V3electric

How many solar installs has V3electric done in California, and which license number is on its installs?

V3electric has 38 residential solar installs interconnected in California, active in the records from 2018 through 2019 (Jun 27, 2018 to Jan 15, 2019), most of them in Placer County (6), Contra Costa County (5) and Yolo County (5). CSLB lists license 1000573 (V3 ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
38
Last 24 months
0
Total capacity
257.6 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
97.4% of 38 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 37
First install
Jun 27, 2018
Latest install
Jan 15, 2019
Counties
14
Utilities
PGE 38
CSLB license
1000573

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018370
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.038100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 37 of V3electric’s installs the utility recorded a third-party ownership type: PPA 37, lease 0, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches V3electric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunRun35
Sunnova1
SUNURN1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 38 of V3electric’s 38 installs name a module maker in the “Generator Manufacturer” fields, and most of those (35, 92.1%) used modules recorded as Qcells.

Across all years, 38 of V3electric’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells035
LG01
LONGi01
Trina Solar01
Inverter makerSolarEdge038

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 38 of 38 installs, inverters on 38. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1000573V3 ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJan 27, 2015Jan 31, 202737

License numbers are the ones the utilities recorded on the interconnection applications (38 of 38 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1000573. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list V3electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202220232024Total
unincorporated San Diego County1000573211511525

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Placer6
Contra Costa5
Yolo5
San Joaquin4
El Dorado3
Tuolumne3
Butte2
Nevada2
Solano2
Yuba2
Amador1
Calaveras1
Lake1
Sutter1

Top cities

CityInstalls
Rocklin4
Esparto3
Bethel Island2
Cameron Park2
Grass Valley2
Jamestown2
Lathrop2
Lincoln2
Oroville2
Stockton2
Byron1
Copperopolis1
Davis1
Discovery Bay1
Fairfield1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
V3electric38

Common questions

Where does V3electric install solar?

Its installs are spread across 14 counties. The most are in Placer County (6 installs), followed by Contra Costa County (5).

How often does V3electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many V3electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.