Bright Planet Solar
How many solar installs has Bright Planet Solar done in California, and which license number is on its installs?
Bright Planet Solar has 33,294 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jul 7, 2016 to Aug 31, 2026), most of them in San Diego County (7,749), Riverside County (3,827) and San Bernardino County (3,286). CSLB lists license 1020761 (BRIGHT OPS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 33,294
- Last 24 months
- 1,435
- Total capacity
- 236,737.4 kW DC
- Median system size
- 6.3 kW DC
- With battery storage
- 5.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 15.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 85.1% of 33,294 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 4,858 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 27,679, lease 44, prepaid lease 49, other 554
- Median battery size
- 9.7 kWh (1,221 installs list a capacity)
- First install
- Jul 7, 2016
- Latest install
- Aug 31, 2026
- Counties
- 48
- Utilities
- PGE 12,663, SCE 12,343, SDGE 8,288
- CSLB license
- 1020761
Is Bright Planet Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (425 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2016 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2016 | 49 | 0 |
| 2017 | 163 | 0 |
| 2018 | 478 | 0 |
| 2019 | 1,629 | 1 |
| 2020 | 2,991 | 9 |
| 2021 | 4,372 | 34 |
| 2022 | 11,296 | 103 |
| 2023 | 8,702 | 504 |
| 2024 | 2,550 | 688 |
| 2025 | 898 | 11 |
| 2026 (through Aug 31, 2026) | 166 | 1 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
4,858 of its 33,294 interconnected installs (14.6% of the 33,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 60 | 0.2% | not counted |
| NEM 2.0 | 28,376 | 85.2% | 362 (1.6%) |
| Net Billing Tariff | 4,858 | 14.6% | 989 (38.1%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 28,326 of Bright Planet Solar’s installs the utility recorded a third-party ownership type: PPA 27,679, lease 44, prepaid lease 49, other 554. Across all installers, 3,720 residential systems list a third-party owner name that matches Bright Planet Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun Inc. | 21,860 |
| BRIGHT PLANET | 3,720 |
| Everbright | 1,589 |
| Loanpal | 222 |
| Sunlight | 189 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1,379 of Bright Planet Solar’s 1,435 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (487, 35.3%) used modules recorded as JA Solar.
In the last 24 months, 1,435 of Bright Planet Solar’s 1,435 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,239, 86.3%) used inverters recorded as SolarEdge.
In the last 24 months, 24 of Bright Planet Solar’s 1,435 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (15, 62.5%) used batteries recorded as SolarEdge.
1,305 of 1,351 battery-paired PG&E and SCE installs (96.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 487 | 497 |
| Qcells | 406 | 17,469 | |
| LONGi | 394 | 6,630 | |
| Canadian Solar | 85 | 1,701 | |
| Solaria | 6 | not in top list | |
| Inverter maker | SolarEdge | 1,239 | 26,557 |
| Tesla | 173 | 738 | |
| Enphase | 37 | 5,200 | |
| ABB | 5 | not in top list | |
| SMA | 5 | 354 | |
| Battery maker | SolarEdge | 15 | 1,064 |
| Tesla | 8 | 177 | |
| LG | 1 | 64 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 28,642 of 33,294 installs, inverters on 33,294. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Bright Planet Solar as developer on 12 battery storage projects and as installer on 12 (12 name it as both), 12 projects in all with 176 kWh of storage. 3 have the status Paid, with $54,899 in current incentive allocations. Applications were received from Feb 5, 2019 to Oct 8, 2024.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 3 | 61 | $54,899 |
| Cancelled | 7 | 89 | $19,084 |
| RRF Rejected | 2 | 26 | $4,640 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 7 | 88 | $13,020 | 1 | $2,099 |
| Equity Resiliency | 2 | 53 | $52,800 | 2 | $52,800 |
| Residential Storage Equity | 1 | 10 | $8,163 | 0 | $0 |
| Not stated | 2 | 26 | $4,640 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1020761 | BRIGHT OPS (Corporation) | CLEAR, Pending Case/CIT| Pending IFS | C-10 Electrical Contractor | Nov 14, 2016 | Nov 30, 2026 | 33,159 |
License numbers are the ones the utilities recorded on the interconnection applications (33,291 of 33,294 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending suspension date of Oct 31, 2026 for license 1020761. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list Bright Planet Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 1020761 | 3 | 7 | 6 | 0 | 5 | 4 | 9 | 180 | 33 | 247 |
| unincorporated San Diego County | 1020761 | 65 | 208 | 397 | 400 | 253 | 214 | 226 | 172 | 35 | 1,970 |
| unincorporated Marin County | 1020761 | 0 | 0 | 0 | 1 | 1 | 0 | 0 | 0 | 0 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- BRIGHT OPS: 15,272 installs, license 1020761
Counties
| County | Installs |
|---|---|
| San Diego | 7,749 |
| Riverside | 3,827 |
| San Bernardino | 3,286 |
| Los Angeles | 2,636 |
| San Joaquin | 2,032 |
| Orange | 1,710 |
| Contra Costa | 1,703 |
| Fresno | 1,231 |
| Santa Clara | 1,222 |
| Solano | 1,040 |
| Kern | 1,020 |
| Placer | 804 |
| Tulare | 593 |
| Alameda | 566 |
| El Dorado | 457 |
| Yolo | 405 |
| Ventura | 323 |
| Sutter | 287 |
| Sonoma | 274 |
| Merced | 232 |
| Butte | 180 |
| Kings | 175 |
| Yuba | 169 |
| Madera | 152 |
| Santa Barbara | 135 |
| Lake | 108 |
| Nevada | 91 |
| Amador | 84 |
| Stanislaus | 81 |
| Napa | 73 |
| San Luis Obispo | 70 |
| Tehama | 61 |
| Glenn | 59 |
| Monterey | 56 |
| Santa Cruz | 52 |
| Calaveras | 50 |
| San Mateo | 50 |
| Marin | 47 |
| San Benito | 46 |
| Mendocino | 43 |
| Shasta | 41 |
| Colusa | 30 |
| San Francisco | 20 |
| Tuolumne | 11 |
| Mariposa | 6 |
| Sacramento | 4 |
| Plumas | 2 |
| Mono | 1 |
Top cities
| City | Installs |
|---|---|
| San Diego | 2,675 |
| Stockton | 1,265 |
| Chula Vista | 995 |
| San Jose | 878 |
| Fresno | 803 |
| Antioch | 602 |
| Oceanside | 580 |
| Bakersfield | 529 |
| Escondido | 498 |
| Moreno Valley | 456 |
| Palmdale | 443 |
| Hemet | 436 |
| Fontana | 421 |
| Vacaville | 406 |
| El Cajon | 367 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| BRIGHT PLANET | 22,773 |
| Bright Planet Solar | 9,497 |
| BRIGHT PLANET SOLAR INC | 984 |
| BRIGHT PLANET SOLAR | 37 |
| BRIGHT PLANET SOLAR INC. | 3 |
Common questions
Where does Bright Planet Solar install solar?
Its installs are spread across 48 counties. The most are in San Diego County (7,749 installs), followed by Riverside County (3,827).
How often does Bright Planet Solar install batteries with solar?
5.4% of its interconnected solar installs include battery storage across all years, and 15.4% in the last 24 months (24 of 156). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Bright Planet Solar installs are under NEM 3.0 (the Net Billing Tariff)?
4,858 of its 33,294 interconnected installs (14.6% of the 33,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.