Solar installers in Yolo County, California
Who installs the most solar in Yolo County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Yolo County are Sunrun (489), Citadel Roofing and Solar (270) and West Coast Solar (128). They account for 887 of the 2,389 residential solar installs interconnected there in that window.
In all, 20,844 homes in Yolo County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 173 installers with installs in this window. 48 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 489 | 2,086 |
| 2 | Citadel Roofing and Solar | 270 | 594 |
| 3 | West Coast Solar | 128 | 1,047 |
| 4 | Tesla Energy Operations (formerly SolarCity) | 103 | 1,681 |
| 5 | SonRay Construction Inc. | 90 | 506 |
| 6 | V3 Electric | 65 | 451 |
| 7 | AMBROSE SOLAR | 63 | 330 |
| 8 | NORTH VALLEY LLC | 62 | 256 |
| 9 | FREEDOM FOREVER LLC | 57 | 267 |
| 10 | BRIGHT OPS | 49 | 72 |
| 11 | GAF Energy | 45 | 49 |
| 12 | BETTER EARTH ELECTRIC INC | 44 | 97 |
| 13 | SOLARA HOME ENERGY LLC | 41 | 53 |
| 14 | Complete Solar | 39 | 56 |
| 15 | Westhaven Inc | 38 | 219 |
| 16 | SENGA ENERGY LLC | 37 | 102 |
| 17 | SunPower | 35 | 1,615 |
| 18 | Empower Electric Solar | 31 | 161 |
| 19 | ECLIPSE SOLAR & CONSTRUCTION | 24 | 89 |
| 20 | Capital City Solar Electric | 23 | 131 |
| 21 | AXIA SOLAR CORP | 21 | 21 |
| 22 | IE CONSTRUCTION | 20 | 20 |
| 23 | OHM SOLAR SOLUTIONS | 20 | 23 |
| 24 | SOLAR AND ROOF DIRECT | 19 | 19 |
| 25 | Sunriver Solar | 19 | 19 |
Most installs, all time
| 1 | Sunrun | 2,086 | 2,086 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,681 | 1,681 |
| 3 | SunPower | 1,615 | 1,615 |
| 4 | West Coast Solar | 1,047 | 1,047 |
| 5 | Vivint Solar Developer, LLC | 960 | 960 |
| 6 | Leonard's Roofing, Inc. | 610 | 610 |
| 7 | Citadel Roofing and Solar | 594 | 594 |
| 8 | SunPower Corporation - Merideth | 532 | 532 |
| 9 | SonRay Construction Inc. | 506 | 506 |
| 10 | V3 Electric | 451 | 451 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,077 | 179 |
| 2023 | 2,655 | 323 |
| 2024 | 1,515 | 676 |
| 2025 | 1,313 | 876 |
| 2026 (through Aug 31, 2026) | 638 | 460 |
Under the Net Billing Tariff (NEM 3.0)
2,437 of the 20,844 residential solar installs in Yolo County (11.7% of the 20,844 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Yolo County
| 1 | Sunrun | 632 | 627 | 99.2% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 143 | 131 | 91.6% |
| 3 | West Coast Solar | 142 | 36 | 25.4% |
| 4 | V3 Electric | 106 | 101 | 95.3% |
| 5 | NORTH VALLEY LLC | 101 | 100 | 99.0% |
| 6 | Empower Electric Solar | 94 | 81 | 86.2% |
| 7 | FREEDOM FOREVER LLC | 74 | 70 | 94.6% |
| 8 | BRIGHT OPS | 71 | 66 | 93.0% |
| 9 | AMBROSE SOLAR | 67 | 65 | 97.0% |
| 10 | BETTER EARTH ELECTRIC INC | 53 | 51 | 96.2% |
| 11 | SENGA ENERGY LLC | 45 | 42 | 93.3% |
| 12 | Westhaven Inc | 45 | 44 | 97.8% |
| 13 | GAF Energy | 35 | 32 | 91.4% |
| 14 | Citadel Roofing and Solar | 34 | 23 | 67.6% |
| 15 | FIVE STAR SOLAR | 28 | 26 | 92.9% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Yolo County
| City | All-time installs |
|---|---|
| Woodland | 7,386 |
| Davis | 6,111 |
| West Sacramento | 4,848 |
| Winters | 1,431 |
| Esparto | 335 |
| El Macero | 180 |
| Dunnigan | 126 |
| Knights Landing | 98 |
| Clarksburg | 83 |
| Guinda | 48 |
| Madison | 42 |
| Capay | 28 |
| Yolo | 24 |
| Brooks | 21 |
| Zamora | 21 |
| El Dorado Hills | 15 |
| W Sacramento | 13 |
| Rumsey | 10 |
| Danville | 1 |
| Pleasant Hill | 1 |
ZIP codes in Yolo County
ZIP codes with their own page where the utilities recorded Yolo County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95776 | 4,108 | 4,108 | 470 |
| 95691 | 4,013 | 4,013 | 438 |
| 95616 | 4,001 | 4,006 | 308 |
| 95695 | 3,278 | 3,278 | 407 |
| 95618 | 2,292 | 2,292 | 224 |
| 95694 | 1,430 | 1,516 | 240 |
| 95605 | 863 | 863 | 212 |
| 95627 | 336 | 336 | 32 |
| 95937 | 124 | 124 | 17 |
| 95645 | 98 | 104 | 13 |
| 95612 | 83 | 83 | 12 |
| 95637 | 48 | 48 | 8 |
| 95653 | 42 | 42 | 3 |
| 95607 | 28 | 28 | 2 |
Equipment recorded
In the last 24 months, 2,206 of Yolo County’s 2,389 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (696, 31.6%) used modules recorded as Qcells.
In the last 24 months, 2,389 of Yolo County’s 2,389 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,232, 51.6%) used inverters recorded as Enphase.
In the last 24 months, 1,230 of Yolo County’s 2,389 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (697, 56.7%) used batteries recorded as Tesla.
2,227 of 2,801 battery-paired PG&E and SCE installs (79.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 696 | 3,688 |
| JA Solar | 449 | 877 | |
| REC | 275 | 1,514 | |
| Silfab | 200 | not in top list | |
| LONGi | 198 | 1,017 | |
| Inverter maker | Enphase | 1,232 | 7,852 |
| Tesla | 964 | 1,585 | |
| SolarEdge | 329 | 5,923 | |
| FranklinWH | 65 | not in top list | |
| SMA | 56 | 1,677 | |
| Battery maker | Tesla | 697 | 1,074 |
| Enphase | 285 | 503 | |
| SolarEdge | 116 | 247 | |
| FranklinWH | 62 | 74 | |
| PointGuard Energy Inc. | 27 | 28 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 19,199 of 20,844 installs, inverters on 20,844. See the methodology and the equipment index.
SGIP battery storage projects in Yolo County
The SGIP public project report downloaded Nov 16, 2026 lists 276 battery storage projects in Yolo County with the status Paid, carrying $1,993,794 in current incentive allocations and 5,541 kWh of storage. Across every status it lists 433 storage projects there, 105 of them cancelled and 52 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 276 | 5,541 | $1,993,794 |
| PBI in Process | 9 | 6,823 | $2,031,828 |
| Reserved | 22 | 3,086 | $2,541,002 |
| Pending Reservation | 3 | 2,979 | $2,169,537 |
| Cancelled | 105 | 27,078 | $20,151,522 |
| RRF Rejected | 18 | 233 | $37,133 |
Installers named on the most SGIP storage projects in Yolo County
| Installer | Projects | Paid |
|---|---|---|
| Hooked On Solar | 61 | 46 |
| Sunrun | 42 | 37 |
| AMBROSE SOLAR | 36 | 27 |
| Citadel Roofing and Solar | 31 | 29 |
| JAJ Roofing dba Citadel Roofing & Solar | 31 | 29 |
| Semper Solaris Construction Inc | 31 | 23 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 20 | 14 |
| V3 Electric | 17 | 9 |
| Infinity Energy, Inc | 11 | 7 |
| PetersenDean | 11 | 9 |
45 of the 433 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Yolo County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Yolo County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Sacramento Municipal Util Dist | Political Subdivision | 64,626 | 62,657 | 423.393 | AC | 3,281 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Yolo County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Yolo County
8 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Yolo County as the county: 4 with the business type Corporation, Limited Liability, Partnership or JointVenture and 4 Sole Owner. 4 C-10 Electrical licenses in Yolo County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Yolo County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 20,844
- Last 24 months
- 2,389
- Capacity
- 125.6 MW DC
- Median system size
- 5.2 kW DC
- With battery storage
- 13.4% all time; 66.1% last 24 months
- Third-party owned
- 26.3% where reported
- Ownership types recorded
- PPA 4,587, lease 753, prepaid lease 24, other 111
- Median battery size
- 13.5 kWh
- Earliest install in data
- May 28, 1999
Common questions
How many homes in Yolo County have solar?
20,844 residential solar systems in Yolo County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,389 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Yolo County?
173 installer names have at least one install interconnected in Yolo County in the last 24 months, and 852 appear in the full record.
How common are batteries with new solar in Yolo County?
13.4% of the solar installs interconnected in Yolo County include battery storage across all years, and 66.1% in the last 24 months (1,578 of 2,389).
How many solar installs in Yolo County are under NEM 3.0?
2,437 of the 20,844 residential solar installs in Yolo County (11.7% of the 20,844 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.