BRIGHT OPS

How many solar installs has BRIGHT OPS done in California, and which license number is on its installs?

BRIGHT OPS has 15,272 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Mar 28, 2024 to Aug 31, 2026), most of them in Los Angeles County (1,740), San Bernardino County (1,724) and Riverside County (1,682). CSLB lists license 1020761 (BRIGHT OPS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
15,272
Last 24 months
13,037
Total capacity
95,311.1 kW DC
Median system size
5.7 kW DC
With battery storage
93.8% all time; 96.1% last 24 months
Third-party owned
87.3% of 15,272 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15,225 installs, latest Aug 31, 2026
Ownership types recorded
PPA 13,313, lease 10, prepaid lease 1, other 1
Median battery size
9.7 kWh (14,052 installs list a capacity)
First install
Mar 28, 2024
Latest install
Aug 31, 2026
Counties
46
Utilities
PGE 8,654, SCE 6,618
CSLB license
1020761

Is BRIGHT OPS still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (5,915 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20244,6073,917
20257,4687,251
2026 (through Aug 31, 2026)3,1973,159

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15,225 of its 15,272 interconnected installs (99.7% of the 15,272 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0100.1%not counted
NEM 2.0370.2%27 (73.0%)
Net Billing Tariff15,22599.7%14,292 (93.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 13,325 of BRIGHT OPS’s installs the utility recorded a third-party ownership type: PPA 13,313, lease 10, prepaid lease 1, other 1. No residential system in the file lists a third-party owner name that matches BRIGHT OPS exactly.

Third-party owner named on its installsInstalls
Sunrun Inc.8,092
Everbright4,125
Enfin1,078
Sunlight Financial7
Mosaic3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13,009 of BRIGHT OPS’ 13,037 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5,500, 42.3%) used modules recorded as JA Solar.

In the last 24 months, 13,037 of BRIGHT OPS’ 13,037 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10,716, 82.2%) used inverters recorded as SolarEdge.

In the last 24 months, 12,297 of BRIGHT OPS’ 13,037 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9,085, 73.9%) used batteries recorded as SolarEdge.

14,086 of 14,327 battery-paired PG&E and SCE installs (98.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar5,5005,501
Qcells3,7243,945
LONGi3,3834,466
Canadian Solar4451,371
REC15not in top list
Inverter makerSolarEdge10,71612,950
Tesla2,6462,653
Enphase7580
ABB1515
SMA1516
Battery makerSolarEdge9,08510,842
Tesla3,2143,253
Enphase33
LG33
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15,239 of 15,272 installs, inverters on 15,272. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1020761BRIGHT OPS (Corporation)CLEAR, Pending Case/CIT| Pending IFSC-10 Electrical ContractorNov 14, 2016Nov 30, 202615,272

License numbers are the ones the utilities recorded on the interconnection applications (15,272 of 15,272 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending suspension date of Oct 31, 2026 for license 1020761. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list BRIGHT OPS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco1020761376054918033247
unincorporated San Diego County102076165208397400253214226172351,970
unincorporated Marin County10207610001100002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles1,740
San Bernardino1,724
Riverside1,682
Contra Costa1,238
Alameda903
Kern870
Santa Clara694
San Joaquin626
Solano530
Orange491
Tulare474
San Mateo463
Sonoma374
Fresno345
Merced255
Monterey203
San Luis Obispo200
Santa Barbara194
Lake179
Butte174
Kings141
Napa127
Tuolumne127
Placer125
Nevada119
Madera117
El Dorado102
Santa Cruz100
Marin98
Tehama86
Shasta84
San Benito81
Calaveras73
Yolo72
Yuba66
Stanislaus65
Amador60
Ventura56
Sutter54
San Francisco47
Mendocino44
Glenn24
Colusa19
Mariposa18
Sacramento5
Plumas3

Top cities

CityInstalls
San Jose534
Stockton386
Bakersfield347
Oakland315
Lancaster275
Vallejo231
Antioch216
Fontana212
Palmdale209
San Bernardino203
Hayward202
Victorville196
Moreno Valley195
Richmond189
Hemet177

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT OPS15,272

Common questions

Where does BRIGHT OPS install solar?

Its installs are spread across 46 counties. The most are in Los Angeles County (1,740 installs), followed by San Bernardino County (1,724).

How often does BRIGHT OPS install batteries with solar?

93.8% of its interconnected solar installs include battery storage across all years, and 96.1% in the last 24 months (12,527 of 13,037).

How many BRIGHT OPS installs are under NEM 3.0 (the Net Billing Tariff)?

15,225 of its 15,272 interconnected installs (99.7% of the 15,272 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.