Solar installers in Salinas, California
Most installs here are in Monterey County.
Who installs the most solar in Salinas?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Salinas are Sunrun (310), BRIGHT OPS (112) and Tesla Energy Operations (formerly SolarCity) (42). They account for 464 of the 732 residential solar installs interconnected there in that window.
In all, 6,340 homes in Salinas have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 86 installers with installs in this window. 15 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 310 | 1,087 |
| 2 | BRIGHT OPS | 112 | 122 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 42 | 1,611 |
| 4 | PREMO & TORRES SOLAR ELECTRIC JV | 18 | 21 |
| 5 | SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | 16 | 110 |
| 6 | FREEDOM FOREVER LLC | 15 | 93 |
| 7 | BETTER EARTH ELECTRIC INC | 13 | 49 |
| 8 | PLANET OATH ENERGY INC | 10 | 17 |
| 9 | Semper Solaris Construction Inc | 9 | 39 |
| 10 | SOLARTECTURE | 9 | 39 |
| 11 | Allterra Solar | 8 | 95 |
| 12 | BRIGHT FUTURE ENERGY | 7 | 77 |
| 13 | LYTEGEN | 7 | 7 |
| 14 | NRG Clean Power | 7 | 29 |
| 15 | Solex | 7 | 73 |
| 16 | Nexus Energy Systems | 6 | 129 |
| 17 | POWUR HOME CONSTRUCTION | 6 | 8 |
| 18 | Solar Technologies | 6 | 63 |
| 19 | Citadel Roofing and Solar | 5 | 8 |
| 20 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 5 | 74 |
| 21 | Clean Energy Solutions | 4 | 14 |
| 22 | Coastal Electric | 4 | 16 |
| 23 | SWITCH ENERGY INC | 4 | 4 |
| 24 | AXIA SOLAR CORP | 3 | 4 |
| 25 | EXO Energy | 3 | 5 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 1,611 | 1,611 |
| 2 | Sunrun | 1,087 | 1,087 |
| 3 | Vivint Solar Developer, LLC | 554 | 554 |
| 4 | GRID Alternatives | 139 | 139 |
| 5 | Nexus Energy Systems | 129 | 129 |
| 6 | BRIGHT OPS | 122 | 122 |
| 7 | SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | 110 | 110 |
| 8 | Scudder Roofing Sun Energy Systems | 100 | 100 |
| 9 | SunPower | 99 | 99 |
| 10 | Allterra Solar | 95 | 95 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 519 | 72 |
| 2023 | 551 | 100 |
| 2024 | 393 | 287 |
| 2025 | 425 | 374 |
| 2026 (through Aug 31, 2026) | 198 | 180 |
Under the Net Billing Tariff (NEM 3.0)
911 of the 6,340 residential solar installs in Salinas (14.4% of the 6,340 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.6% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Salinas
| 1 | Sunrun | 428 | 426 | 99.5% |
| 2 | BRIGHT OPS | 121 | 113 | 93.4% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 44 | 43 | 97.7% |
| 4 | FREEDOM FOREVER LLC | 24 | 23 | 95.8% |
| 5 | BETTER EARTH ELECTRIC INC | 23 | 23 | 100.0% |
| 6 | PREMO & TORRES SOLAR ELECTRIC JV | 21 | 15 | 71.4% |
| 7 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 20 | 9 | 45.0% |
| 8 | PLANET OATH ENERGY INC | 16 | 12 | 75.0% |
| 9 | SUNTERNAL CONSTRUCTION INC | 15 | 15 | 100.0% |
| 10 | SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | 13 | 11 | 84.6% |
| 11 | Semper Solaris Construction Inc | 9 | 8 | 88.9% |
| 12 | NRG Clean Power | 8 | 6 | 75.0% |
| 13 | POWUR HOME CONSTRUCTION | 8 | 4 | 50.0% |
| 14 | SOLARTECTURE | 8 | 6 | 75.0% |
| 15 | LYTEGEN | 6 | 5 | 83.3% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 700 of Salinas’ 732 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (194, 27.7%) used modules recorded as JA Solar.
In the last 24 months, 732 of Salinas’ 732 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (389, 53.1%) used inverters recorded as Tesla.
In the last 24 months, 544 of Salinas’ 732 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (302, 55.5%) used batteries recorded as Tesla.
968 of 1,134 battery-paired PG&E and SCE installs (85.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 194 | 419 |
| Qcells | 188 | 691 | |
| REC | 73 | 1,317 | |
| Elin Energy | 62 | not in top list | |
| LONGi | 51 | not in top list | |
| Inverter maker | Tesla | 389 | 645 |
| SolarEdge | 191 | 1,940 | |
| Enphase | 166 | 1,687 | |
| Lunar Energy | 29 | not in top list | |
| Delta Electronics | 22 | not in top list | |
| Battery maker | Tesla | 302 | 505 |
| SolarEdge | 118 | 135 | |
| Enphase | 64 | 118 | |
| Lunar Energy | 29 | 29 | |
| LG | 15 | 142 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,983 of 6,340 installs, inverters on 6,339. See the methodology and the equipment index.
ZIP codes in Salinas
ZIP codes with their own page where the utilities recorded Salinas on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Salinas
The SGIP report lists 278 battery storage projects with the city Salinas, 166 with the status Paid ($2,868,488 in current incentive allocations, 7,579 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 166 | 7,579 | $2,868,488 |
| PBI in Process | 2 | 4,529 | $1,027,345 |
| Reserved | 20 | 2,703 | $1,625,194 |
| Pending Reservation | 1 | 192 | $194,089 |
| Cancelled | 83 | 19,708 | $8,543,554 |
| RRF Rejected | 6 | 111 | $16,692 |
Installers named on the most SGIP storage projects in Salinas
32 of the 278 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Salinas is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 6,340
- Last 24 months
- 732
- Capacity
- 33.4 MW DC
- Median system size
- 4.4 kW DC
- With battery storage
- 17.9% all time; 88.4% last 24 months
- Third-party owned
- 38.3% where reported
- Ownership types recorded
- PPA 2,110, lease 297, prepaid lease 14, other 10
- Median battery size
- 13.5 kWh
- Earliest install in data
- Feb 11, 2002
Common questions
How many homes in Salinas have solar?
6,340 residential solar systems in Salinas were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 732 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Salinas?
86 installer names have at least one install interconnected in Salinas in the last 24 months, and 375 appear in the full record.
How common are batteries with new solar in Salinas?
17.9% of the solar installs interconnected in Salinas include battery storage across all years, and 88.4% in the last 24 months (647 of 732).
How many solar installs in Salinas are under NEM 3.0?
911 of the 6,340 residential solar installs in Salinas (14.4% of the 6,340 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.