Solar installers in Madera County, California
Who installs the most solar in Madera County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Madera County are Sunrun (810), GAF Energy (504) and DICK DONALD P AIR CONDITIONING INC (376). They account for 1,690 of the 4,136 residential solar installs interconnected there in that window.
In all, 18,741 homes in Madera County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 173 installers with installs in this window. 79 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 810 | 2,836 |
| 2 | GAF Energy | 504 | 504 |
| 3 | DICK DONALD P AIR CONDITIONING INC | 376 | 1,092 |
| 4 | Leonard's Roofing, Inc. | 292 | 842 |
| 5 | Citadel Roofing and Solar | 233 | 631 |
| 6 | SOLAR NEGOTIATORS | 195 | 679 |
| 7 | LIFESTYLE SOLAR INC | 181 | 385 |
| 8 | Empower Electric Solar | 164 | 408 |
| 9 | Complete Solar | 133 | 168 |
| 10 | FREEDOM FOREVER LLC | 117 | 411 |
| 11 | BRIGHT OPS | 103 | 117 |
| 12 | SunPower | 68 | 1,118 |
| 13 | Tesla Energy Operations (formerly SolarCity) | 64 | 1,294 |
| 14 | BRIGHTHOUSE LLC | 58 | 60 |
| 15 | LIFESTYLE SOLAR ELECTRIC | 47 | 47 |
| 16 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 43 | 84 |
| 17 | Trinity Power | 36 | 96 |
| 18 | V3 Electric | 29 | 32 |
| 19 | Sbrega Electric | 27 | 106 |
| 20 | SUNNOVA ENERGY CORPORATION | 24 | 26 |
| 21 | TRUE SOLAR & ELECTRIC INC | 20 | 60 |
| 22 | BETTER EARTH ELECTRIC INC | 18 | 71 |
| 23 | SUNMADE SMART ROOFING SOLAR & ELECTRIC | 18 | 21 |
| 24 | MOUNTAIN AIRE HEATING & AIR CONDITIONING INC | 17 | 166 |
| 25 | A & J SOLAR ELECTRIC INC | 16 | 26 |
Most installs, all time
| 1 | Sunrun | 2,836 | 2,836 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,294 | 1,294 |
| 3 | SunPower | 1,118 | 1,118 |
| 4 | DICK DONALD P AIR CONDITIONING INC | 1,092 | 1,092 |
| 5 | Leonard's Roofing, Inc. | 842 | 842 |
| 6 | SOLAR NEGOTIATORS | 679 | 679 |
| 7 | Citadel Roofing and Solar | 631 | 631 |
| 8 | Vivint Solar Developer, LLC | 540 | 540 |
| 9 | GAF Energy | 504 | 504 |
| 10 | FREEDOM FOREVER LLC | 411 | 411 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,440 | 141 |
| 2023 | 2,688 | 261 |
| 2024 | 2,185 | 970 |
| 2025 | 2,047 | 1,311 |
| 2026 (through Aug 31, 2026) | 1,261 | 981 |
Under the Net Billing Tariff (NEM 3.0)
3,193 of the 18,741 residential solar installs in Madera County (17.0% of the 18,738 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Madera County
| 1 | Sunrun | 1,128 | 1,124 | 99.6% |
| 2 | SOLAR NEGOTIATORS | 211 | 210 | 99.5% |
| 3 | Empower Electric Solar | 202 | 195 | 96.5% |
| 4 | GAF Energy | 175 | 175 | 100.0% |
| 5 | BRIGHT OPS | 116 | 102 | 87.9% |
| 6 | FREEDOM FOREVER LLC | 80 | 78 | 97.5% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 79 | 38 | 48.1% |
| 8 | Citadel Roofing and Solar | 61 | 58 | 95.1% |
| 9 | LIFESTYLE SOLAR INC | 54 | 3 | 5.6% |
| 10 | BRIGHTHOUSE LLC | 53 | 50 | 94.3% |
| 11 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 44 | 44 | 100.0% |
| 12 | DICK DONALD P AIR CONDITIONING INC | 39 | 4 | 10.3% |
| 13 | BETTER EARTH ELECTRIC INC | 36 | 34 | 94.4% |
| 14 | Bright Planet Solar | 36 | 6 | 16.7% |
| 15 | GRID Alternatives | 36 | 8 | 22.2% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Madera County
| City | All-time installs |
|---|---|
| Madera | 13,726 |
| Coarsegold | 1,725 |
| Chowchilla | 1,664 |
| Oakhurst | 795 |
| North Fork | 289 |
| Ahwahnee | 191 |
| Raymond | 138 |
| Bass Lake | 66 |
| O Neals | 41 |
| Friant | 27 |
| Firebaugh | 25 |
| Wishon | 14 |
| Auberry | 1 |
ZIP codes in Madera County
ZIP codes with their own page where the utilities recorded Madera County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 93636 | 6,430 | 6,432 | 1,971 |
| 93637 | 3,799 | 3,799 | 592 |
| 93638 | 3,408 | 3,408 | 685 |
| 93614 | 1,724 | 1,725 | 237 |
| 93610 | 1,665 | 1,667 | 320 |
| 93644 | 795 | 795 | 164 |
| 93643 | 289 | 289 | 50 |
| 93601 | 190 | 197 | 29 |
| 93653 | 137 | 143 | 22 |
| 93639 | 87 | 88 | 1 |
| 93604 | 66 | 66 | 8 |
| 93645 | 42 | 42 | 4 |
Equipment recorded
In the last 24 months, 3,946 of Madera County’s 4,136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,903, 48.2%) used modules recorded as Qcells.
In the last 24 months, 4,136 of Madera County’s 4,136 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,958, 47.3%) used inverters recorded as Enphase.
In the last 24 months, 2,167 of Madera County’s 4,136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,298, 59.9%) used batteries recorded as Tesla.
3,054 of 3,809 battery-paired PG&E and SCE installs (80.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,903 | 4,275 |
| JA Solar | 726 | 1,524 | |
| LONGi | 566 | 1,959 | |
| Elin Energy | 153 | not in top list | |
| Trina Solar | 131 | 590 | |
| Inverter maker | Enphase | 1,958 | 7,686 |
| Tesla | 1,683 | 2,201 | |
| SolarEdge | 794 | 5,477 | |
| FranklinWH | 177 | not in top list | |
| SunPower | 80 | 1,771 | |
| Battery maker | Tesla | 1,298 | 1,621 |
| Enphase | 423 | 584 | |
| SolarEdge | 181 | 259 | |
| FranklinWH | 169 | 174 | |
| Lunar Energy | 43 | 43 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 17,183 of 18,741 installs, inverters on 18,741. See the methodology and the equipment index.
SGIP battery storage projects in Madera County
The SGIP public project report downloaded Nov 16, 2026 lists 214 battery storage projects in Madera County with the status Paid, carrying $2,076,690 in current incentive allocations and 3,687 kWh of storage. Across every status it lists 386 storage projects there, 131 of them cancelled and 41 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 214 | 3,687 | $2,076,690 |
| PBI in Process | 7 | 6,994 | $2,173,188 |
| Reserved | 27 | 991 | $1,006,817 |
| Pending Reservation | 2 | 28 | $45,234 |
| Cancelled | 131 | 4,109 | $2,912,473 |
| RRF Rejected | 5 | 70 | $10,771 |
Installers named on the most SGIP storage projects in Madera County
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 108 | 74 |
| RICHARD HEATH & ASSOCIATES INC | 40 | 25 |
| Semper Solaris Construction Inc | 20 | 13 |
| HAVEN ENERGY SERVICES INC | 19 | 9 |
| Infinity Energy, Inc | 18 | 13 |
| PetersenDean | 13 | 10 |
| SOLAR 4 AMERICA | 13 | 10 |
| GRID Alternatives | 12 | 6 |
| A.M. Sun Solar | 10 | 4 |
| AM SUN SOLAR | 10 | 4 |
34 of the 386 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Madera County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Madera County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Madera County
3 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Madera County as the county: 2 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 6 C-10 Electrical licenses in Madera County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Madera County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 18,741
- Last 24 months
- 4,136
- Capacity
- 130.6 MW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 20.3% all time; 65.7% last 24 months
- Third-party owned
- 31.6% where reported
- Ownership types recorded
- PPA 4,530, lease 1,260, prepaid lease 18, other 107
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 11, 2001
Common questions
How many homes in Madera County have solar?
18,741 residential solar systems in Madera County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 4,136 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Madera County?
173 installer names have at least one install interconnected in Madera County in the last 24 months, and 652 appear in the full record.
How common are batteries with new solar in Madera County?
20.3% of the solar installs interconnected in Madera County include battery storage across all years, and 65.7% in the last 24 months (2,716 of 4,136).
How many solar installs in Madera County are under NEM 3.0?
3,193 of the 18,741 residential solar installs in Madera County (17.0% of the 18,738 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.