Solar installers in Sacramento County, California

Who installs the most solar in Sacramento County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Sacramento County are Sunrun (7), BRIGHT OPS (3) and FREEDOM FOREVER LLC (3). They account for 13 of the 37 residential solar installs interconnected there in that window.

In all, 333 homes in Sacramento County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 23 of 23 installers with installs in this window. 1 installs in the window were self-installed or had no installer recorded.

1Sunrun742
2BRIGHT OPS35
3FREEDOM FOREVER LLC312
4AMBROSE SOLAR23
5FIVE STAR SOLAR23
6V3 Electric212
7A P ELECTRICAL11
8Aztec Solar Inc14
9Complete Solar11
10CONTINUUM11
11Fusion Power Design11
12JHP ELECTRIC INC11
13NEXT ELECTRIC11
14NORTH VALLEY LLC12
15RME INNOVATIONS INC11
16RW SOLAR AND ELECTRIC12
17SENGA ENERGY LLC11
18SPARTAN HOME SERVICES11
19Sun Up Electric Inc.12
20SunPower14
21Sunrise Solar13
22Tesla Energy Operations (formerly SolarCity)132
23Valley Solar, Inc.14

Most installs, all time

1Sunrun4242
2Tesla Energy Operations (formerly SolarCity)3232
3Infinity Energy, Inc1414
4FREEDOM FOREVER LLC1212
5V3 Electric1212
6Future Energy Corporation1010
7Sierra Pacific Home & Comfort77
8BRIGHT OPS55
9The Solar Company55
10Vivint Solar Developer, LLC55

Installs by year

YearInstalls interconnectedWith battery storage
20222810
2023419
20242823
20252014
2026 (through Aug 31, 2026)98

Under the Net Billing Tariff (NEM 3.0)

56 of the 333 residential solar installs in Sacramento County (16.8% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The latest was approved Jul 1, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Sacramento County

1Sunrun2121100.0%
2BRIGHT OPS55100.0%
3FREEDOM FOREVER LLC5360.0%
4AMBROSE SOLAR22100.0%
5FIVE STAR SOLAR22100.0%
6SunPower22100.0%
7V3 Electric22100.0%
8A P ELECTRICAL11100.0%
9AMERISUN100.0%
10Aztec Solar Inc11100.0%
11Complete Solar100.0%
12CONTINUUM11100.0%
13JHP ELECTRIC INC11100.0%
14LEVION CONSTRUCTION LLC100.0%
15NEXT ELECTRIC11100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Sacramento County

CityAll-time installs
Walnut Grove114
Isleton89
Galt52
Elverta50
Ryde7
Sacramento6
Davis4
Rio Vista4
Courtland3
Cameron Park1
Danville1
El Dorado1
Roseville1

ZIP codes in Sacramento County

ZIP codes with their own page where the utilities recorded Sacramento County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

9569011511718
9564189899
956325210517
9562651897

Equipment recorded

In the last 24 months, 35 of Sacramento County’s 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 22.9%) used modules recorded as Qcells.

In the last 24 months, 37 of Sacramento County’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (15, 40.5%) used inverters recorded as Tesla.

In the last 24 months, 25 of Sacramento County’s 37 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (11, 44.0%) used batteries recorded as Tesla.

64 of 70 battery-paired PG&E and SCE installs (91.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells864
JA Solar728
Canadian Solar428
REC423
LONGi322
Inverter makerTesla1536
Enphase1292
SolarEdge9119
Sol-Ark2not in top list
Delta Electronics1not in top list
Battery makerTesla1131
Enphase710
SolarEdge512
FranklinWH11
PointGuard Energy Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 319 of 333 installs, inverters on 333. See the methodology and the equipment index.

SGIP battery storage projects in Sacramento County

The SGIP public project report downloaded Nov 16, 2026 lists 580 battery storage projects in Sacramento County with the status Paid, carrying $3,783,773 in current incentive allocations and 12,195 kWh of storage. Across every status it lists 1,916 storage projects there, 296 of them cancelled and 1,040 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid58012,195$3,783,773
Reserved78712,260$18,956,597
Pending Reservation1131,661$2,992,826
Waitlist1061,520$2,089,991
Cancelled29610,457$20,750,154
RRF Rejected34451$68,272

Installers named on the most SGIP storage projects in Sacramento County

InstallerProjectsPaid
ES SOLAR LLC809321
HAVEN ENERGY SERVICES INC45812
SOLAR 4 AMERICA8137
PetersenDean8036
SOLCORE INC480
SPARTAN HOME SERVICES4710
Sunrun4712
Semper Solaris Construction Inc4221
GRID Alternatives340
Infinity Energy, Inc2823

147 of the 1,916 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Sacramento County (EIA)

EIA’s 2025 Service Territory file lists 3 utilities serving Sacramento County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Sacramento Municipal Util DistPolitical Subdivision64,62662,657423.393AC3,281

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Sacramento County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Sacramento County

55 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Sacramento County as the county: 42 with the business type Corporation, Limited Liability, Partnership or JointVenture and 13 Sole Owner. 30 C-10 Electrical licenses in Sacramento County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Sacramento County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

Solar permit data in Sacramento County

2 permit datasets in Sacramento County are published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Area coveredAgencySolar permits, 2025Battery permits, 2025Full table
City of SacramentoCity of Sacramento Community Development Department481355Below
unincorporated Sacramento CountySacramento County647289Below

Solar permits issued in the City of Sacramento

From The City of Sacramento Community Development Department’s open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. Counted by calendar year of the Status_Date field. Solar: Work_Desc contains SOLAR or PHOTOVOLTAIC, or Category = 'Solar System'; Type = 'Residential'; Sub_Type is 'Web-Minor' or 'Minor' (permits for existing homes); descriptions that begin with a 0 kW or null solar size are left out. Battery: Type = 'Residential' and Work_Desc lists a nonzero PV storage size or mentions BATTER, ENERGY STORAGE or POWERWALL. Checked Nov 16, 2026.

YearSolar permitsBattery permits
20181,15614
20191,09318
20201,13331
20211,00031
202293639
202357576
202440671
2025481355
2026 (through Nov 16, 2026)576897

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento homes are served by SMUD, which does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. New homes, which California requires to include solar, are filed as new-building and production permits and are not in the solar count. The layer names the contractor but no license number, so permits are not linked to installers.

Solar permits issued in unincorporated Sacramento County

From Sacramento County’s open data: Permits, Sacramento County ArcGIS layer listed on data.saccounty.gov. Counted by calendar year of the ISSUED_DATE field. Solar: Application_Type = 'Residential' and either PermitCategory = 'SolarApp', or PermitCategory = 'MISR' (miscellaneous residential) with a WorkDescription that names a photovoltaic or solar PV system, rooftop solar or solar panels, or mentions solar with kW or modules; descriptions about removing and reinstalling, adding to existing solar, pool or water heating, or 'no solar' are left out. Battery: those solar permits whose WorkDescription mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 14, 2026. Checked Nov 16, 2026.

YearSolar permitsBattery permits
2021908115
2022811145
2023587104
2024396104
2025647289
2026 (through Nov 16, 2026)740326

By month, December 2024 to November 2026

Month issuedSolar permitsWith a battery
December 2024298
January 20254014
February 2025224
March 202514556
April 20253612
May 20253913
June 20253216
July 20253218
August 20255132
September 20255530
October 20254929
November 20256927
December 20257738
January 20263318
February 20261813
March 20263714
April 20263421
May 20263819
June 202611335
July 202611527
August 202610255
September 202613448
October 20267849
November 2026 (through Nov 16, 2026)3827

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento County issues building permits for the unincorporated county. Cities such as Sacramento, Elk Grove, Citrus Heights, Folsom and Rancho Cordova issue their own; the City of Sacramento’s are shown separately. Most of the county is served by SMUD, which does not report to California DG Stats. The layer’s issue dates begin in 2021, so earlier years are not shown. New homes, filed as new-building and production permits, are not in the solar count. The layer names a contractor on most permits but no license number, so permits are not linked to installers.

At a glance

Residential solar installs
333
Last 24 months
37
Capacity
2,827.9 kW DC
Median system size
7 kW DC
With battery storage
21.0% all time; 81.1% last 24 months
Third-party owned
24.6% where reported
Ownership types recorded
PPA 69, lease 12, other 1
Median battery size
9.8 kWh
Earliest install in data
Dec 15, 2003

Common questions

How many homes in Sacramento County have solar?

333 residential solar systems in Sacramento County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 37 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Sacramento County?

23 installer names have at least one install interconnected in Sacramento County in the last 24 months, and 139 appear in the full record.

How common are batteries with new solar in Sacramento County?

21.0% of the solar installs interconnected in Sacramento County include battery storage across all years, and 81.1% in the last 24 months (30 of 37).

How many solar installs in Sacramento County are under NEM 3.0?

56 of the 333 residential solar installs in Sacramento County (16.8% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.