Solar installers in Sutter County, California

Who installs the most solar in Sutter County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Sutter County are Sunrun (235), Citadel Roofing and Solar (139) and Westhaven Inc (97). They account for 471 of the 1,174 residential solar installs interconnected there in that window.

In all, 10,393 homes in Sutter County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 110 installers with installs in this window. 27 installs in the window were self-installed or had no installer recorded.

1Sunrun235763
2Citadel Roofing and Solar139307
3Westhaven Inc971,369
4FOCUS SOLAR ENERGY INC7377
5SonRay Construction Inc.5455
6HAMMOND JIM ELECTRIC INC44268
7BRIGHT OPS4354
8FREEDOM FOREVER LLC30194
9POWUR HOME CONSTRUCTION3065
10Tesla Energy Operations (formerly SolarCity)29917
11NORTH VALLEY LLC2468
12OHM SOLAR SOLUTIONS2460
13POWER UP SOLUTIONS LLC2026
14V3 Electric19424
15CONTINUUM1313
16SENGA ENERGY LLC1233
17BETTER EARTH ELECTRIC INC1033
18DYNAMIC ENERGY & ELECTRIC1025
19FIVE STAR SOLAR1038
20AXIA SOLAR CORP88
21Empower Electric Solar850
22FLAGSHIP SOLAR88
23SOLAR AND ROOF DIRECT88
24EXO Energy710
25SOLAR SAVINGS DIRECT INC717

Most installs, all time

1Westhaven Inc1,3691,369
2Tesla Energy Operations (formerly SolarCity)917917
3Sunrun763763
4Vivint Solar Developer, LLC526526
5V3 Electric424424
6Infinity Energy, Inc383383
7Citadel Roofing and Solar307307
8Bright Planet Solar287287
9HAMMOND JIM ELECTRIC INC268268
10Gold Rush Energy Solutions198198

Installs by year

YearInstalls interconnectedWith battery storage
20221,16757
20231,240122
2024626450
2025603432
2026 (through Aug 31, 2026)361255

Under the Net Billing Tariff (NEM 3.0)

1,324 of the 10,393 residential solar installs in Sutter County (12.7% of the 10,393 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Sutter County

1Sunrun314314100.0%
2Westhaven Inc14213796.5%
3FOCUS SOLAR ENERGY INC6161100.0%
4POWUR HOME CONSTRUCTION616098.4%
5Citadel Roofing and Solar6000.0%
6BRIGHT OPS544888.9%
7NORTH VALLEY LLC4646100.0%
8FREEDOM FOREVER LLC393589.7%
9Tesla Energy Operations (formerly SolarCity)383284.2%
10V3 Electric3636100.0%
11OHM SOLAR SOLUTIONS292689.7%
12HAMMOND JIM ELECTRIC INC282589.3%
13POWER UP SOLUTIONS LLC2424100.0%
14SENGA ENERGY LLC161487.5%
15Empower Electric Solar151386.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Sutter County

CityAll-time installs
Yuba City8,285
Live Oak1,326
Sutter481
Pleasant Grove79
Rio Oso65
Meridian50
Nicolaus44
Robbins23
East Nicolaus10
Elverta8
Knights Landing5
Wheatland4
Sacramento2

ZIP codes in Sutter County

ZIP codes with their own page where the utilities recorded Sutter County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

959934,8614,864622
959913,4243,424349
959531,3261,326118
9598248148142
9566879819
9567465666
9565954548
9595750502

Equipment recorded

In the last 24 months, 1,094 of Sutter County’s 1,174 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (331, 30.3%) used modules recorded as Qcells.

In the last 24 months, 1,174 of Sutter County’s 1,174 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (530, 45.1%) used inverters recorded as Enphase.

In the last 24 months, 682 of Sutter County’s 1,174 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (333, 48.8%) used batteries recorded as Tesla.

1,127 of 1,389 battery-paired PG&E and SCE installs (81.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3312,071
JA Solar195367
LONGi139814
Silfab113not in top list
Canadian Solar104769
Inverter makerEnphase5304,023
Tesla529766
SolarEdge1923,417
SMA23922
PointGuard Energy Inc.20not in top list
Battery makerTesla333485
Enphase211390
SolarEdge83130
PointGuard Energy Inc.1919
FranklinWH1216

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 9,395 of 10,393 installs, inverters on 10,392. See the methodology and the equipment index.

SGIP battery storage projects in Sutter County

The SGIP public project report downloaded Nov 16, 2026 lists 46 battery storage projects in Sutter County with the status Paid, carrying $1,053,414 in current incentive allocations and 2,509 kWh of storage. Across every status it lists 98 storage projects there, 22 of them cancelled and 30 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid462,509$1,053,414
Reserved164,641$1,063,183
Pending Reservation229$72,363
Cancelled22454$325,524
RRF Rejected12135$23,393

Installers named on the most SGIP storage projects in Sutter County

InstallerProjectsPaid
Hooked On Solar86
V3 Electric82
HAVEN ENERGY SERVICES INC72
Infinity Energy, Inc74
SOLAR SAVINGS DIRECT INC50
SunPower54
GRID Alternatives42
Sunrun44
Westhaven Solar42
Tesla33

10 of the 98 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Sutter County (EIA)

EIA’s 2025 Service Territory file lists 2 utilities serving Sutter County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in Sutter County

4 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Sutter County as the county: 3 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 6 C-10 Electrical licenses in Sutter County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Sutter County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
10,393
Last 24 months
1,174
Capacity
78.2 MW DC
Median system size
6.9 kW DC
With battery storage
13.4% all time; 72.3% last 24 months
Third-party owned
27.0% where reported
Ownership types recorded
PPA 2,319, lease 366, prepaid lease 10, other 112
Median battery size
13.5 kWh
Earliest install in data
Nov 14, 2001

Common questions

How many homes in Sutter County have solar?

10,393 residential solar systems in Sutter County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,174 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Sutter County?

110 installer names have at least one install interconnected in Sutter County in the last 24 months, and 513 appear in the full record.

How common are batteries with new solar in Sutter County?

13.4% of the solar installs interconnected in Sutter County include battery storage across all years, and 72.3% in the last 24 months (849 of 1,174).

How many solar installs in Sutter County are under NEM 3.0?

1,324 of the 10,393 residential solar installs in Sutter County (12.7% of the 10,393 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.