Solar installers in Vista, California

Most installs here are in San Diego County.

Who installs the most solar in Vista?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Vista are Sunrun (290), Aloha Solar Power (55) and Baker Electric, Inc. (53). They account for 398 of the 882 residential solar installs interconnected there in that window.

In all, 9,997 homes in Vista have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 135 installers with installs in this window. 58 installs in the window were self-installed or had no installer recorded.

1Sunrun2901,186
2Aloha Solar Power5587
3Baker Electric, Inc.53726
4Bright Planet Solar35295
5Freedom Solar Co30188
6Tesla Energy Operations (formerly SolarCity)25674
7Stellar Solar22267
8Semper Solaris Construction Inc20404
9SOLARA HOME ENERGY LLC1919
10Cosmic Solar, Inc.16101
11Jamar Power System1425
12New Era Electric1213
13Blalock electric1161
14Powur PBC (Powur Home)1064
15Solartech888
16Current Home723
17San Diego County Solar729
18Sunline Energy Inc.783
19ALIVE Industries, Inc.546
20BETTER EARTH ELECTRIC INC525
21Empower Electric Solar58
22G C Electric-Solar534
23Clayc Electric434
24Electric Dove44
25LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC410

Most installs, all time

1Sunrun1,1861,186
2Baker Electric, Inc.726726
3Tesla Energy Operations (formerly SolarCity)674674
4Vivint Solar Developer, LLC530530
5Semper Solaris Construction Inc404404
6Bright Planet Solar295295
7Stellar Solar267267
8SunPower251251
9Lennar211211
10Freedom Solar Co188188

Installs by year

YearInstalls interconnectedWith battery storage
20221,0060
20231,3900
20245920
20254990
2026 (through Aug 31, 2026)2200

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

994 of the 9,997 residential solar installs in Vista (9.9% of the 9,997 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Vista

1Sunrun3060not recorded
2Bright Planet Solar610not recorded
3Aloha Solar Power580not recorded
4Freedom Solar Co450not recorded
5Baker Electric, Inc.440not recorded
6Tesla Energy Operations (formerly SolarCity)310not recorded
7Semper Solaris Construction Inc290not recorded
8Stellar Solar240not recorded
9Cosmic Solar, Inc.230not recorded
10SOLARA HOME ENERGY LLC190not recorded
11Jamar Power System140not recorded
12New Era Electric120not recorded
13Blalock electric110not recorded
14Powur PBC (Powur Home)100not recorded
15Solartech100not recorded

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 761 of Vista’s 882 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (174, 22.9%) used modules recorded as Qcells.

In the last 24 months, 882 of Vista’s 882 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (423, 48.0%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1741,812
LONGi145638
Silfab121462
Canadian Solar51407
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.51not in top list
Inverter makerTesla423526
Enphase2533,504
SolarEdge2183,659
Delta Electronics14171
YottaEnergy,Inc11not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 9,046 of 9,997 installs, inverters on 9,736. See the methodology and the equipment index.

ZIP codes in Vista

ZIP codes with their own page where the utilities recorded Vista on at least 10% of the ZIP’s installs, through Aug 31, 2026.

920844,7804,781372
920812,7962,796275
920832,4212,421235

SGIP battery storage projects in Vista

The SGIP report lists 376 battery storage projects with the city Vista, 219 with the status Paid ($2,135,840 in current incentive allocations, 5,252 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid2195,252$2,135,840
PBI in Process43,015$867,351
Reserved27930$755,417
Waitlist698$126,353
Cancelled12016,679$5,072,799

Installers named on the most SGIP storage projects in Vista

InstallerProjectsPaid
Semper Solaris Construction Inc6145
Sunrun4822
HAVEN ENERGY SERVICES INC2111
Solare Energy, Inc1915
Sullivan Solar Power1313
Stellar Solar1010
TMAG INDUSTRIES INC1010
SOLAR 4 AMERICA97
APOLLO HOME POWER LLC82
Powur PBC (Powur Home)81

83 of the 376 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Vista is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
9,997
Last 24 months
882
Capacity
61.7 MW DC
Median system size
5.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
32.5% where reported
Ownership types recorded
PPA 2,350, lease 379, prepaid lease 13, other 116
Earliest install in data
Sep 20, 2000

Common questions

How many homes in Vista have solar?

9,997 residential solar systems in Vista were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 882 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Vista?

135 installer names have at least one install interconnected in Vista in the last 24 months, and 624 appear in the full record.

How common are batteries with new solar in Vista?

Battery storage is not recorded on the solar installs interconnected in Vista: SDG&E files a battery as its own project record, not on the solar record.

How many solar installs in Vista are under NEM 3.0?

994 of the 9,997 residential solar installs in Vista (9.9% of the 9,997 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.