Solar installers in Oakley, California
Most installs here are in Contra Costa County.
Who installs the most solar in Oakley?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Oakley are Sunrun (181), Citadel Roofing and Solar (157) and BRIGHT OPS (59). They account for 397 of the 746 residential solar installs interconnected there in that window.
In all, 6,108 homes in Oakley have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 81 installers with installs in this window. 16 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunPower | 955 | 955 |
| 2 | Sunrun | 723 | 723 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 623 | 623 |
| 4 | Vivint Solar Developer, LLC | 433 | 433 |
| 5 | Citadel Roofing and Solar | 424 | 424 |
| 6 | West Coast Solar | 270 | 270 |
| 7 | Bright Planet Solar | 187 | 187 |
| 8 | FREEDOM FOREVER LLC | 136 | 136 |
| 9 | PetersenDean | 119 | 119 |
| 10 | Infinity Energy, Inc | 112 | 112 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 946 | 65 |
| 2023 | 641 | 83 |
| 2024 | 400 | 239 |
| 2025 | 388 | 288 |
| 2026 (through Aug 31, 2026) | 233 | 137 |
Under the Net Billing Tariff (NEM 3.0)
791 of the 6,108 residential solar installs in Oakley (13.0% of the 6,108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.7% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Oakley
| 1 | Sunrun | 237 | 235 | 99.2% |
| 2 | BRIGHT OPS | 70 | 67 | 95.7% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 66 | 62 | 93.9% |
| 4 | Citadel Roofing and Solar | 57 | 3 | 5.3% |
| 5 | FREEDOM FOREVER LLC | 35 | 32 | 91.4% |
| 6 | Empower Electric Solar | 21 | 16 | 76.2% |
| 7 | V3 Electric | 17 | 16 | 94.1% |
| 8 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 15 | 11 | 73.3% |
| 9 | NORTH VALLEY LLC | 13 | 11 | 84.6% |
| 10 | Semper Solaris Construction Inc | 12 | 7 | 58.3% |
| 11 | BETTER EARTH ELECTRIC INC | 11 | 11 | 100.0% |
| 12 | CLEAR DAY ENERGY | 11 | 9 | 81.8% |
| 13 | Future Energy Corporation | 11 | 10 | 90.9% |
| 14 | SENGA ENERGY LLC | 11 | 11 | 100.0% |
| 15 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 10 | 10 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 687 of Oakley’s 746 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (248, 36.1%) used modules recorded as JA Solar.
In the last 24 months, 746 of Oakley’s 746 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (326, 43.7%) used inverters recorded as Tesla.
In the last 24 months, 405 of Oakley’s 746 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (217, 53.6%) used batteries recorded as Tesla.
736 of 924 battery-paired PG&E and SCE installs (79.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 248 | 443 |
| Qcells | 225 | 1,070 | |
| REC | 49 | 493 | |
| LONGi | 45 | 469 | |
| Elin Energy | 32 | not in top list | |
| Inverter maker | Tesla | 326 | 523 |
| Enphase | 317 | 1,964 | |
| SolarEdge | 164 | 2,012 | |
| SunPower | 42 | 1,081 | |
| Fronius | 11 | 214 | |
| Battery maker | Tesla | 217 | 350 |
| SolarEdge | 90 | 112 | |
| Enphase | 70 | 121 | |
| FranklinWH | 7 | 12 | |
| Lunar Energy | 7 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,646 of 6,108 installs, inverters on 6,106. See the methodology and the equipment index.
ZIP codes in Oakley
ZIP codes with their own page where the utilities recorded Oakley on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 94561 | 6,104 | 6,108 | 746 |
SGIP battery storage projects in Oakley
The SGIP report lists 110 battery storage projects with the city Oakley, 59 with the status Paid ($248,357 in current incentive allocations, 738 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 59 | 738 | $248,357 |
| Reserved | 16 | 734 | $555,345 |
| Cancelled | 24 | 812 | $327,214 |
| RRF Rejected | 11 | 144 | $22,521 |
Installers named on the most SGIP storage projects in Oakley
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 22 | 13 |
| Sunrun | 14 | 11 |
| SOLAR 4 AMERICA | 9 | 7 |
| HAVEN ENERGY SERVICES INC | 8 | 3 |
| PetersenDean | 8 | 7 |
| SunPower | 5 | 2 |
| Future Energy Corporation | 4 | 2 |
| Tesla | 4 | 3 |
| Westhaven Solar | 4 | 2 |
| Hooked On Solar | 3 | 2 |
6 of the 110 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Oakley is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 6,108
- Last 24 months
- 746
- Capacity
- 37.8 MW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 15.1% all time; 70.8% last 24 months
- Third-party owned
- 28.8% where reported
- Ownership types recorded
- PPA 1,338, lease 387, prepaid lease 9, other 28
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jan 28, 2002
Common questions
How many homes in Oakley have solar?
6,108 residential solar systems in Oakley were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 746 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Oakley?
81 installer names have at least one install interconnected in Oakley in the last 24 months, and 357 appear in the full record.
How common are batteries with new solar in Oakley?
15.1% of the solar installs interconnected in Oakley include battery storage across all years, and 70.8% in the last 24 months (528 of 746).
How many solar installs in Oakley are under NEM 3.0?
791 of the 6,108 residential solar installs in Oakley (13.0% of the 6,108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.