SunPower

How many solar installs has SunPower done in California, and which license number is on its installs?

SunPower has 119,561 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Jul 23, 2007 to Aug 31, 2026), most of them in Riverside County (23,523), Los Angeles County (13,169) and San Diego County (11,777). The license number recorded on most of its installs, 890895, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 961988 (SUNPOWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2027, recorded on 2,128 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to SunPower here carry more than one CSLB license number: 890895 on 114,273 (not found in the CSLB License Master file) and 961988 on 2,128 (CSLB holder SUNPOWER, Orem), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
119,561
Last 24 months
7,474
Total capacity
549,750.1 kW DC
Median system size
4 kW DC
With battery storage
6.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 12.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
21.2% of 113,001 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7,634 installs, latest Aug 31, 2026
Ownership types recorded
PPA 989, lease 22,948, prepaid lease 7, other 31
Median battery size
13 kWh (3,296 installs list a capacity)
First install
Jul 23, 2007
Latest install
Aug 31, 2026
Counties
44
Utilities
SCE 61,664, PGE 45,098, SDGE 12,799
CSLB license
890895, 961988

Is SunPower still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (2,144 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
2007820
20084790
20094900
20105040
20116370
20121,5010
20132,4830
20141,9331
20151,9410
20162,5030
20173,5702
20186,7491
20197,0061
20209,95312
202115,029517
202221,7621,218
202323,3771,954
202414,6372,471
20253,467349
2026 (through Aug 31, 2026)1,458259

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7,634 of its 119,561 interconnected installs (6.4% of the 119,561 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 39.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013,13511.0%not counted
NEM 2.098,79282.6%4,205 (4.8%)
Net Billing Tariff7,6346.4%2,574 (39.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 23,975 of SunPower’s installs the utility recorded a third-party ownership type: PPA 989, lease 22,948, prepaid lease 7, other 31. Across all installers, 19,019 residential systems list a third-party owner name that matches SunPower exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower LLC9,993
KB Home3,051
DR Horton1,410
Woodside Homes1,155
SunPower Capital, LLC1,096

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7,326 of SunPower’s 7,474 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6,544, 89.3%) used modules recorded as Qcells.

In the last 24 months, 7,474 of SunPower’s 7,474 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6,605, 88.4%) used inverters recorded as Enphase.

In the last 24 months, 775 of SunPower’s 7,474 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (518, 66.8%) used batteries recorded as Enphase.

6,353 of 6,785 battery-paired PG&E and SCE installs (93.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6,54417,807
SunPower40184,891
Waaree1185,316
JA Solar80not in top list
SEG Solar78not in top list
Inverter makerEnphase6,60532,902
SunPower45662,723
SolarEdge37513,757
Tesla72not in top list
Astronergy (Chint)15not in top list
Battery makerEnphase518583
SunPower2315,686
Tesla1937
LG542
FranklinWH1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 110,101 of 119,561 installs, inverters on 119,186. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SunPower as developer on 3,589 battery storage projects and as installer on 3,545 (3,527 name it as both), 3,607 projects in all with 211,186 kWh of storage. 2,001 have the status Paid, with $9,566,621 in current incentive allocations. Applications were received from May 22, 2014 to Dec 15, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,00137,402$9,566,621
PBI in Process2035,597$9,956,454
Reserved50810,008$3,313,774
Pending Reservation26341$60,982
Cancelled1,007127,277$67,349,490
RRF Rejected45561$105,276

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2,99336,925$5,853,2541,796$3,536,917
Large-Scale Storage40887,537$16,341,532133$3,687,256
Equity Resiliency10518,956$16,636,42261$956,559
Non-Residential Storage Equity4064,491$49,534,9720$0
Residential Storage Equity111$9,7271$9,727
Not stated603,266$1,976,68910$1,376,162

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
890895Not found in the CSLB License Master file pulled Nov 4, 2026114,273
961988SUNPOWER (Corporation)CLEAR, Pending Case/CITC-10 Electrical Contractor; C-46 Solar ContractorJun 10, 2011Oct 31, 20272,128

License numbers are the ones the utilities recorded on the interconnection applications (116,488 of 119,561 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 961988. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SunPower’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232024Total
City and County of San Francisco89089520213633570
unincorporated San Diego County8908954722563344195676071372,792
unincorporated Marin County89089552231300043

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside23,523
Los Angeles13,169
San Diego11,777
San Bernardino11,519
Orange9,539
Alameda6,022
Contra Costa5,670
Santa Clara5,571
San Joaquin4,993
Fresno3,876
Solano3,604
Placer3,040
Ventura2,124
Tulare1,804
Yolo1,615
Kern1,357
Sonoma1,180
San Mateo1,151
El Dorado1,133
Madera1,118
San Benito967
Santa Barbara784
Marin548
Yuba474
Monterey459
Napa400
San Francisco372
Kings326
San Luis Obispo282
Santa Cruz251
Amador181
Butte176
Sutter156
Merced134
Calaveras101
Stanislaus98
Nevada20
Lake17
Tuolumne9
Colusa8
Glenn4
Mendocino4
Sacramento4
Mariposa1

Top cities

CityInstalls
Menifee3,526
Ontario3,485
San Diego3,101
Irvine3,022
Santa Clarita2,872
San Jose2,472
Winchester2,386
Fresno2,259
Riverside2,192
Victorville2,174
Manteca2,171
Lake Elsinore2,030
Beaumont2,024
Corona1,909
Murrieta1,841

Names as recorded by the utilities

The utilities recorded this installer under 21 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNPOWER CORPORATION SYSTEMS77,808
SunPower Corporation28,856
SUNPOWER6,064
Sunpower Corporation1,685
SunPower Corporation, Systems1,362
SunPower Corporation, Systems - Lori1,033
SunPower928
SUNPOWER CORPORATION784
SunPower Corporation Systems665
Sunpower Corporation Systems227
Sunpower Corp62
SunPower Corp29
Sunpower26
SUNPOWER CORP21
sunpower3
SunPower Corp.3
Sunpower Corp.1
Sunpower Corporation Systems.1
SunPower Corporation Systems.1
SunPower Corporation, Inc.1
Sunpower Corporation, Systems1

Common questions

Where does SunPower install solar?

Its installs are spread across 44 counties. The most are in Riverside County (23,523 installs), followed by Los Angeles County (13,169).

How often does SunPower install batteries with solar?

6.4% of its interconnected solar installs include battery storage across all years, and 12.7% in the last 24 months (792 of 6,219). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SunPower installs are under NEM 3.0 (the Net Billing Tariff)?

7,634 of its 119,561 interconnected installs (6.4% of the 119,561 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 39.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.