Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Orange County are Sunrun (3,786), Tesla Energy Operations (formerly SolarCity) (1,303) and ORANGE COUNTY CONTRACTING SERVICES (664). They account for 5,753 of the 16,817 residential solar installs interconnected there in that window.

In all, 133,331 homes in Orange County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 713 installers with installs in this window. 447 installs in the window were self-installed or had no installer recorded.

1Sunrun3,78614,331
2Tesla Energy Operations (formerly SolarCity)1,30317,179
3ORANGE COUNTY CONTRACTING SERVICES6641,568
4SUNNOVA ENERGY CORPORATION5061,534
5FREEDOM FOREVER LLC5042,136
6GAF Energy501536
7SOLARA HOME ENERGY LLC438442
8SunPower4369,539
9BRIGHT OPS427491
10SWSS ELECTRICAL2821,256
11INFINITY SOLAR254640
12ECOSOLAR USA ELECTRICAL LLC204617
13LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC189246
14Aikyum Solar188697
15Solar Optimum Inc.1811,354
16ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING177999
17Complete Solar170567
18Semper Solaris Construction Inc1692,146
19FREEDOM FOREVER SOUTHERN CALIFORNIA LLC166166
20SOLAR TECH ENERGY SYSTEMS INC140426
21AXIA SOLAR CORP133138
22SolarMax Renewable Energy Provider, Inc1321,529
23Bright Planet Solar1271,710
24AMECO SOLAR LLC112511
25Freedom Solar Co108476

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)17,17917,179
2Sunrun14,33114,331
3SunPower9,5399,539
4Vivint Solar Developer, LLC4,0734,073
5Semper Solaris Construction Inc2,1462,146
6FREEDOM FOREVER LLC2,1362,136
7Bright Planet Solar1,7101,710
8Verengo1,6561,656
9ORANGE COUNTY CONTRACTING SERVICES1,5681,568
10SUNNOVA ENERGY CORPORATION1,5341,534

Installs by year

YearInstalls interconnectedWith battery storage
202215,2231,952
202319,8142,488
20249,0794,091
20258,3765,469
2026 (through Aug 31, 2026)5,8784,209

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

19,618 of the 133,331 residential solar installs in Orange County (14.7% of the 133,285 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.9% of those on PG&E and SCE records include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Orange County

1Sunrun4,7743,66589.2%
2Tesla Energy Operations (formerly SolarCity)1,5001,21792.9%
3ORANGE COUNTY CONTRACTING SERVICES66564096.2%
4FREEDOM FOREVER LLC65461393.7%
5GAF Energy51344291.5%
6SUNNOVA ENERGY CORPORATION50735369.6%
7BRIGHT OPS49146795.1%
8SWSS ELECTRICAL44918040.1%
9SOLARA HOME ENERGY LLC44271.6%
10SunPower42116442.5%
11INFINITY SOLAR28825889.6%
12ECOSOLAR USA ELECTRICAL LLC2524116.3%
13Bright Planet Solar2334048.2%
14Solar Optimum Inc.23216783.5%
15ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING21919895.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Orange County

CityAll-time installs
Irvine16,422
Santa Ana7,547
Huntington Beach7,478
Mission Viejo6,952
Ramona6,287
Orange6,197
San Clemente5,743
Yorba Linda5,691
Fullerton5,561
Garden Grove5,231
Lake Forest4,825
Laguna Niguel4,055
Buena Park3,583
Tustin3,152
Placentia3,119
Westminster3,045
Costa Mesa3,021
Fountain Valley2,874
San Juan Capo2,608
Cypress2,497

ZIP codes in Orange County

ZIP codes with their own page where the utilities recorded Orange County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

926187,4437,4471,551
920656,2876,288475
926304,5344,538470
926774,0574,059268
928864,0514,053436
926793,7963,799382
926913,5443,547419
926733,4093,409246
926923,4043,406348
928703,1093,110415
926833,0403,046496
926462,9782,979418
926202,9562,956270
927082,8682,874407
927052,8162,820349
926752,6072,939226
906302,4222,424329
928672,4092,410274
906312,4032,837452
926722,3342,334201
906202,3322,336262
926882,2842,284249
926022,2802,281296
928692,0802,080280
928212,0782,082221
926471,9811,983292
928331,9271,931245
926261,8081,809227
928351,7971,798287
928401,6481,648303
928871,6261,627221
927821,6151,616129
926941,5554,979743
926561,5411,585208
927801,5211,524252
907201,5091,510196
927041,4881,491191
926491,3391,342192
926291,3021,302121
906211,2461,247144
926271,2101,211154
928411,1951,195199
926481,1711,173214
928311,1691,169154
926511,1591,160173
926601,0761,090171
928431,0311,032208
927061,0241,025147
92865992993132
9200497697669
92604901901119
92707896896121
92845878878118
90680856859137
9261085385387
90623841842104
90740812812102
92603798800115
92703743744106
9286168768994
9283266266281
92625589592128
9260658358473
9270157157187
92617565566122
92663487487119
9284447647685
926534632,412205
9261446146164
9280444244462
9286841841939
9262439140742
9282338138240
9265736936948
9261234034062
9286631631743
9267618418548
9263718318327
9265515815833
9266112412426
92662666915
9262359590
9267836362
9280732326
9270928280

Equipment recorded

In the last 24 months, 16,415 of Orange County’s 16,817 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6,404, 39.0%) used modules recorded as Qcells.

In the last 24 months, 16,771 of Orange County’s 16,817 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7,254, 43.3%) used inverters recorded as Tesla.

In the last 24 months, 10,961 of Orange County’s 16,817 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7,891, 72.0%) used batteries recorded as Tesla.

20,378 of 21,212 battery-paired PG&E and SCE installs (96.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6,40425,687
LONGi1,6325,372
JA Solar1,4074,289
Silfab1,285not in top list
REC1,2697,903
Inverter makerTesla7,2549,827
Enphase6,53644,981
SolarEdge2,51941,334
Delta Electronics2703,054
SunPower22511,264
Battery makerTesla7,89112,609
Enphase1,6132,941
SolarEdge8051,074
FranklinWH362409
LG1372,603

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 113,169 of 133,331 installs, inverters on 132,333. See the methodology and the equipment index.

SGIP battery storage projects in Orange County

The SGIP public project report downloaded Nov 16, 2026 lists 3,462 battery storage projects in Orange County with the status Paid, carrying $59,301,433 in current incentive allocations and 112,354 kWh of storage. Across every status it lists 5,575 storage projects there, 1,456 of them cancelled and 657 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid3,462112,354$59,301,433
PBI in Process6854,466$23,413,218
Reserved37644,707$15,051,495
Pending Reservation693,054$11,279,573
Waitlist401,218$2,143,218
Cancelled1,456155,204$87,435,841
RRF Rejected1042,135$518,381

Installers named on the most SGIP storage projects in Orange County

InstallerProjectsPaid
Sunrun938614
Semper Solaris Construction Inc589465
SunPower308167
Tesla296262
Tesla Energy Operations (formerly SolarCity)246219
LA Solar Group238169
SWELL SERVICES INC DBA SWELL CONTRACTORS233171
Solar Optimum Inc.202147
ORANGE COUNTY CONTRACTING SERVICES198102
SolarMax Renewable Energy Provider, Inc15897

642 of the 5,575 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Orange County (EIA)

EIA’s 2025 Service Territory file lists 3 utilities serving Orange County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848
San Diego Gas & Electric CoInvestor Owned346,738340,5002,361.405AC10,687
City of Anaheim - (CA)Municipal5,5445,35155.62DC0

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Orange County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Orange County

77 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Orange County as the county: 57 with the business type Corporation, Limited Liability, Partnership or JointVenture and 20 Sole Owner. 55 C-10 Electrical licenses in Orange County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Orange County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

Solar permit data in Orange County

One permit dataset in Orange County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Area coveredAgencySolar permits, 2025Battery permits, 2025Full table
City of AnaheimCity of Anaheim2576Below

Solar permits issued in the City of Anaheim

From The City of Anaheim’s open data: Building Permits (public view of Accela building permits), City of Anaheim ArcGIS layer. Counted by calendar year of the permitissued field. Solar: typeofwork is 'Photovoltaic System', 'Photovoltaic with Micro-Inverters' or 'Phototvoltaic with Micro-Inverters' (as spelled in the data), and comres starts with 'Residential'. Battery: those solar permits whose description mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 15, 2026. Checked Nov 16, 2026.

YearSolar permitsBattery permits
20181709
201920014
202017822
202124979
202230897
202338528
20242969
20252576
2026 (through Nov 16, 2026)1664

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Anaheim homes are served by Anaheim Public Utilities, a city utility that does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. The layer names the contractor but no license number, so permits are not linked to installers.

At a glance

Residential solar installs
133,331
Last 24 months
16,817
Capacity
917.3 MW DC
Median system size
6.2 kW DC
With battery storage
20.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
30.7% where reported
Ownership types recorded
PPA 28,616, lease 7,448, prepaid lease 180, other 1,308
Median battery size
13.5 kWh
Earliest install in data
Mar 30, 1999

Common questions

How many homes in Orange County have solar?

133,331 residential solar systems in Orange County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 16,817 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Orange County?

713 installer names have at least one install interconnected in Orange County in the last 24 months, and 2,891 appear in the full record.

How common are batteries with new solar in Orange County?

20.0% of the solar installs interconnected in Orange County include battery storage across all years, and 75.2% in the last 24 months (11,180 of 14,864). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many solar installs in Orange County are under NEM 3.0?

19,618 of the 133,331 residential solar installs in Orange County (14.7% of the 133,285 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.