Solar installers in Rocklin, California

Most installs here are in Placer County.

Who installs the most solar in Rocklin?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Rocklin are Sunrun (201), Citadel Roofing and Solar (186) and SonRay Construction Inc. (74). They account for 461 of the 1,112 residential solar installs interconnected there in that window.

In all, 11,358 homes in Rocklin have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 102 installers with installs in this window. 22 installs in the window were self-installed or had no installer recorded.

1Sunrun201799
2Citadel Roofing and Solar186918
3SonRay Construction Inc.74192
4Tesla Energy Operations (formerly SolarCity)741,231
5NORTH VALLEY LLC3970
6SENGA ENERGY LLC3776
7CONNECTED TECHNOLOGY2868
8BETTER EARTH ELECTRIC INC2743
9Magic Sun Solar, Inc.26361
10Complete Solar2125
11BRIGHT OPS1821
12OHM SOLAR SOLUTIONS1820
13Building Energy & Power Solutions1724
14Westhaven Inc16139
15AMBROSE SOLAR1550
16NATIONWIDE SUN1562
17PRIME HOME SOLUTIONS1455
18SOLARA HOME ENERGY LLC1422
19Hooked On Solar13412
20V3 Electric11214
21SPARTAN HOME SERVICES1011
22SunPower91,210
23CONTINUUM88
24Empower Electric Solar840
25SOLAR AND ROOF DIRECT88

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)1,2311,231
2SunPower1,2101,210
3Citadel Roofing and Solar918918
4Sunrun799799
5Hooked On Solar412412
6Vivint Solar Developer, LLC371371
7Magic Sun Solar, Inc.361361
8Sunworks335335
9PetersenDean332332
10Bright Planet Solar287287

Installs by year

YearInstalls interconnectedWith battery storage
20221,240104
20231,166111
2024424199
2025694444
2026 (through Aug 31, 2026)274210

Under the Net Billing Tariff (NEM 3.0)

903 of the 11,358 residential solar installs in Rocklin (8.0% of the 11,358 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.3% of those include battery storage. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Rocklin

1Sunrun22319989.2%
2Tesla Energy Operations (formerly SolarCity)918593.4%
3NORTH VALLEY LLC444397.7%
4BETTER EARTH ELECTRIC INC3131100.0%
5Magic Sun Solar, Inc.302583.3%
6SENGA ENERGY LLC2525100.0%
7CONNECTED TECHNOLOGY232087.0%
8BRIGHT OPS212095.2%
9Westhaven Inc2020100.0%
10Hooked On Solar191578.9%
11Building Energy & Power Solutions1715.9%
12NATIONWIDE SUN161593.8%
13FREEDOM FOREVER LLC151386.7%
14PRIME HOME SOLUTIONS1515100.0%
15SunPower151066.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,026 of Rocklin’s 1,112 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (279, 27.2%) used modules recorded as Qcells.

In the last 24 months, 1,112 of Rocklin’s 1,112 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (635, 57.1%) used inverters recorded as Enphase.

In the last 24 months, 582 of Rocklin’s 1,112 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (303, 52.1%) used batteries recorded as Tesla.

909 of 1,164 battery-paired PG&E and SCE installs (78.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2791,643
REC2521,016
JA Solar102not in top list
LONGi97642
Silfab61not in top list
Inverter makerEnphase6354,166
Tesla432750
SolarEdge1243,086
SunPower501,835
Fronius18554
Battery makerTesla303443
Enphase181230
SolarEdge5083
PointGuard Energy Inc.1919
FranklinWH1617

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 10,392 of 11,358 installs, inverters on 11,357. See the methodology and the equipment index.

ZIP codes in Rocklin

ZIP codes with their own page where the utilities recorded Rocklin on at least 10% of the ZIP’s installs, through Aug 31, 2026.

957657,2027,208713
956774,1164,116397

SGIP battery storage projects in Rocklin

The SGIP report lists 160 battery storage projects with the city Rocklin, 90 with the status Paid ($1,163,790 in current incentive allocations, 2,993 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid902,993$1,163,790
PBI in Process21,240$496,000
Reserved12179$273,094
Pending Reservation113$29,286
Cancelled455,569$1,560,463
RRF Rejected10134$20,738

Installers named on the most SGIP storage projects in Rocklin

InstallerProjectsPaid
Hooked On Solar2419
Infinity Energy, Inc1610
Semper Solaris Construction Inc138
Citadel Roofing and Solar86
JAJ Roofing dba Citadel Roofing & Solar86
Tesla86
SOLAR 4 AMERICA73
Sunrun76
Tesla Energy Operations (formerly SolarCity)76
PetersenDean63

18 of the 160 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Rocklin is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
11,358
Last 24 months
1,112
Capacity
73 MW DC
Median system size
5.9 kW DC
With battery storage
10.2% all time; 65.9% last 24 months
Third-party owned
18.3% where reported
Ownership types recorded
PPA 1,556, lease 461, prepaid lease 14, other 45
Median battery size
13.5 kWh
Earliest install in data
Sep 23, 2002

Common questions

How many homes in Rocklin have solar?

11,358 residential solar systems in Rocklin were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,112 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Rocklin?

102 installer names have at least one install interconnected in Rocklin in the last 24 months, and 553 appear in the full record.

How common are batteries with new solar in Rocklin?

10.2% of the solar installs interconnected in Rocklin include battery storage across all years, and 65.9% in the last 24 months (733 of 1,112).

How many solar installs in Rocklin are under NEM 3.0?

903 of the 11,358 residential solar installs in Rocklin (8.0% of the 11,358 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.