Solar installers in Sonoma County, California
Who installs the most solar in Sonoma County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Sonoma County are Sunrun (1,100), Northern Pacific Power Systems, Inc. (383) and BRIGHT OPS (329). They account for 1,812 of the 4,716 residential solar installs interconnected there in that window.
In all, 33,037 homes in Sonoma County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 250 installers with installs in this window. 146 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 1,100 | 3,725 |
| 2 | Northern Pacific Power Systems, Inc. | 383 | 1,763 |
| 3 | BRIGHT OPS | 329 | 374 |
| 4 | Tesla Energy Operations (formerly SolarCity) | 178 | 3,109 |
| 5 | VITAL ENERGY SOLUTIONS LLC | 130 | 132 |
| 6 | SOLARA HOME ENERGY LLC | 110 | 112 |
| 7 | MICHAEL & SUN SOLAR INC | 93 | 378 |
| 8 | ROCKIN ROOFERS | 89 | 708 |
| 9 | V3 Electric | 87 | 124 |
| 10 | Citadel Roofing and Solar | 81 | 591 |
| 11 | SUNTEGRITY SOLAR | 79 | 400 |
| 12 | Complete Solar | 70 | 141 |
| 13 | SunPower | 70 | 1,180 |
| 14 | Synergy Solar & Electrical Systems Inc. | 70 | 524 |
| 15 | TAYLOR ENERGY SYSTEMS INC | 70 | 266 |
| 16 | AMY'S ROOFING AND SOLAR | 69 | 136 |
| 17 | SolarCraft Services | 65 | 687 |
| 18 | FREEDOM FOREVER LLC | 63 | 702 |
| 19 | Summit Technology Group | 63 | 251 |
| 20 | Semper Solaris Construction Inc | 59 | 213 |
| 21 | Solar Works | 49 | 515 |
| 22 | M D ELECTRIC & SOLAR INC | 48 | 132 |
| 23 | FIRST RESPONSE SOLAR INC | 39 | 310 |
| 24 | Pure Power Solutions | 38 | 369 |
| 25 | LIFESTYLE SOLAR INC | 37 | 37 |
Most installs, all time
| 1 | Sunrun | 3,725 | 3,725 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 3,109 | 3,109 |
| 3 | Northern Pacific Power Systems, Inc. | 1,763 | 1,763 |
| 4 | Vivint Solar Developer, LLC | 1,460 | 1,460 |
| 5 | SunPower | 1,180 | 1,180 |
| 6 | ROCKIN ROOFERS | 708 | 708 |
| 7 | FREEDOM FOREVER LLC | 702 | 702 |
| 8 | SolarCraft Services | 687 | 687 |
| 9 | Citadel Roofing and Solar | 591 | 591 |
| 10 | J & J ELECTRIC | 531 | 531 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 4,017 | 1,010 |
| 2023 | 4,492 | 861 |
| 2024 | 2,517 | 1,561 |
| 2025 | 2,422 | 1,855 |
| 2026 (through Aug 31, 2026) | 1,489 | 1,134 |
Under the Net Billing Tariff (NEM 3.0)
4,856 of the 33,037 residential solar installs in Sonoma County (14.7% of the 33,035 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.3% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Sonoma County
| 1 | Sunrun | 1,384 | 1,369 | 98.9% |
| 2 | Northern Pacific Power Systems, Inc. | 402 | 394 | 98.0% |
| 3 | BRIGHT OPS | 368 | 345 | 93.8% |
| 4 | Tesla Energy Operations (formerly SolarCity) | 218 | 204 | 93.6% |
| 5 | ROCKIN ROOFERS | 139 | 78 | 56.1% |
| 6 | VITAL ENERGY SOLUTIONS LLC | 121 | 115 | 95.0% |
| 7 | FREEDOM FOREVER LLC | 117 | 109 | 93.2% |
| 8 | V3 Electric | 89 | 85 | 95.5% |
| 9 | MICHAEL & SUN SOLAR INC | 78 | 73 | 93.6% |
| 10 | TAYLOR ENERGY SYSTEMS INC | 78 | 64 | 82.1% |
| 11 | Synergy Solar & Electrical Systems Inc. | 74 | 73 | 98.6% |
| 12 | AMY'S ROOFING AND SOLAR | 69 | 58 | 84.1% |
| 13 | SolarCraft Services | 69 | 64 | 92.8% |
| 14 | SUNTEGRITY SOLAR | 65 | 58 | 89.2% |
| 15 | Solar Works | 62 | 46 | 74.2% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Sonoma County
| City | All-time installs |
|---|---|
| Santa Rosa | 13,181 |
| Petaluma | 4,821 |
| Sebastopol | 2,958 |
| Sonoma | 2,640 |
| Rohnert Park | 2,593 |
| Windsor | 2,065 |
| Cloverdale | 830 |
| Healdsburg | 630 |
| Cotati | 495 |
| Penngrove | 415 |
| Glen Ellen | 386 |
| The Sea Ranch | 366 |
| Forestville | 330 |
| Bodega Bay | 219 |
| Kenwood | 199 |
| Guerneville | 174 |
| Geyserville | 158 |
| Occidental | 129 |
| Graton | 89 |
| Monte Rio | 53 |
ZIP codes in Sonoma County
ZIP codes with their own page where the utilities recorded Sonoma County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95404 | 3,126 | 3,126 | 409 |
| 95472 | 2,953 | 2,953 | 359 |
| 95403 | 2,941 | 2,941 | 481 |
| 95476 | 2,646 | 2,653 | 393 |
| 94928 | 2,594 | 2,594 | 394 |
| 94952 | 2,523 | 2,536 | 347 |
| 95409 | 2,326 | 2,326 | 352 |
| 94954 | 2,302 | 2,302 | 241 |
| 95492 | 2,065 | 2,065 | 277 |
| 95401 | 1,696 | 1,696 | 240 |
| 95407 | 1,645 | 1,646 | 337 |
| 95405 | 1,444 | 1,444 | 177 |
| 95425 | 830 | 830 | 121 |
| 95448 | 629 | 629 | 85 |
| 94931 | 494 | 494 | 63 |
| 94951 | 415 | 415 | 48 |
| 95442 | 386 | 386 | 53 |
| 95497 | 366 | 366 | 69 |
| 95436 | 331 | 331 | 38 |
| 94923 | 218 | 218 | 31 |
| 95452 | 193 | 193 | 26 |
| 95446 | 174 | 174 | 19 |
| 95441 | 159 | 159 | 22 |
| 95465 | 131 | 131 | 18 |
| 95444 | 91 | 91 | 11 |
| 95462 | 53 | 53 | 2 |
| 95439 | 48 | 48 | 14 |
| 95450 | 47 | 47 | 8 |
| 95421 | 42 | 42 | 7 |
| 94922 | 27 | 27 | 3 |
Equipment recorded
In the last 24 months, 4,435 of Sonoma County’s 4,716 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,243, 28.0%) used modules recorded as Qcells.
In the last 24 months, 4,716 of Sonoma County’s 4,716 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,986, 42.1%) used inverters recorded as Enphase.
In the last 24 months, 3,026 of Sonoma County’s 4,716 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1,506, 49.8%) used batteries recorded as Tesla.
6,923 of 8,195 battery-paired PG&E and SCE installs (84.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,243 | 4,796 |
| JA Solar | 818 | 1,857 | |
| REC | 606 | 3,014 | |
| Silfab | 300 | 1,954 | |
| LONGi | 251 | not in top list | |
| Inverter maker | Enphase | 1,986 | 12,912 |
| Tesla | 1,953 | 4,227 | |
| SolarEdge | 880 | 9,442 | |
| FranklinWH | 218 | not in top list | |
| SMA | 119 | 3,024 | |
| Battery maker | Tesla | 1,506 | 3,280 |
| Enphase | 762 | 1,565 | |
| SolarEdge | 347 | 455 | |
| FranklinWH | 208 | 277 | |
| Lunar Energy | 85 | 85 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 30,647 of 33,037 installs, inverters on 33,032. See the methodology and the equipment index.
SGIP battery storage projects in Sonoma County
The SGIP public project report downloaded Nov 16, 2026 lists 1,785 battery storage projects in Sonoma County with the status Paid, carrying $34,272,247 in current incentive allocations and 52,578 kWh of storage. Across every status it lists 3,046 storage projects there, 1,024 of them cancelled and 237 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1,785 | 52,578 | $34,272,247 |
| PBI in Process | 20 | 31,332 | $7,478,175 |
| Reserved | 133 | 9,127 | $6,908,675 |
| Pending Reservation | 22 | 4,596 | $3,603,268 |
| Cancelled | 1,024 | 86,479 | $48,685,624 |
| RRF Rejected | 62 | 859 | $136,263 |
Installers named on the most SGIP storage projects in Sonoma County
| Installer | Projects | Paid |
|---|---|---|
| Northern Pacific Power Systems, Inc. | 309 | 231 |
| Sunrun | 246 | 126 |
| Infinity Energy, Inc | 206 | 132 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 204 | 122 |
| Semper Solaris Construction Inc | 193 | 116 |
| JAJ Roofing dba Citadel Roofing & Solar | 154 | 133 |
| Citadel Roofing and Solar | 153 | 132 |
| J & J ELECTRIC | 136 | 96 |
| SunPower | 105 | 69 |
| Tesla | 104 | 81 |
247 of the 3,046 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Sonoma County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Sonoma County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: City of Healdsburg - (CA); WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Sonoma County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Sonoma County
34 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Sonoma County as the county: 22 with the business type Corporation, Limited Liability, Partnership or JointVenture and 12 Sole Owner. 29 C-10 Electrical licenses in Sonoma County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Sonoma County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
Solar permit data in Sonoma County
One permit dataset in Sonoma County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Area covered | Agency | Solar permits, 2025 | Battery permits, 2025 | Full table |
|---|---|---|---|---|
| unincorporated Sonoma County | County of Sonoma | not in the dataset | not countable | Below |
Solar permits issued in unincorporated Sonoma County
From The County of Sonoma’s open data: Sonoma County Construction Permits, data.sonomacounty.ca.gov dataset 88ms-k5e7. Counted by calendar year of the issued field. Solar: application_type is 'Solar-SolarAPP' or 'Solar-SolarAPP Revision', or a building permit whose description contains SOLAR or PHOTOVOLTAIC (any case) and neither THERMAL nor COMM (commercial). Battery: a solar or building permit whose description contains BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: May 30, 2025. Checked Nov 16, 2026.
| Year | Solar permits | Battery permits |
|---|---|---|
| 2023 | 1,480 | 361 |
| 2024 | 932 | 424 |
A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. The dataset describes itself as permits for unincorporated Sonoma County parcels over the past 48 months. On the check date its issue dates ran from 2022-11-16 to 2025-05-30, so only the full calendar years inside that range are shown. Cities such as Santa Rosa and Petaluma issue their own permits. The dataset has no contractor license field.
At a glance
- Residential solar installs
- 33,037
- Last 24 months
- 4,716
- Capacity
- 208.5 MW DC
- Median system size
- 5.3 kW DC
- With battery storage
- 24.8% all time; 75.9% last 24 months
- Third-party owned
- 17.3% where reported
- Ownership types recorded
- PPA 4,596, lease 1,021, prepaid lease 38, other 65
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 25, 1999
Common questions
How many homes in Sonoma County have solar?
33,037 residential solar systems in Sonoma County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 4,716 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Sonoma County?
250 installer names have at least one install interconnected in Sonoma County in the last 24 months, and 1,233 appear in the full record.
How common are batteries with new solar in Sonoma County?
24.8% of the solar installs interconnected in Sonoma County include battery storage across all years, and 75.9% in the last 24 months (3,578 of 4,716).
How many solar installs in Sonoma County are under NEM 3.0?
4,856 of the 33,037 residential solar installs in Sonoma County (14.7% of the 33,035 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.