995995
6Lennar994994
7SunPower993993
8Baker Electric, Inc.637637
9Freedom Solar Co476476
10Solartech464464

Installs by year

YearInstalls interconnectedWith battery storage
20222,7530
20233,4670
20241,5960
20251,1600
2026 (through Aug 31, 2026)6430

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

3,087 of the 22,628 residential solar installs in Chula Vista (13.6% of the 22,628 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Chula Vista

1Sunrun1,0890not recorded
2Lennar3160not recorded
3Bright Planet Solar2320not recorded
4GAF Energy1590not recorded
5Tesla Energy Operations (formerly SolarCity)1390not recorded
6Semper Solaris Construction Inc1230not recorded
7SunPower1180not recorded
8Freedom Solar Co940not recorded
9Baker Electric, Inc.480not recorded
10SOLARA HOME ENERGY LLC480not recorded
11Solartech480not recorded
12LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC410not recorded
13BETTER EARTH ELECTRIC INC290not recorded
14ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING270not recorded
15EXO Energy230not recorded

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 2,081 of Chula Vista’s 2,342 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,019, 49.0%) used modules recorded as Qcells.

In the last 24 months, 2,342 of Chula Vista’s 2,342 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,037, 44.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,0194,766
LONGi2831,349
Silfab2011,221
Canadian Solar133904
JA Solar109not in top list
Inverter makerEnphase1,0377,604
Tesla9691,368
SolarEdge3858,363
Delta Electronics39526
SunPower211,472

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20,950 of 22,628 installs, inverters on 22,119. See the methodology and the equipment index.

ZIP codes in Chula Vista

ZIP codes with their own page where the utilities recorded Chula Vista on at least 10% of the ZIP’s installs, through Aug 31, 2026.

919137,0087,008782
919114,9344,934672
919104,8534,853476
919153,3623,362259
919142,4712,471153

SGIP battery storage projects in Chula Vista

The SGIP report lists 589 battery storage projects with the city Chula Vista, 331 with the status Paid ($2,275,561 in current incentive allocations, 5,758 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid3315,758$2,275,561
PBI in Process76,316$2,823,772
Reserved45678$931,241
Pending Reservation352$39,581
Waitlist9190$266,404
Cancelled18710,861$7,264,088
RRF Rejected794$27,220

Installers named on the most SGIP storage projects in Chula Vista

InstallerProjectsPaid
Semper Solaris Construction Inc15794
Sunrun10566
Infinity Energy, Inc2412
Sullivan Solar Power2322
SunPower237
Tesla Energy Operations (formerly SolarCity)1413
Solar Symphony Construction Inc.133
Home Energy Systems, Inc.128
Tesla1211
Vivint Solar Developer, LLC91

101 of the 589 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Chula Vista is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
22,628
Last 24 months
2,342
Capacity
120.2 MW DC
Median system size
4.7 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
36.9% where reported
Ownership types recorded
PPA 6,214, lease 1,070, prepaid lease 31, other 216
Earliest install in data
Sep 6, 2001

Common questions

How many homes in Chula Vista have solar?

22,628 residential solar systems in Chula Vista were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,342 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Chula Vista?

148 installer names have at least one install interconnected in Chula Vista in the last 24 months, and 644 appear in the full record.

How common are batteries with new solar in Chula Vista?

Battery storage is not recorded on the solar installs interconnected in Chula Vista: SDG&E files a battery as its own project record, not on the solar record.

How many solar installs in Chula Vista are under NEM 3.0?

3,087 of the 22,628 residential solar installs in Chula Vista (13.6% of the 22,628 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.