Bright Planet Solar

How many solar installs has Bright Planet Solar done in California, and which license number is on its installs?

Bright Planet Solar has 33,294 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Jul 7, 2016 to Aug 31, 2026), most of them in San Diego County (7,749), Riverside County (3,827) and San Bernardino County (3,286). CSLB lists license 1020761 (BRIGHT OPS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
33,294
Last 24 months
1,435
Total capacity
236,737.4 kW DC
Median system size
6.3 kW DC
With battery storage
5.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 15.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
85.1% of 33,294 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4,858 installs, latest Aug 31, 2026
Ownership types recorded
PPA 27,679, lease 44, prepaid lease 49, other 554
Median battery size
9.7 kWh (1,221 installs list a capacity)
First install
Jul 7, 2016
Latest install
Aug 31, 2026
Counties
48
Utilities
PGE 12,663, SCE 12,343, SDGE 8,288
CSLB license
1020761

Is Bright Planet Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (425 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016490
20171630
20184780
20191,6291
20202,9919
20214,37234
202211,296103
20238,702504
20242,550688
202589811
2026 (through Aug 31, 2026)1661

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4,858 of its 33,294 interconnected installs (14.6% of the 33,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0600.2%not counted
NEM 2.028,37685.2%362 (1.6%)
Net Billing Tariff4,85814.6%989 (38.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 28,326 of Bright Planet Solar’s installs the utility recorded a third-party ownership type: PPA 27,679, lease 44, prepaid lease 49, other 554. Across all installers, 3,720 residential systems list a third-party owner name that matches Bright Planet Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun Inc.21,860
BRIGHT PLANET3,720
Everbright1,589
Loanpal222
Sunlight189

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1,379 of Bright Planet Solar’s 1,435 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (487, 35.3%) used modules recorded as JA Solar.

In the last 24 months, 1,435 of Bright Planet Solar’s 1,435 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,239, 86.3%) used inverters recorded as SolarEdge.

In the last 24 months, 24 of Bright Planet Solar’s 1,435 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (15, 62.5%) used batteries recorded as SolarEdge.

1,305 of 1,351 battery-paired PG&E and SCE installs (96.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar487497
Qcells40617,469
LONGi3946,630
Canadian Solar851,701
Solaria6not in top list
Inverter makerSolarEdge1,23926,557
Tesla173738
Enphase375,200
ABB5not in top list
SMA5354
Battery makerSolarEdge151,064
Tesla8177
LG164

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 28,642 of 33,294 installs, inverters on 33,294. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bright Planet Solar as developer on 12 battery storage projects and as installer on 12 (12 name it as both), 12 projects in all with 176 kWh of storage. 3 have the status Paid, with $54,899 in current incentive allocations. Applications were received from Feb 5, 2019 to Oct 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid361$54,899
Cancelled789$19,084
RRF Rejected226$4,640

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage788$13,0201$2,099
Equity Resiliency253$52,8002$52,800
Residential Storage Equity110$8,1630$0
Not stated226$4,6400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1020761BRIGHT OPS (Corporation)CLEAR, Pending Case/CIT| Pending IFSC-10 Electrical ContractorNov 14, 2016Nov 30, 202633,159

License numbers are the ones the utilities recorded on the interconnection applications (33,291 of 33,294 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending suspension date of Oct 31, 2026 for license 1020761. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Bright Planet Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco1020761376054918033247
unincorporated San Diego County102076165208397400253214226172351,970
unincorporated Marin County10207610001100002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego7,749
Riverside3,827
San Bernardino3,286
Los Angeles2,636
San Joaquin2,032
Orange1,710
Contra Costa1,703
Fresno1,231
Santa Clara1,222
Solano1,040
Kern1,020
Placer804
Tulare593
Alameda566
El Dorado457
Yolo405
Ventura323
Sutter287
Sonoma274
Merced232
Butte180
Kings175
Yuba169
Madera152
Santa Barbara135
Lake108
Nevada91
Amador84
Stanislaus81
Napa73
San Luis Obispo70
Tehama61
Glenn59
Monterey56
Santa Cruz52
Calaveras50
San Mateo50
Marin47
San Benito46
Mendocino43
Shasta41
Colusa30
San Francisco20
Tuolumne11
Mariposa6
Sacramento4
Plumas2
Mono1

Top cities

CityInstalls
San Diego2,675
Stockton1,265
Chula Vista995
San Jose878
Fresno803
Antioch602
Oceanside580
Bakersfield529
Escondido498
Moreno Valley456
Palmdale443
Hemet436
Fontana421
Vacaville406
El Cajon367

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT PLANET22,773
Bright Planet Solar9,497
BRIGHT PLANET SOLAR INC984
BRIGHT PLANET SOLAR37
BRIGHT PLANET SOLAR INC.3

Common questions

Where does Bright Planet Solar install solar?

Its installs are spread across 48 counties. The most are in San Diego County (7,749 installs), followed by Riverside County (3,827).

How often does Bright Planet Solar install batteries with solar?

5.4% of its interconnected solar installs include battery storage across all years, and 15.4% in the last 24 months (24 of 156). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bright Planet Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4,858 of its 33,294 interconnected installs (14.6% of the 33,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.