BRIGHT OPS
How many solar installs has BRIGHT OPS done in California, and which license number is on its installs?
BRIGHT OPS has 15,272 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Mar 28, 2024 to Aug 31, 2026), most of them in Los Angeles County (1,740), San Bernardino County (1,724) and Riverside County (1,682). CSLB lists license 1020761 (BRIGHT OPS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 15,272
- Last 24 months
- 13,037
- Total capacity
- 95,311.1 kW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 93.8% all time; 96.1% last 24 months
- Third-party owned
- 87.3% of 15,272 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 15,225 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 13,313, lease 10, prepaid lease 1, other 1
- Median battery size
- 9.7 kWh (14,052 installs list a capacity)
- First install
- Mar 28, 2024
- Latest install
- Aug 31, 2026
- Counties
- 46
- Utilities
- PGE 8,654, SCE 6,618
- CSLB license
- 1020761
Is BRIGHT OPS still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (5,915 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2024 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2024 | 4,607 | 3,917 |
| 2025 | 7,468 | 7,251 |
| 2026 (through Aug 31, 2026) | 3,197 | 3,159 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
15,225 of its 15,272 interconnected installs (99.7% of the 15,272 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 10 | 0.1% | not counted |
| NEM 2.0 | 37 | 0.2% | 27 (73.0%) |
| Net Billing Tariff | 15,225 | 99.7% | 14,292 (93.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 13,325 of BRIGHT OPS’s installs the utility recorded a third-party ownership type: PPA 13,313, lease 10, prepaid lease 1, other 1. No residential system in the file lists a third-party owner name that matches BRIGHT OPS exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun Inc. | 8,092 |
| Everbright | 4,125 |
| Enfin | 1,078 |
| Sunlight Financial | 7 |
| Mosaic | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 13,009 of BRIGHT OPS’ 13,037 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5,500, 42.3%) used modules recorded as JA Solar.
In the last 24 months, 13,037 of BRIGHT OPS’ 13,037 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10,716, 82.2%) used inverters recorded as SolarEdge.
In the last 24 months, 12,297 of BRIGHT OPS’ 13,037 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9,085, 73.9%) used batteries recorded as SolarEdge.
14,086 of 14,327 battery-paired PG&E and SCE installs (98.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 5,500 | 5,501 |
| Qcells | 3,724 | 3,945 | |
| LONGi | 3,383 | 4,466 | |
| Canadian Solar | 445 | 1,371 | |
| REC | 15 | not in top list | |
| Inverter maker | SolarEdge | 10,716 | 12,950 |
| Tesla | 2,646 | 2,653 | |
| Enphase | 75 | 80 | |
| ABB | 15 | 15 | |
| SMA | 15 | 16 | |
| Battery maker | SolarEdge | 9,085 | 10,842 |
| Tesla | 3,214 | 3,253 | |
| Enphase | 3 | 3 | |
| LG | 3 | 3 | |
| FranklinWH | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15,239 of 15,272 installs, inverters on 15,272. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1020761 | BRIGHT OPS (Corporation) | CLEAR, Pending Case/CIT| Pending IFS | C-10 Electrical Contractor | Nov 14, 2016 | Nov 30, 2026 | 15,272 |
License numbers are the ones the utilities recorded on the interconnection applications (15,272 of 15,272 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending suspension date of Oct 31, 2026 for license 1020761. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list BRIGHT OPS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 1020761 | 3 | 7 | 6 | 0 | 5 | 4 | 9 | 180 | 33 | 247 |
| unincorporated San Diego County | 1020761 | 65 | 208 | 397 | 400 | 253 | 214 | 226 | 172 | 35 | 1,970 |
| unincorporated Marin County | 1020761 | 0 | 0 | 0 | 1 | 1 | 0 | 0 | 0 | 0 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Bright Planet Solar: 33,294 installs, license 1020761
Counties
| County | Installs |
|---|---|
| Los Angeles | 1,740 |
| San Bernardino | 1,724 |
| Riverside | 1,682 |
| Contra Costa | 1,238 |
| Alameda | 903 |
| Kern | 870 |
| Santa Clara | 694 |
| San Joaquin | 626 |
| Solano | 530 |
| Orange | 491 |
| Tulare | 474 |
| San Mateo | 463 |
| Sonoma | 374 |
| Fresno | 345 |
| Merced | 255 |
| Monterey | 203 |
| San Luis Obispo | 200 |
| Santa Barbara | 194 |
| Lake | 179 |
| Butte | 174 |
| Kings | 141 |
| Napa | 127 |
| Tuolumne | 127 |
| Placer | 125 |
| Nevada | 119 |
| Madera | 117 |
| El Dorado | 102 |
| Santa Cruz | 100 |
| Marin | 98 |
| Tehama | 86 |
| Shasta | 84 |
| San Benito | 81 |
| Calaveras | 73 |
| Yolo | 72 |
| Yuba | 66 |
| Stanislaus | 65 |
| Amador | 60 |
| Ventura | 56 |
| Sutter | 54 |
| San Francisco | 47 |
| Mendocino | 44 |
| Glenn | 24 |
| Colusa | 19 |
| Mariposa | 18 |
| Sacramento | 5 |
| Plumas | 3 |
Top cities
| City | Installs |
|---|---|
| San Jose | 534 |
| Stockton | 386 |
| Bakersfield | 347 |
| Oakland | 315 |
| Lancaster | 275 |
| Vallejo | 231 |
| Antioch | 216 |
| Fontana | 212 |
| Palmdale | 209 |
| San Bernardino | 203 |
| Hayward | 202 |
| Victorville | 196 |
| Moreno Valley | 195 |
| Richmond | 189 |
| Hemet | 177 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| BRIGHT OPS | 15,272 |
Common questions
Where does BRIGHT OPS install solar?
Its installs are spread across 46 counties. The most are in Los Angeles County (1,740 installs), followed by San Bernardino County (1,724).
How often does BRIGHT OPS install batteries with solar?
93.8% of its interconnected solar installs include battery storage across all years, and 96.1% in the last 24 months (12,527 of 13,037).
How many BRIGHT OPS installs are under NEM 3.0 (the Net Billing Tariff)?
15,225 of its 15,272 interconnected installs (99.7% of the 15,272 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.