Infinity Energy, Inc

How many solar installs has Infinity Energy, Inc done in California, and which license number is on its installs?

Infinity Energy, Inc has 22,317 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Feb 11, 2015 to Aug 17, 2026), most of them in Kern County (3,534), Fresno County (2,869) and San Diego County (2,477). The license number recorded on most of its installs, 998627, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
22,317
Last 24 months
880
Total capacity
154,668.7 kW DC
Median system size
6.3 kW DC
With battery storage
8.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 38.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
40.5% of 22,316 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
615 installs, latest Jul 8, 2026
Ownership types recorded
PPA 6,969, lease 994, prepaid lease 73, other 1,009
Median battery size
13.5 kWh (447 installs list a capacity)
First install
Feb 11, 2015
Latest install
Aug 17, 2026
Counties
50
Utilities
PGE 15,052, SCE 4,701, SDGE 2,564
CSLB license
998627

Is Infinity Energy, Inc still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (50 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
20152360
20163920
20171,0650
20181,8160
20191,88721
20202,167197
20212,792223
20224,651328
20234,906342
20242,086518
202528658
2026 (through Aug 31, 2026)335

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

615 of its 22,317 interconnected installs (2.8% of the 22,317 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08393.8%not counted
NEM 2.020,86393.5%1,401 (7.6%)
Net Billing Tariff6152.8%252 (46.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9,045 of Infinity Energy, Inc’s installs the utility recorded a third-party ownership type: PPA 6,969, lease 994, prepaid lease 73, other 1,009. Across all installers, 51 residential systems list a third-party owner name that matches Infinity Energy, Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova3,856
Lennar2,304
SUNRUN1,693
Sunnova Energy Corporation610
Pulte202

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 849 of Infinity Energy, Inc’s 880 installs name a module maker in the “Generator Manufacturer” fields, and most of those (758, 89.3%) used modules recorded as Qcells.

In the last 24 months, 880 of Infinity Energy, Inc’s 880 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (836, 95.0%) used inverters recorded as Enphase.

In the last 24 months, 327 of Infinity Energy, Inc’s 880 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (255, 78.0%) used batteries recorded as Tesla.

1,444 of 1,692 battery-paired PG&E and SCE installs (85.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells7589,706
REC30938
LONGi266,404
Canadian Solar24539
VSUN (Vietnam Sunergy)4not in top list
Inverter makerEnphase83617,008
Tesla2581,000
SolarEdge384,633
FranklinWH24not in top list
SMA5322
Battery makerTesla255870
Enphase46498
FranklinWH2426
Generac137
SunPower1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20,316 of 22,317 installs, inverters on 22,316. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Infinity Energy, Inc as developer on 2,800 battery storage projects and as installer on 2,767 (2,748 name it as both), 2,819 projects in all with 62,055 kWh of storage. 1,676 have the status Paid, with $20,324,220 in current incentive allocations. Applications were received from Jul 17, 2018 to Aug 21, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1,67636,805$20,324,220
Reserved7139$36,334
Pending Reservation126$19,460
Cancelled97822,769$13,587,097
RRF Rejected1572,316$379,889

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1,59225,288$4,448,0971,050$3,016,121
Equity Resiliency90528,428$27,861,372555$16,517,752
Large-Scale Storage1626,007$1,645,33471$790,347
Residential Storage Equity316$12,3090$0
Not stated1572,316$379,8890$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998627Not found in the CSLB License Master file pulled Nov 4, 202620,524

License numbers are the ones the utilities recorded on the interconnection applications (20,636 of 22,317 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Infinity Energy, Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
City and County of San Francisco9986272112772251
unincorporated San Diego County9986275445955988111452
unincorporated Marin County9986270013004

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern3,534
Fresno2,869
San Diego2,477
Riverside1,893
San Joaquin1,510
Alameda1,028
San Bernardino784
Placer765
Santa Clara689
Los Angeles669
Contra Costa666
Yuba624
Tulare465
Kings386
Sutter383
Merced366
Madera353
Orange325
Solano236
Ventura229
Butte222
Sonoma166
San Benito145
El Dorado144
San Mateo123
Yolo113
Lake111
Shasta105
Monterey92
Santa Cruz88
Nevada87
Stanislaus76
Tehama66
Calaveras56
San Luis Obispo48
Amador45
Marin45
Glenn43
San Francisco43
Napa42
Tuolumne42
Mendocino41
Santa Barbara36
Colusa28
Humboldt22
Mariposa16
Sacramento14
Plumas4
Lassen2
Inyo1

Top cities

CityInstalls
Bakersfield2,550
Fresno1,872
San Diego844
Stockton617
Clovis588
Tracy515
San Jose481
Newark460
Lincoln353
Chula Vista340
Yuba City297
Shafter287
Plumas Lake268
Madera263
Dublin239

Names as recorded by the utilities

The utilities recorded this installer under 24 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INFINITY ENERGY INC12,854
INFINITY ENERGY3,021
Infinity Energy, Inc2,647
Infinity Energy1,671
INFINITY ENERGY, INC.1,123
Infinity Energy Inc235
Infinity Energy, INC.203
Infinity Energy, INC182
Infinity Energy Inc.180
Infinity Energy INC.157
INFINITY ENERGY INC.14
Infinity Energy, Inc.8
Infinity energy7
INFINITY ENERGY, INC3
Infinity Energy , Inc2
Infinity energy Inc.2
infinity Energy1
iNFINITY ENERGY1
Infinity ENergy1
Infinity energy Inc1
infinity energy Inc.1
infinity Energy Inc.1
Infinity Energy inc.1
INFINITY-ENERGY1

Common questions

Where does Infinity Energy, Inc install solar?

Its installs are spread across 50 counties. The most are in Kern County (3,534 installs), followed by Fresno County (2,869).

How often does Infinity Energy, Inc install batteries with solar?

8.6% of its interconnected solar installs include battery storage across all years, and 38.8% in the last 24 months (334 of 860). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Infinity Energy, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

615 of its 22,317 interconnected installs (2.8% of the 22,317 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.