Powur PBC (Powur Home)

How many solar installs has Powur PBC (Powur Home) done in California, and which license number is on its installs?

Powur PBC (Powur Home) has 7,373 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Apr 24, 2020 to Aug 28, 2026), most of them in Los Angeles County (1,438), San Diego County (1,142) and San Bernardino County (965). CSLB lists license 1060243 (POWUR HOME CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
7,373
Last 24 months
907
Total capacity
66,738.5 kW DC
Median system size
8.3 kW DC
With battery storage
18.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 85.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
6.7% of 7,373 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1,030 installs, latest Aug 28, 2026
Ownership types recorded
PPA 202, lease 292
Median battery size
13.5 kWh (1,015 installs list a capacity)
First install
Apr 24, 2020
Latest install
Aug 28, 2026
Counties
49
Utilities
SCE 4,211, PGE 1,936, SDGE 1,226
CSLB license
1060243

Is Powur PBC (Powur Home) still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (448 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202050
2021787
20221,52786
20234,090195
2024913324
2025471316
2026 (through Aug 31, 2026)289235

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1,030 of its 7,373 interconnected installs (14.0% of the 7,373 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.0%not counted
NEM 2.06,34186.0%382 (7.2%)
Net Billing Tariff1,03014.0%781 (92.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 494 of Powur PBC (Powur Home)’s installs the utility recorded a third-party ownership type: PPA 202, lease 292, prepaid lease 0, other 0. Across all installers, 505 residential systems list a third-party owner name that matches Powur PBC (Powur Home) exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Powur PBC454
Sunnova17
Powur home3
Myers Electric2
Infinity Energy Inc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 888 of Powur PBC (Powur Home)’s 907 installs name a module maker in the “Generator Manufacturer” fields, and most of those (533, 60.0%) used modules recorded as Qcells.

In the last 24 months, 907 of Powur PBC (Powur Home)’s 907 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (497, 54.8%) used inverters recorded as Tesla.

In the last 24 months, 637 of Powur PBC (Powur Home)’s 907 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (401, 63.0%) used batteries recorded as Tesla.

1,110 of 1,163 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5334,656
JinkoSolar209227
REC951,417
JA Solar29not in top list
Canadian Solar11529
Inverter makerTesla497648
Enphase3084,057
SolarEdge1152,204
SunPower11366
ABB4not in top list
Battery makerTesla401418
Enphase125437
FranklinWH56108
SolarEdge55137
SunPower2not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,023 of 7,373 installs, inverters on 7,373. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Powur PBC (Powur Home) as developer on 429 battery storage projects and as installer on 377 (375 name it as both), 431 projects in all with 5,933 kWh of storage. 271 have the status Paid, with $734,480 in current incentive allocations. Applications were received from Sep 28, 2020 to Mar 4, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2713,565$734,480
Reserved14277$38,711
Pending Reservation126$37,305
Waitlist479$122,367
Cancelled1201,749$452,451
RRF Rejected21237$33,425

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage3644,602$687,105250$442,000
Large-Scale Storage20528$121,2199$48,382
Equity Resiliency17408$372,40610$210,098
Residential Solar and Storage Equity - AB 209 Non-POU479$120,8260$0
Residential Storage Equity453$44,9122$34,000
Residential Solar and Storage Equity - AB 209126$38,8450$0
Not stated21237$33,4250$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1060243POWUR HOME CONSTRUCTION (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical ContractorNov 12, 2019Nov 30, 20277,368

License numbers are the ones the utilities recorded on the interconnection applications (7,373 of 7,373 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1060243. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Powur PBC (Powur Home)’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023202420252026Total
City and County of San Francisco1060243141792033
unincorporated San Diego County1060243343931805162

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles1,438
San Diego1,142
San Bernardino965
Riverside898
Orange576
Fresno231
Ventura213
Contra Costa187
Santa Clara181
San Joaquin144
Alameda141
Sutter114
Tulare112
Kern106
Sonoma105
Merced80
Solano72
San Luis Obispo61
Santa Barbara53
Placer47
San Mateo46
San Francisco44
Madera41
Kings40
Napa33
Lake30
Marin30
El Dorado26
Yolo26
Butte21
Mendocino20
Monterey20
Nevada20
Tehama15
Yuba15
Santa Cruz13
Glenn12
Stanislaus10
San Benito9
Shasta9
Calaveras6
Mariposa6
Humboldt5
Amador4
Tuolumne2
Colusa1
Inyo1
Plumas1
Sacramento1

Top cities

CityInstalls
San Diego336
Fresno130
San Jose118
Yuba City107
Fontana106
Corona100
Murrieta95
Menifee86
Oceanside85
San Bernardino80
Stockton78
Moreno Valley76
Carlsbad75
Chula Vista75
Temecula75

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POWUR PBC WHICH WILL DO BUSINESS IN CALIFORNIA AS POWUR HOME3,324
POWUR P B C WHICH WILL DO BUSINESS IN CALIFORNIA AS POWUR HOME1,962
POWUR P B C WHICH WILL DO BUSINESS IN CALIFORNIA A1,217
POWUR PBC DBA POWUR HOME CONSTRUCTION852
Powur10
POWUR-PBC-DBA-POWUR-HOME-CONSTRUCTION4
Powur, PBC2
Powur PBC1
POWUR-PBC-WHICH-WILL-DO-BUSINESS-IN-CALIFORNIA-AS-POWUR-HOME1

Common questions

Where does Powur PBC (Powur Home) install solar?

Its installs are spread across 49 counties. The most are in Los Angeles County (1,438 installs), followed by San Diego County (1,142).

How often does Powur PBC (Powur Home) install batteries with solar?

18.9% of its interconnected solar installs include battery storage across all years, and 85.6% in the last 24 months (640 of 748). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Powur PBC (Powur Home) installs are under NEM 3.0 (the Net Billing Tariff)?

1,030 of its 7,373 interconnected installs (14.0% of the 7,373 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.