Nexus Energy Systems

How many solar installs has Nexus Energy Systems done in California, and which license number is on its installs?

Nexus Energy Systems has 6,091 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Dec 30, 2010 to Aug 31, 2026), most of them in Los Angeles County (888), Santa Clara County (689) and Alameda County (402). CSLB lists license 359060 (NEXUS ENERGY SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
6,091
Last 24 months
802
Total capacity
38,138.2 kW DC
Median system size
5.4 kW DC
With battery storage
10.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 55.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
20.3% of 5,875 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
622 installs, latest Aug 28, 2026
Ownership types recorded
PPA 98, lease 1,082, prepaid lease 11
Median battery size
10 kWh (177 installs list a capacity)
First install
Dec 30, 2010
Latest install
Aug 31, 2026
Counties
49
Utilities
PGE 3,989, SCE 1,832, SDGE 270
CSLB license
359060

Is Nexus Energy Systems still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (463 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
2011110
2012160
2013190
2014670
20154090
20164360
20174450
20187281
20197411
202054415
202146736
202258226
202367546
2024231112
2025404214
2026 (through Aug 31, 2026)315166

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

622 of its 6,091 interconnected installs (10.2% of the 6,082 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,16619.2%not counted
NEM 2.04,29470.6%127 (3.1%)
Net Billing Tariff62210.2%472 (79.7%)
Not recorded9

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1,191 of Nexus Energy Systems’s installs the utility recorded a third-party ownership type: PPA 98, lease 1,082, prepaid lease 11, other 0. Across all installers, 939 residential systems list a third-party owner name that matches Nexus Energy Systems exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Nexus Energy Systems931
Sunnova67
GoodLeap LLC61
Nexus Energy System47
nexus14

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 701 of Nexus Energy Systems’ 802 installs name a module maker in the “Generator Manufacturer” fields, and most of those (396, 56.5%) used modules recorded as Hyundai.

In the last 24 months, 794 of Nexus Energy Systems’ 802 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (788, 99.2%) used inverters recorded as Enphase.

In the last 24 months, 437 of Nexus Energy Systems’ 802 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (412, 94.3%) used batteries recorded as Enphase.

551 of 617 battery-paired PG&E and SCE installs (89.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai3961,443
JA Solar121not in top list
Silfab1131,517
Qcells86439
SunPower45not in top list
Inverter makerEnphase7885,709
SolarEdge115504
SunPower46176
Tesla27not in top list
Power-One24119
Battery makerEnphase412516
Tesla1944
LG46
ENERGY ENPHASE33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,811 of 6,091 installs, inverters on 6,083. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Nexus Energy Systems as developer on 46 battery storage projects and as installer on 44 (44 name it as both), 46 projects in all with 830 kWh of storage. 20 have the status Paid, with $112,905 in current incentive allocations. Applications were received from Apr 7, 2020 to Mar 21, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid20365$112,905
Cancelled22380$193,756
RRF Rejected485$14,497

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage28493$81,86816$50,399
Equity Resiliency13232$221,2354$62,506
Large-Scale Storage120$3,5580$0
Not stated485$14,4970$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
359060NEXUS ENERGY SYSTEMS INC (Corporation)CLEARB General Building ContractorJun 9, 1978Jul 31, 20275,893

License numbers are the ones the utilities recorded on the interconnection applications (5,932 of 6,091 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 359060. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Nexus Energy Systems’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County35906011024029166499
unincorporated Marin County3590600720100011039

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles888
Santa Clara689
Alameda402
Contra Costa362
San Bernardino340
San Mateo304
Fresno288
Orange251
San Diego236
San Joaquin221
Solano202
Riverside192
Monterey184
Marin155
San Francisco141
Sonoma139
San Benito138
Kern132
Merced83
Tulare77
Yolo76
Santa Cruz71
Ventura65
Madera62
Shasta42
Napa40
Kings37
Placer31
Sutter25
Yuba24
Butte22
Calaveras22
San Luis Obispo22
Tehama22
El Dorado17
Lake15
Santa Barbara14
Tuolumne14
Amador7
Stanislaus7
Colusa6
Humboldt6
Mendocino6
Glenn4
Nevada3
Plumas3
Mariposa2
Mono1
Sacramento1

Top cities

CityInstalls
San Jose435
Palmdale211
San Francisco141
Hollister136
Fresno135
Salinas129
Lancaster105
Stockton81
Gilroy72
Oakland63
Bakersfield62
Fairfield61
Fremont61
Santa Rosa61
Concord60

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEXUS ENERGY SYSTEMS INC3,219
Nexus Energy Systems1,762
nexus energy systems705
NEXUS ENERGY SYSTEMS395
Nexus Energy Systems.5
Nexus Energy systems2
Nexus energy systems1
nexus energy systems'1
nexus energy systems`1

Common questions

Where does Nexus Energy Systems install solar?

Its installs are spread across 49 counties. The most are in Los Angeles County (888 installs), followed by Santa Clara County (689).

How often does Nexus Energy Systems install batteries with solar?

10.6% of its interconnected solar installs include battery storage across all years, and 55.0% in the last 24 months (428 of 778). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Nexus Energy Systems installs are under NEM 3.0 (the Net Billing Tariff)?

622 of its 6,091 interconnected installs (10.2% of the 6,082 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.