Solar installers in Solano County, California
Who installs the most solar in Solano County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Solano County are Sunrun (1,777), Citadel Roofing and Solar (622) and BRIGHT OPS (458). They account for 2,857 of the 5,955 residential solar installs interconnected there in that window.
In all, 40,544 homes in Solano County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 215 installers with installs in this window. 68 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 1,777 | 5,399 |
| 2 | Citadel Roofing and Solar | 622 | 1,475 |
| 3 | BRIGHT OPS | 458 | 530 |
| 4 | AMBROSE SOLAR | 404 | 2,423 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 206 | 4,042 |
| 6 | SunPower | 204 | 3,604 |
| 7 | NORTH VALLEY LLC | 191 | 703 |
| 8 | Complete Solar | 134 | 226 |
| 9 | FREEDOM FOREVER LLC | 134 | 935 |
| 10 | GAF Energy | 130 | 138 |
| 11 | BETTER EARTH ELECTRIC INC | 116 | 348 |
| 12 | V3 Electric | 96 | 1,089 |
| 13 | SonRay Construction Inc. | 70 | 485 |
| 14 | Semper Solaris Construction Inc | 60 | 333 |
| 15 | CONTINUUM | 59 | 59 |
| 16 | Empower Electric Solar | 54 | 249 |
| 17 | SENGA ENERGY LLC | 53 | 159 |
| 18 | Westhaven Inc | 49 | 477 |
| 19 | MASTER ROOFING SOLUTIONS LLC | 45 | 45 |
| 20 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 40 | 40 |
| 21 | LYTEGEN | 40 | 40 |
| 22 | Future Energy Corporation | 38 | 758 |
| 23 | AXIA SOLAR CORP | 35 | 35 |
| 24 | SOLAR AND ROOF DIRECT | 32 | 32 |
| 25 | GOT WATTS ELECTRIC, SOLAR & HVAC | 31 | 78 |
Most installs, all time
| 1 | Sunrun | 5,399 | 5,399 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 4,042 | 4,042 |
| 3 | SunPower | 3,604 | 3,604 |
| 4 | Vivint Solar Developer, LLC | 2,498 | 2,498 |
| 5 | AMBROSE SOLAR | 2,423 | 2,423 |
| 6 | Citadel Roofing and Solar | 1,475 | 1,475 |
| 7 | V3 Electric | 1,089 | 1,089 |
| 8 | Bright Planet Solar | 1,040 | 1,040 |
| 9 | FREEDOM FOREVER LLC | 935 | 935 |
| 10 | Future Energy Corporation | 758 | 758 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 4,954 | 552 |
| 2023 | 4,691 | 664 |
| 2024 | 3,010 | 1,777 |
| 2025 | 3,218 | 2,288 |
| 2026 (through Aug 31, 2026) | 1,743 | 1,191 |
Under the Net Billing Tariff (NEM 3.0)
5,695 of the 40,544 residential solar installs in Solano County (14.0% of the 40,544 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Solano County
| 1 | Sunrun | 1,654 | 1,618 | 97.8% |
| 2 | BRIGHT OPS | 525 | 506 | 96.4% |
| 3 | AMBROSE SOLAR | 454 | 439 | 96.7% |
| 4 | NORTH VALLEY LLC | 438 | 438 | 100.0% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 255 | 241 | 94.5% |
| 6 | FREEDOM FOREVER LLC | 199 | 188 | 94.5% |
| 7 | V3 Electric | 137 | 129 | 94.2% |
| 8 | BETTER EARTH ELECTRIC INC | 136 | 133 | 97.8% |
| 9 | Citadel Roofing and Solar | 123 | 58 | 47.2% |
| 10 | Empower Electric Solar | 87 | 80 | 92.0% |
| 11 | SonRay Construction Inc. | 85 | 1 | 1.2% |
| 12 | Semper Solaris Construction Inc | 70 | 55 | 78.6% |
| 13 | SunPower | 69 | 58 | 84.1% |
| 14 | Westhaven Inc | 62 | 62 | 100.0% |
| 15 | Future Energy Corporation | 57 | 55 | 96.5% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Solano County
| City | All-time installs |
|---|---|
| Vacaville | 13,133 |
| Fairfield | 10,522 |
| Vallejo | 6,002 |
| Dixon | 3,611 |
| Rio Vista | 2,633 |
| Suisun City | 2,463 |
| Benicia | 2,015 |
| Winters | 84 |
| Elmira | 19 |
| Davis | 6 |
| American Canyon | 4 |
| Birds Landing | 3 |
| Walnut Grove | 2 |
| San Ramon | 1 |
ZIP codes in Solano County
ZIP codes with their own page where the utilities recorded Solano County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95687 | 8,299 | 8,299 | 1,384 |
| 94533 | 6,680 | 6,680 | 913 |
| 95688 | 4,838 | 4,839 | 509 |
| 94534 | 3,939 | 3,939 | 475 |
| 95620 | 3,610 | 3,610 | 607 |
| 94591 | 3,541 | 3,541 | 611 |
| 94571 | 2,633 | 2,638 | 349 |
| 94585 | 2,359 | 2,362 | 323 |
| 94510 | 2,015 | 2,015 | 274 |
| 94589 | 1,380 | 1,380 | 242 |
| 94590 | 1,079 | 1,079 | 195 |
Equipment recorded
In the last 24 months, 5,552 of Solano County’s 5,955 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2,143, 38.6%) used modules recorded as Qcells.
In the last 24 months, 5,955 of Solano County’s 5,955 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2,760, 46.3%) used inverters recorded as Tesla.
In the last 24 months, 3,336 of Solano County’s 5,955 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2,025, 60.7%) used batteries recorded as Tesla.
6,070 of 7,347 battery-paired PG&E and SCE installs (82.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 2,143 | 8,084 |
| JA Solar | 1,356 | 2,372 | |
| LONGi | 545 | 2,938 | |
| REC | 487 | 3,365 | |
| Elin Energy | 224 | not in top list | |
| Inverter maker | Tesla | 2,760 | 4,322 |
| Enphase | 2,726 | 15,403 | |
| SolarEdge | 1,113 | 12,829 | |
| SunPower | 128 | 4,252 | |
| Delta Electronics | 86 | not in top list | |
| Battery maker | Tesla | 2,025 | 3,179 |
| SolarEdge | 540 | 671 | |
| Enphase | 532 | 1,010 | |
| FranklinWH | 66 | 126 | |
| PointGuard Energy Inc. | 46 | 46 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37,445 of 40,544 installs, inverters on 40,539. See the methodology and the equipment index.
SGIP battery storage projects in Solano County
The SGIP public project report downloaded Nov 16, 2026 lists 831 battery storage projects in Solano County with the status Paid, carrying $7,366,915 in current incentive allocations and 18,519 kWh of storage. Across every status it lists 1,619 storage projects there, 636 of them cancelled and 152 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 831 | 18,519 | $7,366,915 |
| PBI in Process | 4 | 6,102 | $2,542,850 |
| Reserved | 70 | 17,493 | $6,615,969 |
| Pending Reservation | 15 | 211 | $400,711 |
| Cancelled | 636 | 35,402 | $16,686,087 |
| RRF Rejected | 63 | 1,716 | $587,028 |
Installers named on the most SGIP storage projects in Solano County
| Installer | Projects | Paid |
|---|---|---|
| AMBROSE SOLAR | 224 | 173 |
| Sunrun | 151 | 106 |
| Semper Solaris Construction Inc | 129 | 74 |
| Citadel Roofing and Solar | 94 | 84 |
| JAJ Roofing dba Citadel Roofing & Solar | 94 | 84 |
| Hooked On Solar | 72 | 52 |
| V3 Electric | 63 | 34 |
| SunPower | 60 | 34 |
| Infinity Energy, Inc | 53 | 36 |
| SOLAR 4 AMERICA | 40 | 30 |
346 of the 1,619 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Solano County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Solano County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Pittsburg Power Company; WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Solano County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Solano County
11 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Solano County as the county: 8 with the business type Corporation, Limited Liability, Partnership or JointVenture and 3 Sole Owner. 5 C-10 Electrical licenses in Solano County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Solano County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 40,544
- Last 24 months
- 5,955
- Capacity
- 237.6 MW DC
- Median system size
- 5.1 kW DC
- With battery storage
- 18.1% all time; 69.8% last 24 months
- Third-party owned
- 30.3% where reported
- Ownership types recorded
- PPA 9,155, lease 2,578, prepaid lease 384, other 168
- Median battery size
- 13.5 kWh
- Earliest install in data
- Oct 15, 1998
Common questions
How many homes in Solano County have solar?
40,544 residential solar systems in Solano County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 5,955 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Solano County?
215 installer names have at least one install interconnected in Solano County in the last 24 months, and 1,074 appear in the full record.
How common are batteries with new solar in Solano County?
18.1% of the solar installs interconnected in Solano County include battery storage across all years, and 69.8% in the last 24 months (4,155 of 5,955).
How many solar installs in Solano County are under NEM 3.0?
5,695 of the 40,544 residential solar installs in Solano County (14.0% of the 40,544 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.