How many solar installs has V3 Electric done in California, and which license number is on its installs?

V3 Electric has 15,517 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Nov 18, 2014 to Aug 31, 2026), most of them in San Bernardino County (3,056), El Dorado County (1,679) and Placer County (1,177). CSLB lists license 1000573 (V3 ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
15,517
Last 24 months
3,829
Total capacity
108,647.7 kW DC
Median system size
6.3 kW DC
With battery storage
40.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
81.1% of 15,516 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5,022 installs, latest Aug 31, 2026
Ownership types recorded
PPA 12,024, lease 182, prepaid lease 2, other 377
Median battery size
9.8 kWh (3,260 installs list a capacity)
First install
Nov 18, 2014
Latest install
Aug 31, 2026
Counties
46
Utilities
PGE 9,857, SCE 5,568, SDGE 92
CSLB license
1000573

Is V3 Electric still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1,366 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201440
20152430
20163830
20175460
20181,0880
20191,31685
20201,239332
20211,451224
20221,74493
20232,120368
20242,4162,155
20252,1462,112
2026 (through Aug 31, 2026)821814

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5,022 of its 15,517 interconnected installs (32.4% of the 15,514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08145.2%not counted
NEM 2.09,67862.4%1,233 (12.8%)
Net Billing Tariff5,02232.4%4,833 (96.6%)
Not recorded3

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 12,585 of V3 Electric’s installs the utility recorded a third-party ownership type: PPA 12,024, lease 182, prepaid lease 2, other 377. Across all installers, 1,940 residential systems list a third-party owner name that matches V3 Electric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunRun3,637
Sunnova3,234
V3 Electric1,938
Goodleap1,311
Everbright1,061

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3,520 of V3 Electric’s 3,829 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,493, 42.4%) used modules recorded as JA Solar.

In the last 24 months, 3,828 of V3 Electric’s 3,829 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3,266, 85.3%) used inverters recorded as Enphase.

In the last 24 months, 3,474 of V3 Electric’s 3,829 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2,585, 74.4%) used batteries recorded as Enphase.

5,641 of 6,183 battery-paired PG&E and SCE installs (91.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar1,4932,316
Canadian Solar9642,644
Qcells7866,683
Elin Energy296not in top list
Trina Solar100not in top list
Inverter makerEnphase3,2665,393
Tesla6861,624
SolarEdge5519,852
SunPower45420
ABB43not in top list
Battery makerEnphase2,5853,195
Tesla7791,820
SolarEdge120245
LG5385
FranklinWH4not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 14,063 of 15,517 installs, inverters on 15,516. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names V3 Electric as developer on 1,403 battery storage projects and as installer on 1,440 (1,396 name it as both), 1,447 projects in all with 31,294 kWh of storage. 920 have the status Paid, with $16,063,835 in current incentive allocations. Applications were received from Aug 14, 2018 to Nov 14, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid92020,482$16,063,835
Reserved8187$142,223
Cancelled4609,951$7,987,012
RRF Rejected59675$124,204

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency82822,607$22,371,398557$15,009,998
Small Residential Storage5096,494$1,213,685342$826,326
Large-Scale Storage301,148$322,30816$172,772
Residential Storage Equity21370$285,6805$54,740
Not stated59675$124,2040$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1000573V3 ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJan 27, 2015Jan 31, 202715,392

License numbers are the ones the utilities recorded on the interconnection applications (15,462 of 15,517 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1000573. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list V3 Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202220232024Total
unincorporated San Diego County1000573211511525

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino3,056
El Dorado1,679
Placer1,177
Riverside1,112
Solano1,089
Los Angeles982
Amador789
Contra Costa747
San Joaquin719
Yolo451
Calaveras446
Sutter424
Yuba368
Lake288
Napa251
Alameda237
Nevada189
Orange188
Tuolumne188
Butte158
Ventura128
Sonoma124
Fresno106
Tulare78
San Diego77
Santa Clara71
Shasta64
Kern58
Marin43
Glenn34
Stanislaus34
Madera32
Colusa26
Tehama22
Mendocino17
Kings13
Sacramento12
San Mateo12
Merced8
Plumas5
Santa Barbara4
Monterey3
Santa Cruz3
Mariposa2
San Benito2
San Luis Obispo1

Top cities

CityInstalls
Placerville450
Lincoln442
Victorville410
El Dorado Hills383
Hesperia372
Apple Valley368
Stockton357
Vacaville350
Yuba City345
San Bernardino330
Fairfield306
Cameron Park295
Fontana294
Ione243
Jackson223

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
V3 ELECTRIC INC12,137
V3 Electric3,016
V3 Electric, Inc196
V3 Electric Inc93
V3 ELECTRIC41
V3 Electric Inc.18
V3 Electric, Inc.10
V3 electric5
v3 Electric1

Common questions

Where does V3 Electric install solar?

Its installs are spread across 46 counties. The most are in San Bernardino County (3,056 installs), followed by El Dorado County (1,679).

How often does V3 Electric install batteries with solar?

40.1% of its interconnected solar installs include battery storage across all years, and 98.6% in the last 24 months (3,763 of 3,817). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many V3 Electric installs are under NEM 3.0 (the Net Billing Tariff)?

5,022 of its 15,517 interconnected installs (32.4% of the 15,514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.