Solar installers in Madera County, California

Who installs the most solar in Madera County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Madera County are Sunrun (810), GAF Energy (504) and DICK DONALD P AIR CONDITIONING INC (376). They account for 1,690 of the 4,136 residential solar installs interconnected there in that window.

In all, 18,741 homes in Madera County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 173 installers with installs in this window. 79 installs in the window were self-installed or had no installer recorded.

1Sunrun8102,836
2GAF Energy504504
3DICK DONALD P AIR CONDITIONING INC3761,092
4Leonard's Roofing, Inc.292842
5Citadel Roofing and Solar233631
6SOLAR NEGOTIATORS195679
7LIFESTYLE SOLAR INC181385
8Empower Electric Solar164408
9Complete Solar133168
10FREEDOM FOREVER LLC117411
11BRIGHT OPS103117
12SunPower681,118
13Tesla Energy Operations (formerly SolarCity)641,294
14BRIGHTHOUSE LLC5860
15LIFESTYLE SOLAR ELECTRIC4747
16ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING4384
17Trinity Power3696
18V3 Electric2932
19Sbrega Electric27106
20SUNNOVA ENERGY CORPORATION2426
21TRUE SOLAR & ELECTRIC INC2060
22BETTER EARTH ELECTRIC INC1871
23SUNMADE SMART ROOFING SOLAR & ELECTRIC1821
24MOUNTAIN AIRE HEATING & AIR CONDITIONING INC17166
25A & J SOLAR ELECTRIC INC1626

Most installs, all time

1Sunrun2,8362,836
2Tesla Energy Operations (formerly SolarCity)1,2941,294
3SunPower1,1181,118
4DICK DONALD P AIR CONDITIONING INC1,0921,092
5Leonard's Roofing, Inc.842842
6SOLAR NEGOTIATORS679679
7Citadel Roofing and Solar631631
8Vivint Solar Developer, LLC540540
9GAF Energy504504
10FREEDOM FOREVER LLC411411

Installs by year

YearInstalls interconnectedWith battery storage
20222,440141
20232,688261
20242,185970
20252,0471,311
2026 (through Aug 31, 2026)1,261981

Under the Net Billing Tariff (NEM 3.0)

3,193 of the 18,741 residential solar installs in Madera County (17.0% of the 18,738 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Madera County

1Sunrun1,1281,12499.6%
2SOLAR NEGOTIATORS21121099.5%
3Empower Electric Solar20219596.5%
4GAF Energy175175100.0%
5BRIGHT OPS11610287.9%
6FREEDOM FOREVER LLC807897.5%
7Tesla Energy Operations (formerly SolarCity)793848.1%
8Citadel Roofing and Solar615895.1%
9LIFESTYLE SOLAR INC5435.6%
10BRIGHTHOUSE LLC535094.3%
11ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING4444100.0%
12DICK DONALD P AIR CONDITIONING INC39410.3%
13BETTER EARTH ELECTRIC INC363494.4%
14Bright Planet Solar36616.7%
15GRID Alternatives36822.2%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Madera County

CityAll-time installs
Madera13,726
Coarsegold1,725
Chowchilla1,664
Oakhurst795
North Fork289
Ahwahnee191
Raymond138
Bass Lake66
O Neals41
Friant27
Firebaugh25
Wishon14
Auberry1

ZIP codes in Madera County

ZIP codes with their own page where the utilities recorded Madera County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

936366,4306,4321,971
936373,7993,799592
936383,4083,408685
936141,7241,725237
936101,6651,667320
93644795795164
9364328928950
9360119019729
9365313714322
9363987881
9360466668
9364542424

Equipment recorded

In the last 24 months, 3,946 of Madera County’s 4,136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,903, 48.2%) used modules recorded as Qcells.

In the last 24 months, 4,136 of Madera County’s 4,136 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,958, 47.3%) used inverters recorded as Enphase.

In the last 24 months, 2,167 of Madera County’s 4,136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,298, 59.9%) used batteries recorded as Tesla.

3,054 of 3,809 battery-paired PG&E and SCE installs (80.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,9034,275
JA Solar7261,524
LONGi5661,959
Elin Energy153not in top list
Trina Solar131590
Inverter makerEnphase1,9587,686
Tesla1,6832,201
SolarEdge7945,477
FranklinWH177not in top list
SunPower801,771
Battery makerTesla1,2981,621
Enphase423584
SolarEdge181259
FranklinWH169174
Lunar Energy4343

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 17,183 of 18,741 installs, inverters on 18,741. See the methodology and the equipment index.

SGIP battery storage projects in Madera County

The SGIP public project report downloaded Nov 16, 2026 lists 214 battery storage projects in Madera County with the status Paid, carrying $2,076,690 in current incentive allocations and 3,687 kWh of storage. Across every status it lists 386 storage projects there, 131 of them cancelled and 41 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid2143,687$2,076,690
PBI in Process76,994$2,173,188
Reserved27991$1,006,817
Pending Reservation228$45,234
Cancelled1314,109$2,912,473
RRF Rejected570$10,771

Installers named on the most SGIP storage projects in Madera County

InstallerProjectsPaid
Sunrun10874
RICHARD HEATH & ASSOCIATES INC4025
Semper Solaris Construction Inc2013
HAVEN ENERGY SERVICES INC199
Infinity Energy, Inc1813
PetersenDean1310
SOLAR 4 AMERICA1310
GRID Alternatives126
A.M. Sun Solar104
AM SUN SOLAR104

34 of the 386 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Madera County (EIA)

EIA’s 2025 Service Territory file lists 3 utilities serving Madera County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848

Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in Madera County

3 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Madera County as the county: 2 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 6 C-10 Electrical licenses in Madera County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Madera County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
18,741
Last 24 months
4,136
Capacity
130.6 MW DC
Median system size
5.9 kW DC
With battery storage
20.3% all time; 65.7% last 24 months
Third-party owned
31.6% where reported
Ownership types recorded
PPA 4,530, lease 1,260, prepaid lease 18, other 107
Median battery size
13.5 kWh
Earliest install in data
Jun 11, 2001

Common questions

How many homes in Madera County have solar?

18,741 residential solar systems in Madera County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 4,136 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Madera County?

173 installer names have at least one install interconnected in Madera County in the last 24 months, and 652 appear in the full record.

How common are batteries with new solar in Madera County?

20.3% of the solar installs interconnected in Madera County include battery storage across all years, and 65.7% in the last 24 months (2,716 of 4,136).

How many solar installs in Madera County are under NEM 3.0?

3,193 of the 18,741 residential solar installs in Madera County (17.0% of the 18,738 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.