Citadel Roofing and Solar

How many solar installs has Citadel Roofing and Solar done in California, and which license number is on its installs?

Citadel Roofing and Solar has 20,324 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jul 13, 2016 to Aug 31, 2026), most of them in Contra Costa County (2,689), Fresno County (2,027) and Placer County (1,847). CSLB lists license 647149 (CITADEL ROOFING AND SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-10, C-39, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
20,324
Last 24 months
9,686
Total capacity
92,769.8 kW DC
Median system size
3.9 kW DC
With battery storage
15.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 24.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.4% of 20,324 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3,670 installs, latest Aug 31, 2026
Ownership types recorded
PPA 260, lease 4, prepaid lease 23, other 1
Median battery size
13.5 kWh (1,533 installs list a capacity)
First install
Jul 13, 2016
Latest install
Aug 31, 2026
Counties
49
Utilities
PGE 18,769, SCE 1,496, SDGE 59
CSLB license
647149

Is Citadel Roofing and Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (5,662 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016560
20172080
20183690
20193060
202080322
20212,050128
20222,723154
20232,396115
20242,815578
20254,6201,314
2026 (through Aug 31, 2026)3,978725

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3,670 of its 20,324 interconnected installs (18.1% of the 20,324 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 39.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0960.5%not counted
NEM 2.016,55881.5%1,595 (9.6%)
Net Billing Tariff3,67018.1%1,412 (39.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 288 of Citadel Roofing and Solar’s installs the utility recorded a third-party ownership type: PPA 260, lease 4, prepaid lease 23, other 1. Across all installers, 21 residential systems list a third-party owner name that matches Citadel Roofing and Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Lennar174
Bonadelle35
D.R. Horton31
Citadel Roofing and Solar21
Bonadelle Homes17

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9,625 of Citadel Roofing and Solar’s 9,686 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6,114, 63.5%) used modules recorded as JA Solar.

In the last 24 months, 9,686 of Citadel Roofing and Solar’s 9,686 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6,464, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 2,252 of Citadel Roofing and Solar’s 9,686 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,953, 86.7%) used batteries recorded as Tesla.

2,835 of 3,036 battery-paired PG&E and SCE installs (93.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar6,1146,677
Canadian Solar1,0951,097
LONGi7847,884
REC6042,340
Qcells442568
Inverter makerEnphase6,46415,356
Tesla3,5174,016
FranklinWH213249
SolarEdge371,444
Yotta Energy12not in top list
Battery makerTesla1,9532,409
FranklinWH221252
Enphase77172
Enpase11
Lunar Energy1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 19,931 of 20,324 installs, inverters on 20,324. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Citadel Roofing and Solar as developer on 0 battery storage projects and as installer on 1,110 (0 name it as both), 1,110 projects in all with 26,233 kWh of storage. 924 have the status Paid, with $7,757,239 in current incentive allocations. Applications were received from Jul 31, 2019 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid92419,535$7,757,239
Reserved361,545$373,728
Pending Reservation101,625$299,176
Cancelled1373,476$1,910,591
RRF Rejected353$9,280

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage73313,416$2,085,184665$1,894,680
Equity Resiliency2998,120$7,277,107230$5,540,712
Large-Scale Storage734,602$925,17228$293,325
Residential Solar and Storage Equity - AB 209 Non-POU242$53,2711$28,522
Not stated353$9,2800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
647149CITADEL ROOFING AND SOLAR (Limited Liability)CLEARB General Building Contractor; C-2; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 9, 1992Sep 30, 202820,243

License numbers are the ones the utilities recorded on the interconnection applications (20,243 of 20,324 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 647149. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Citadel Roofing and Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
City and County of San Francisco647149400300119
unincorporated San Diego County64714901193271000132
unincorporated Marin County64714931615000025

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa2,689
Fresno2,027
Placer1,847
Solano1,475
Alameda1,451
San Joaquin1,216
Santa Clara1,102
Tulare893
Kern877
Madera631
Yolo594
Sonoma591
Monterey575
El Dorado552
Yuba514
San Benito510
Merced389
Sutter307
San Mateo296
Napa266
San Luis Obispo213
Los Angeles193
Kings178
San Bernardino142
Stanislaus128
Amador127
Riverside116
Marin114
San Diego59
Colusa47
Ventura45
Orange39
Santa Barbara39
Santa Cruz20
Butte14
Lake10
Calaveras9
Nevada8
Tuolumne4
San Francisco3
Tehama3
Glenn2
Mendocino2
Shasta2
Humboldt1
Lassen1
Mariposa1
Mono1
Sacramento1

Top cities

CityInstalls
Rocklin918
Fresno841
Bakersfield834
Lincoln757
Clovis703
Hayward703
Antioch651
Madera575
Hollister508
Fairfield495
Brentwood471
San Jose442
Tulare440
El Dorado Hills425
Oakley424

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CITADEL ROOFING AND SOLAR15,181
Citadel Roofing and Solar3,646
Citadel Roofing & Solar1,334
citadel roofing & solar116
Citadel roofing & solar27
CITADEL ROOFING & SOLAR13
citadel roofing & Solar1
Citadel Roofing & solar1
CItadel Roofing & Solar1
Citadel Roofing & Solar/1
citadel roofing and solar1
Citadel Roofing and solar1
CItadel Roofing and Solar1

Common questions

Where does Citadel Roofing and Solar install solar?

Its installs are spread across 49 counties. The most are in Contra Costa County (2,689 installs), followed by Fresno County (2,027).

How often does Citadel Roofing and Solar install batteries with solar?

15.0% of its interconnected solar installs include battery storage across all years, and 24.3% in the last 24 months (2,344 of 9,627). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Citadel Roofing and Solar installs are under NEM 3.0 (the Net Billing Tariff)?

3,670 of its 20,324 interconnected installs (18.1% of the 20,324 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 39.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.