Solar installers in Madera, California

Most installs here are in Madera County.

Who installs the most solar in Madera?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Madera are Sunrun (557), GAF Energy (486) and DICK DONALD P AIR CONDITIONING INC (354). They account for 1,397 of the 3,248 residential solar installs interconnected there in that window.

In all, 13,726 homes in Madera have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 138 installers with installs in this window. 43 installs in the window were self-installed or had no installer recorded.

1Sunrun5571,848
2GAF Energy486486
3DICK DONALD P AIR CONDITIONING INC3541,044
4Leonard's Roofing, Inc.292842
5Citadel Roofing and Solar177575
6LIFESTYLE SOLAR INC164360
7SOLAR NEGOTIATORS131430
8Empower Electric Solar129314
9Complete Solar127153
10FREEDOM FOREVER LLC90301
11SunPower631,090
12BRIGHT OPS5162
13Tesla Energy Operations (formerly SolarCity)49919
14LIFESTYLE SOLAR ELECTRIC4242
15ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING3659
16BRIGHTHOUSE LLC3537
17Trinity Power3571
18V3 Electric2729
19SUNNOVA ENERGY CORPORATION2426
20TRUE SOLAR & ELECTRIC INC1651
21BETTER EARTH ELECTRIC INC1455
22Evans Energy1199
23GRID Alternatives10137
24PACIFIC SOLAR1033
25A & J SOLAR ELECTRIC INC915

Most installs, all time

1Sunrun1,8481,848
2SunPower1,0901,090
3DICK DONALD P AIR CONDITIONING INC1,0441,044
4Tesla Energy Operations (formerly SolarCity)919919
5Leonard's Roofing, Inc.842842
6Citadel Roofing and Solar575575
7GAF Energy486486
8Vivint Solar Developer, LLC454454
9SOLAR NEGOTIATORS430430
10LIFESTYLE SOLAR INC360360

Installs by year

YearInstalls interconnectedWith battery storage
20221,77948
20231,852113
20241,779667
20251,594919
2026 (through Aug 31, 2026)956730

Under the Net Billing Tariff (NEM 3.0)

2,077 of the 13,726 residential solar installs in Madera (15.1% of the 13,725 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Madera

1Sunrun71471299.7%
2GAF Energy165165100.0%
3Empower Electric Solar15314896.7%
4SOLAR NEGOTIATORS13713699.3%
5BRIGHT OPS614878.7%
6Tesla Energy Operations (formerly SolarCity)582136.2%
7FREEDOM FOREVER LLC4545100.0%
8ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING3737100.0%
9LIFESTYLE SOLAR INC3738.1%
10BRIGHTHOUSE LLC333297.0%
11GRID Alternatives31516.1%
12BETTER EARTH ELECTRIC INC2828100.0%
13DICK DONALD P AIR CONDITIONING INC28414.3%
14TRUE SOLAR & ELECTRIC INC2600.0%
15Bright Planet Solar2229.1%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 3,099 of Madera’s 3,248 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,639, 52.9%) used modules recorded as Qcells.

In the last 24 months, 3,248 of Madera’s 3,248 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,688, 52.0%) used inverters recorded as Enphase.

In the last 24 months, 1,598 of Madera’s 3,248 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (982, 61.5%) used batteries recorded as Tesla.

2,036 of 2,535 battery-paired PG&E and SCE installs (80.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,6393,356
JA Solar513983
LONGi4531,538
Trina Solar114436
Elin Energy101not in top list
Inverter makerEnphase1,6886,057
Tesla1,2521,547
SolarEdge5963,792
FranklinWH145not in top list
SunPower661,405
Battery makerTesla9821,125
Enphase305398
FranklinWH139142
SolarEdge105151
Lunar Energy3232

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 12,530 of 13,726 installs, inverters on 13,726. See the methodology and the equipment index.

ZIP codes in Madera

ZIP codes with their own page where the utilities recorded Madera on at least 10% of the ZIP’s installs, through Aug 31, 2026.

936366,4306,4321,971
936373,7993,799592
936383,4073,408685
9363987881

SGIP battery storage projects in Madera

The SGIP report lists 124 battery storage projects with the city Madera, 64 with the status Paid ($461,615 in current incentive allocations, 770 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid64770$461,615
PBI in Process56,178$1,694,658
Reserved13350$291,564
Pending Reservation115$16,765
Cancelled381,370$875,141
RRF Rejected352$7,804

Installers named on the most SGIP storage projects in Madera

InstallerProjectsPaid
Sunrun3225
HAVEN ENERGY SERVICES INC138
GRID Alternatives83
PetersenDean86
SOLAR 4 AMERICA86
Infinity Energy, Inc76
Vivint Solar Developer, LLC60
FREEDOM FOREVER LLC44
RICHARD HEATH & ASSOCIATES INC44
LA Solar Group31

13 of the 124 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Madera is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
13,726
Last 24 months
3,248
Capacity
90.9 MW DC
Median system size
5.4 kW DC
With battery storage
18.5% all time; 60.7% last 24 months
Third-party owned
32.8% where reported
Ownership types recorded
PPA 3,325, lease 1,065, prepaid lease 12, other 95
Median battery size
13.5 kWh
Earliest install in data
Aug 1, 2001

Common questions

How many homes in Madera have solar?

13,726 residential solar systems in Madera were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 3,248 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Madera?

138 installer names have at least one install interconnected in Madera in the last 24 months, and 497 appear in the full record.

How common are batteries with new solar in Madera?

18.5% of the solar installs interconnected in Madera include battery storage across all years, and 60.7% in the last 24 months (1,971 of 3,248).

How many solar installs in Madera are under NEM 3.0?

2,077 of the 13,726 residential solar installs in Madera (15.1% of the 13,725 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.