Solar installers in San Bernardino County, California
Who installs the most solar in San Bernardino County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in San Bernardino County are Sunrun (5,910), BRIGHT OPS (1,330) and SunPower (1,172). They account for 8,412 of the 22,631 residential solar installs interconnected there in that window.
In all, 146,049 homes in San Bernardino County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 536 installers with installs in this window. 418 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 5,910 | 18,682 |
| 2 | BRIGHT OPS | 1,330 | 1,724 |
| 3 | SunPower | 1,172 | 11,519 |
| 4 | GAF Energy | 1,150 | 1,161 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 874 | 11,076 |
| 6 | SUNNOVA ENERGY CORPORATION | 824 | 4,421 |
| 7 | V3 Electric | 762 | 3,056 |
| 8 | FREEDOM FOREVER LLC | 754 | 4,780 |
| 9 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 513 | 713 |
| 10 | Complete Solar | 410 | 1,953 |
| 11 | EXO Energy | 350 | 719 |
| 12 | Current Home | 314 | 1,414 |
| 13 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 292 | 2,821 |
| 14 | Option One Solar | 286 | 1,221 |
| 15 | BRYTON POWER LLC | 270 | 320 |
| 16 | SOLARA HOME ENERGY LLC | 269 | 269 |
| 17 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 240 | 240 |
| 18 | SolarMax Renewable Energy Provider, Inc | 237 | 2,186 |
| 19 | BETTER EARTH ELECTRIC INC | 230 | 1,240 |
| 20 | APOLLO HOME POWER LLC | 172 | 172 |
| 21 | GRID Alternatives | 148 | 1,015 |
| 22 | SUNFORCE ENERGY SOLUTIONS | 143 | 279 |
| 23 | LUXOR ENERGY INC | 126 | 168 |
| 24 | Powur PBC (Powur Home) | 124 | 965 |
| 25 | MARS BUILDER SOLUTIONS | 119 | 119 |
Most installs, all time
| 1 | Sunrun | 18,682 | 18,682 |
| 2 | SunPower | 11,519 | 11,519 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 11,076 | 11,076 |
| 4 | Vivint Solar Developer, LLC | 5,903 | 5,903 |
| 5 | FREEDOM FOREVER LLC | 4,780 | 4,780 |
| 6 | SUNNOVA ENERGY CORPORATION | 4,421 | 4,421 |
| 7 | SunStreet Energy Group LLC | 4,120 | 4,120 |
| 8 | Bright Planet Solar | 3,286 | 3,286 |
| 9 | Horizon Solar Power | 3,166 | 3,166 |
| 10 | V3 Electric | 3,056 | 3,056 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 20,511 | 1,731 |
| 2023 | 21,404 | 2,981 |
| 2024 | 13,689 | 8,287 |
| 2025 | 11,159 | 8,367 |
| 2026 (through Aug 31, 2026) | 7,232 | 5,549 |
Under the Net Billing Tariff (NEM 3.0)
29,597 of the 146,049 residential solar installs in San Bernardino County (20.3% of the 146,049 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.1% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in San Bernardino County
| 1 | Sunrun | 7,350 | 6,216 | 84.6% |
| 2 | BRIGHT OPS | 1,724 | 1,597 | 92.6% |
| 3 | SUNNOVA ENERGY CORPORATION | 1,463 | 1,034 | 70.7% |
| 4 | FREEDOM FOREVER LLC | 1,251 | 1,194 | 95.4% |
| 5 | GAF Energy | 1,152 | 1,140 | 99.0% |
| 6 | SunPower | 1,071 | 265 | 24.7% |
| 7 | V3 Electric | 1,041 | 1,018 | 97.8% |
| 8 | Tesla Energy Operations (formerly SolarCity) | 959 | 887 | 92.5% |
| 9 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 664 | 317 | 47.7% |
| 10 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 506 | 446 | 88.1% |
| 11 | Bright Planet Solar | 499 | 194 | 38.9% |
| 12 | BETTER EARTH ELECTRIC INC | 492 | 466 | 94.7% |
| 13 | EXO Energy | 479 | 357 | 74.5% |
| 14 | Current Home | 417 | 409 | 98.1% |
| 15 | Complete Solar | 404 | 121 | 30.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in San Bernardino County
| City | All-time installs |
|---|---|
| Fontana | 17,898 |
| Ontario | 13,496 |
| Victorville | 13,391 |
| San Bernardino | 11,413 |
| Apple Valley | 8,778 |
| Hesperia | 8,175 |
| Chino | 8,068 |
| Rialto | 6,645 |
| Rancho Cucamonga | 6,453 |
| Redlands | 5,950 |
| Chino Hills | 4,826 |
| Upland | 4,733 |
| Yucaipa | 4,524 |
| Highland | 4,311 |
| Alta Loma | 3,761 |
| Yucca Valley | 3,088 |
| Adelanto | 2,767 |
| Barstow | 2,068 |
| Twentynine Palms | 1,906 |
| Loma Linda | 1,639 |
ZIP codes in San Bernardino County
ZIP codes with their own page where the utilities recorded San Bernardino County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92336 | 12,590 | 12,593 | 1,746 |
| 92392 | 7,219 | 7,229 | 944 |
| 91761 | 7,063 | 7,070 | 1,494 |
| 92345 | 6,834 | 6,840 | 1,228 |
| 92407 | 4,983 | 4,987 | 616 |
| 91709 | 4,823 | 4,829 | 763 |
| 91710 | 4,789 | 4,794 | 542 |
| 92307 | 4,655 | 4,656 | 615 |
| 92399 | 4,514 | 4,518 | 594 |
| 91762 | 4,484 | 4,488 | 788 |
| 92346 | 4,307 | 4,311 | 713 |
| 92376 | 4,162 | 4,163 | 730 |
| 92308 | 4,111 | 4,112 | 579 |
| 92374 | 3,530 | 3,543 | 546 |
| 91739 | 3,464 | 3,467 | 384 |
| 92394 | 3,322 | 3,325 | 414 |
| 91708 | 3,307 | 3,308 | 717 |
| 92335 | 3,119 | 3,127 | 491 |
| 92284 | 3,049 | 3,056 | 482 |
| 92301 | 2,833 | 2,836 | 341 |
| 92395 | 2,769 | 2,777 | 478 |
| 92404 | 2,727 | 2,728 | 462 |
| 91701 | 2,713 | 2,719 | 329 |
| 91784 | 2,564 | 2,565 | 281 |
| 92373 | 2,539 | 2,541 | 385 |
| 91730 | 2,499 | 2,502 | 331 |
| 92377 | 2,489 | 2,494 | 529 |
| 92344 | 2,238 | 2,239 | 470 |
| 91786 | 2,158 | 2,166 | 314 |
| 92311 | 2,067 | 2,067 | 330 |
| 92337 | 2,049 | 2,054 | 257 |
| 92277 | 1,902 | 1,905 | 301 |
| 91737 | 1,896 | 1,897 | 211 |
| 91764 | 1,812 | 1,816 | 390 |
| 92371 | 1,613 | 1,616 | 226 |
| 92354 | 1,396 | 1,398 | 250 |
| 92252 | 1,222 | 1,228 | 219 |
| 92410 | 1,108 | 1,109 | 282 |
| 91763 | 1,099 | 1,099 | 167 |
| 92405 | 1,095 | 1,095 | 196 |
| 92316 | 1,057 | 1,058 | 152 |
| 92342 | 1,027 | 1,027 | 162 |
| 92411 | 946 | 946 | 232 |
| 92313 | 880 | 880 | 145 |
| 92359 | 597 | 599 | 67 |
| 92408 | 514 | 514 | 65 |
| 92372 | 482 | 483 | 79 |
| 92356 | 433 | 434 | 76 |
| 92256 | 367 | 370 | 68 |
| 92324 | 278 | 282 | 36 |
| 92352 | 253 | 255 | 72 |
| 92285 | 200 | 201 | 37 |
| 92365 | 177 | 179 | 18 |
| 92397 | 155 | 155 | 25 |
| 92325 | 146 | 147 | 34 |
| 92363 | 120 | 120 | 3 |
| 92382 | 107 | 107 | 35 |
| 92398 | 98 | 98 | 14 |
| 92268 | 92 | 92 | 18 |
| 93562 | 78 | 78 | 7 |
| 92318 | 66 | 66 | 4 |
| 91758 | 48 | 48 | 0 |
| 92340 | 46 | 46 | 26 |
| 92358 | 44 | 44 | 12 |
| 92368 | 40 | 40 | 9 |
| 91729 | 29 | 29 | 0 |
| 92391 | 28 | 39 | 7 |
| 92347 | 26 | 28 | 3 |
| 92236 | 24 | 25 | 0 |
Equipment recorded
In the last 24 months, 22,488 of San Bernardino County’s 22,631 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10,136, 45.1%) used modules recorded as Qcells.
In the last 24 months, 22,631 of San Bernardino County’s 22,631 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (10,537, 46.6%) used inverters recorded as Enphase.
In the last 24 months, 16,696 of San Bernardino County’s 22,631 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9,777, 58.6%) used batteries recorded as Tesla.
28,597 of 29,518 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 10,136 | 35,950 |
| LONGi | 2,996 | 11,270 | |
| JA Solar | 2,881 | 7,948 | |
| Canadian Solar | 1,561 | 10,494 | |
| Silfab | 1,000 | not in top list | |
| Inverter maker | Enphase | 10,537 | 54,770 |
| Tesla | 7,746 | 10,492 | |
| SolarEdge | 4,886 | 48,056 | |
| Delta Electronics | 299 | 2,575 | |
| ABB | 250 | 7,153 | |
| Battery maker | Tesla | 9,777 | 14,391 |
| Enphase | 3,680 | 5,699 | |
| SolarEdge | 2,038 | 3,937 | |
| FranklinWH | 791 | 939 | |
| LG | 163 | 2,744 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 125,919 of 146,049 installs, inverters on 145,993. See the methodology and the equipment index.
SGIP battery storage projects in San Bernardino County
The SGIP public project report downloaded Nov 16, 2026 lists 1,970 battery storage projects in San Bernardino County with the status Paid, carrying $40,763,806 in current incentive allocations and 75,109 kWh of storage. Across every status it lists 4,336 storage projects there, 1,180 of them cancelled and 1,186 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1,970 | 75,109 | $40,763,806 |
| PBI in Process | 34 | 58,621 | $31,937,340 |
| Reserved | 537 | 36,449 | $14,176,645 |
| Pending Reservation | 124 | 2,404 | $3,293,681 |
| Waitlist | 421 | 6,308 | $9,438,449 |
| Cancelled | 1,180 | 184,195 | $84,984,320 |
| RRF Rejected | 70 | 6,863 | $1,368,192 |
Installers named on the most SGIP storage projects in San Bernardino County
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 615 | 293 |
| APOLLO HOME POWER LLC | 421 | 83 |
| Semper Solaris Construction Inc | 355 | 274 |
| SolarMax Renewable Energy Provider, Inc | 355 | 181 |
| HAVEN ENERGY SERVICES INC | 212 | 41 |
| V3 Electric | 165 | 102 |
| SunPower | 161 | 75 |
| Tesla Energy Operations (formerly SolarCity) | 130 | 123 |
| Solar Optimum Inc. | 120 | 72 |
| Tesla | 105 | 74 |
551 of the 4,336 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving San Bernardino County (EIA)
EIA’s 2025 Service Territory file lists 11 utilities serving San Bernardino County. 4 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
| City of Colton - (CA) | Municipal | 1,282 | 1,211 | 22.03 | AC | 26 |
| Bear Valley Electric Service | Investor Owned | 703 | 678 | 6.519 | DC | 0 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Aha Macav Power Service; City of Needles - (CA); City of Victorville - (CA); Colorado River Indian Irr Proj; DOD USMC Marine Air Ground Combat; Rancho Cucamonga Municipal Utility; WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
San Bernardino County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in San Bernardino County
40 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list San Bernardino County as the county: 25 with the business type Corporation, Limited Liability, Partnership or JointVenture and 15 Sole Owner. 50 C-10 Electrical licenses in San Bernardino County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in San Bernardino County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 146,049
- Last 24 months
- 22,631
- Capacity
- 974.4 MW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 20.2% all time; 75.3% last 24 months
- Third-party owned
- 48.2% where reported
- Ownership types recorded
- PPA 49,650, lease 13,526, prepaid lease 154, other 2,933
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 9, 1999
Common questions
How many homes in San Bernardino County have solar?
146,049 residential solar systems in San Bernardino County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 22,631 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in San Bernardino County?
536 installer names have at least one install interconnected in San Bernardino County in the last 24 months, and 2,261 appear in the full record.
How common are batteries with new solar in San Bernardino County?
20.2% of the solar installs interconnected in San Bernardino County include battery storage across all years, and 75.3% in the last 24 months (17,033 of 22,631).
How many solar installs in San Bernardino County are under NEM 3.0?
29,597 of the 146,049 residential solar installs in San Bernardino County (20.3% of the 146,049 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.