Tesla Energy Operations (formerly SolarCity)

How many solar installs has Tesla Energy Operations (formerly SolarCity) done in California, and which license number is on its installs?

Tesla Energy Operations (formerly SolarCity) has 216,521 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Nov 14, 2006 to Aug 31, 2026), most of them in San Diego County (24,769), Los Angeles County (21,914) and Orange County (17,179). CSLB lists license 888104 (TESLA ENERGY OPERATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
216,521
Last 24 months
13,956
Total capacity
1,373,901.3 kW DC
Median system size
5.6 kW DC
With battery storage
22.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 94.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
35.8% of 202,445 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17,008 installs, latest Aug 31, 2026
Ownership types recorded
PPA 38,155, lease 31,251, prepaid lease 1,050, other 2,075
Median battery size
13.5 kWh (24,030 installs list a capacity)
First install
Nov 14, 2006
Latest install
Aug 31, 2026
Counties
49
Utilities
PGE 114,319, SCE 73,926, SDGE 28,276
CSLB license
888104

Is Tesla still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (6,880 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200630
20072370
20084460
20097360
20101,0430
20112,2190
20123,4130
201310,1932
201418,363113
201539,14546
201632,2627
201716,061352
201813,7301,647
20199,2931,377
202011,3752,957
202112,6105,081
202214,6828,372
202312,6646,688
20246,3095,159
20257,1156,314
2026 (through Aug 31, 2026)4,6224,154

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17,008 of its 216,521 interconnected installs (7.9% of the 216,501 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0111,20451.4%not counted
NEM 2.088,28940.8%27,048 (36.6%)
Net Billing Tariff17,0087.9%14,407 (92.9%)
Not recorded20

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 72,531 of Tesla Energy Operations (formerly SolarCity)’s installs the utility recorded a third-party ownership type: PPA 38,155, lease 31,251, prepaid lease 1,050, other 2,075. Across all installers, 58,009 residential systems list a third-party owner name that matches Tesla Energy Operations (formerly SolarCity) exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SolarCity57,784
Tesla4,709
AU Solar 1, LLC2,016
Solar City1,154
SolarCity Corporatio1,047

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13,059 of Tesla Energy Operations (formerly SolarCity)’s 13,956 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9,027, 69.1%) used modules recorded as Qcells.

In the last 24 months, 13,938 of Tesla Energy Operations (formerly SolarCity)’s 13,956 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12,947, 92.9%) used inverters recorded as Tesla.

In the last 24 months, 10,018 of Tesla Energy Operations (formerly SolarCity)’s 13,956 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10,015, 100.0%) used batteries recorded as Tesla.

37,208 of 42,269 battery-paired PG&E and SCE installs (88.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells9,02743,055
Tesla3,22122,751
SunPower382not in top list
Kyocera17128,058
SolarCity16725,108
Inverter makerTesla12,94745,330
Enphase843not in top list
SolarEdge65242,903
SunPower366not in top list
ABB35764,099
Battery makerTesla10,01537,233
Enphase34
LG14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 190,280 of 216,521 installs, inverters on 215,857. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Tesla Energy Operations (formerly SolarCity) as developer on 360 battery storage projects and as installer on 2,476 (313 name it as both), 2,523 projects in all with 118,509 kWh of storage. 2,180 have the status Paid, with $33,155,084 in current incentive allocations. Applications were received from Nov 17, 2011 to Aug 30, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,18099,648$33,155,084
PBI in Process42,130$539,965
Cancelled33016,534$7,632,548
RRF Rejected9198$41,760

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1,71532,099$9,199,7661,566$8,385,574
Large-Scale Storage21968,939$19,266,249190$16,129,763
Equity Resiliency1042,666$1,815,403100$1,745,070
Residential Storage Equity240$28,1991$11,220
Not stated48314,764$11,059,740323$6,883,457

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888104TESLA ENERGY OPERATIONS INC (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorDec 7, 2006Dec 31, 2026191,497

License numbers are the ones the utilities recorded on the interconnection applications (191,783 of 216,521 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Tesla Energy Operations (formerly SolarCity)’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco888104126921341027960403524692
unincorporated San Diego County8881043693224094252672036982522,198
unincorporated Marin County888104617715911000221412

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego24,769
Los Angeles21,914
Orange17,179
Riverside16,191
Santa Clara16,117
Alameda14,068
Contra Costa13,909
San Bernardino11,076
Fresno9,016
Kern8,787
San Joaquin7,484
San Mateo5,257
Ventura4,595
Solano4,042
Tulare3,974
San Luis Obispo3,591
Monterey3,584
Placer3,427
Sonoma3,109
Santa Barbara2,715
Marin2,329
El Dorado1,969
Merced1,805
Yolo1,681
Santa Cruz1,537
San Francisco1,533
Butte1,527
Kings1,298
Madera1,294
Napa1,031
Sutter917
Yuba659
Stanislaus630
San Benito578
Lake501
Calaveras398
Nevada359
Tehama342
Shasta318
Tuolumne279
Colusa196
Amador194
Glenn174
Mariposa74
Mendocino53
Sacramento32
Inyo6
Lassen2
Plumas1

Top cities

CityInstalls
San Diego9,151
San Jose9,031
Bakersfield6,901
Fresno4,988
Fremont3,226
Stockton3,062
Chula Vista2,545
Oceanside2,403
Corona2,367
Brentwood2,352
Clovis2,330
San Ramon2,234
Irvine2,147
Tracy1,767
Visalia1,761

Names as recorded by the utilities

The utilities recorded this installer under 78 spellings. The 25 most common are shown. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarCity Corporation78,964
TESLA ENERGY OPERATIONS INC64,095
SolarCity52,007
TESLA ENERGY OPERATIONS, INC.5,452
Tesla Energy2,297
Tesla Energy Operations, Inc.1,887
Tesla Military Housing1,823
SOLARCITY CORPORATION1,733
Tesla Energy Operations, Inc1,093
SolarCityMH1,019
Solarcity932
SolarCity Corporation - Amy909
SolarCity Corp558
TESLA ENERGY OPERATIONS, INC499
tesla energy operations, Inc420
Tesla Energy Operations Inc352
Solarcity Corporation326
tesla energy operations306
Tesla Energy Operations224
TESLA-ENERGY-OPERATIONS-INC201
SolarCity DBA189
Tesla Energy Operations,Inc173
solarcity131
SolarCity DBA Tesla123
SolarCity corp114

Common questions

Where does Tesla Energy Operations (formerly SolarCity) install solar?

Its installs are spread across 49 counties. The most are in San Diego County (24,769 installs), followed by Los Angeles County (21,914).

How often does Tesla Energy Operations (formerly SolarCity) install batteries with solar?

22.5% of its interconnected solar installs include battery storage across all years, and 94.9% in the last 24 months (12,371 of 13,039). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Tesla Energy Operations (formerly SolarCity) installs are under NEM 3.0 (the Net Billing Tariff)?

17,008 of its 216,521 interconnected installs (7.9% of the 216,501 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.