Solar installers in Chula Vista, California
Most installs here are in San Diego County.
Who installs the most solar in Chula Vista?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Chula Vista are Sunrun (683), Lennar (309) and GAF Energy (159). They account for 1,151 of the 2,342 residential solar installs interconnected there in that window.
In all, 22,628 homes in Chula Vista have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 148 installers with installs in this window. 40 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 683 | 3,736 |
| 2 | Lennar | 309 | 994 |
| 3 | GAF Energy | 159 | 159 |
| 4 | SunPower | 155 | 993 |
| 5 | Bright Planet Solar | 121 | 995 |
| 6 | Semper Solaris Construction Inc | 87 | 1,409 |
| 7 | Tesla Energy Operations (formerly SolarCity) | 83 | 2,545 |
| 8 | Freedom Solar Co | 77 | 476 |
| 9 | SOLARA HOME ENERGY LLC | 48 | 48 |
| 10 | Baker Electric, Inc. | 45 | 637 |
| 11 | Solartech | 36 | 464 |
| 12 | BETTER EARTH ELECTRIC INC | 23 | 90 |
| 13 | Stellar Solar | 22 | 329 |
| 14 | Sunline Energy Inc. | 22 | 274 |
| 15 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 21 | 50 |
| 16 | EXO Energy | 20 | 97 |
| 17 | California Premier Solar | 19 | 27 |
| 18 | Empower Electric Solar | 17 | 20 |
| 19 | Jamar Power System | 17 | 35 |
| 20 | Solar Universe San Marcos | 17 | 199 |
| 21 | Aloha Solar Power | 14 | 47 |
| 22 | West Coast Solar | 13 | 171 |
| 23 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 10 | 186 |
| 24 | Sunlight Solar Inc | 10 | 115 |
| 25 | Cyberdyne construction | 9 | 46 |
Most installs, all time
| 1 | Sunrun | 3,736 | 3,736 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 2,545 | 2,545 |
| 3 | Semper Solaris Construction Inc | 1,409 | 1,409 |
| 4 | Vivint Solar Developer, LLC | 1,142 | 1,142 |
| 5 | Bright Planet Solar | 995 | 995 |
| 6 | Lennar | 994 | 994 |
| 7 | SunPower | 993 | 993 |
| 8 | Baker Electric, Inc. | 637 | 637 |
| 9 | Freedom Solar Co | 476 | 476 |
| 10 | Solartech | 464 | 464 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,753 | 0 |
| 2023 | 3,467 | 0 |
| 2024 | 1,596 | 0 |
| 2025 | 1,160 | 0 |
| 2026 (through Aug 31, 2026) | 643 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
3,087 of the 22,628 residential solar installs in Chula Vista (13.6% of the 22,628 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Chula Vista
| 1 | Sunrun | 1,089 | 0 | not recorded |
| 2 | Lennar | 316 | 0 | not recorded |
| 3 | Bright Planet Solar | 232 | 0 | not recorded |
| 4 | GAF Energy | 159 | 0 | not recorded |
| 5 | Tesla Energy Operations (formerly SolarCity) | 139 | 0 | not recorded |
| 6 | Semper Solaris Construction Inc | 123 | 0 | not recorded |
| 7 | SunPower | 118 | 0 | not recorded |
| 8 | Freedom Solar Co | 94 | 0 | not recorded |
| 9 | Baker Electric, Inc. | 48 | 0 | not recorded |
| 10 | SOLARA HOME ENERGY LLC | 48 | 0 | not recorded |
| 11 | Solartech | 48 | 0 | not recorded |
| 12 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 41 | 0 | not recorded |
| 13 | BETTER EARTH ELECTRIC INC | 29 | 0 | not recorded |
| 14 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 27 | 0 | not recorded |
| 15 | EXO Energy | 23 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 2,081 of Chula Vista’s 2,342 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,019, 49.0%) used modules recorded as Qcells.
In the last 24 months, 2,342 of Chula Vista’s 2,342 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,037, 44.3%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,019 | 4,766 |
| LONGi | 283 | 1,349 | |
| Silfab | 201 | 1,221 | |
| Canadian Solar | 133 | 904 | |
| JA Solar | 109 | not in top list | |
| Inverter maker | Enphase | 1,037 | 7,604 |
| Tesla | 969 | 1,368 | |
| SolarEdge | 385 | 8,363 | |
| Delta Electronics | 39 | 526 | |
| SunPower | 21 | 1,472 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20,950 of 22,628 installs, inverters on 22,119. See the methodology and the equipment index.
ZIP codes in Chula Vista
ZIP codes with their own page where the utilities recorded Chula Vista on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Chula Vista
The SGIP report lists 589 battery storage projects with the city Chula Vista, 331 with the status Paid ($2,275,561 in current incentive allocations, 5,758 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 331 | 5,758 | $2,275,561 |
| PBI in Process | 7 | 6,316 | $2,823,772 |
| Reserved | 45 | 678 | $931,241 |
| Pending Reservation | 3 | 52 | $39,581 |
| Waitlist | 9 | 190 | $266,404 |
| Cancelled | 187 | 10,861 | $7,264,088 |
| RRF Rejected | 7 | 94 | $27,220 |
Installers named on the most SGIP storage projects in Chula Vista
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 157 | 94 |
| Sunrun | 105 | 66 |
| Infinity Energy, Inc | 24 | 12 |
| Sullivan Solar Power | 23 | 22 |
| SunPower | 23 | 7 |
| Tesla Energy Operations (formerly SolarCity) | 14 | 13 |
| Solar Symphony Construction Inc. | 13 | 3 |
| Home Energy Systems, Inc. | 12 | 8 |
| Tesla | 12 | 11 |
| Vivint Solar Developer, LLC | 9 | 1 |
101 of the 589 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Chula Vista is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 22,628
- Last 24 months
- 2,342
- Capacity
- 120.2 MW DC
- Median system size
- 4.7 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 36.9% where reported
- Ownership types recorded
- PPA 6,214, lease 1,070, prepaid lease 31, other 216
- Earliest install in data
- Sep 6, 2001
Common questions
How many homes in Chula Vista have solar?
22,628 residential solar systems in Chula Vista were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,342 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Chula Vista?
148 installer names have at least one install interconnected in Chula Vista in the last 24 months, and 644 appear in the full record.
How common are batteries with new solar in Chula Vista?
Battery storage is not recorded on the solar installs interconnected in Chula Vista: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in Chula Vista are under NEM 3.0?
3,087 of the 22,628 residential solar installs in Chula Vista (13.6% of the 22,628 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.