Solar installers in Vallejo, California

Most installs here are in Solano County.

Who installs the most solar in Vallejo?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Vallejo are Sunrun (286), BRIGHT OPS (210) and NORTH VALLEY LLC (62). They account for 558 of the 1,048 residential solar installs interconnected there in that window.

In all, 6,002 homes in Vallejo have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 104 installers with installs in this window. 11 installs in the window were self-installed or had no installer recorded.

1Sunrun286855
2BRIGHT OPS210231
3NORTH VALLEY LLC62148
4Tesla Energy Operations (formerly SolarCity)33786
5CONTINUUM3232
6FREEDOM FOREVER LLC30225
7AMBROSE SOLAR27135
8BETTER EARTH ELECTRIC INC24115
9Complete Solar2451
10SunPower19232
11Semper Solaris Construction Inc1880
12V3 Electric16190
13LYTEGEN1515
14FREEDOM FOREVER NORTHERN CALIFORNIA LLC1313
15GRID Alternatives1234
16AXIA SOLAR CORP1111
17Empower Electric Solar1158
18NEXT ELECTRIC917
19ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING8132
20SOLAR AND ROOF DIRECT88
21Solar Optimum Inc.830
22Nexus Energy Systems725
23High Definition Solar678
24LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC66
25PRIME HOME SOLUTIONS620

Most installs, all time

1Sunrun855855
2Tesla Energy Operations (formerly SolarCity)786786
3SunPower232232
4BRIGHT OPS231231
5Vivint Solar Developer, LLC231231
6FREEDOM FOREVER LLC225225
7V3 Electric190190
8Bright Planet Solar152152
9NORTH VALLEY LLC148148
10AMBROSE SOLAR135135

Installs by year

YearInstalls interconnectedWith battery storage
2022733115
2023669116
2024498370
2025557480
2026 (through Aug 31, 2026)305255

Under the Net Billing Tariff (NEM 3.0)

1,225 of the 6,002 residential solar installs in Vallejo (20.4% of the 6,002 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Vallejo

1Sunrun33232397.3%
2BRIGHT OPS23122798.3%
3NORTH VALLEY LLC9898100.0%
4Tesla Energy Operations (formerly SolarCity)423890.5%
5FREEDOM FOREVER LLC383694.7%
6AMBROSE SOLAR3434100.0%
7CONTINUUM3232100.0%
8BETTER EARTH ELECTRIC INC312993.5%
9V3 Electric262596.2%
10Empower Electric Solar252288.0%
11Semper Solaris Construction Inc212095.2%
12Bright Planet Solar16318.8%
13LYTEGEN141178.6%
14FREEDOM FOREVER NORTHERN CALIFORNIA LLC1313100.0%
15GRID Alternatives13646.2%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,025 of Vallejo’s 1,048 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (448, 43.7%) used modules recorded as Qcells.

In the last 24 months, 1,048 of Vallejo’s 1,048 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (511, 48.8%) used inverters recorded as Tesla.

In the last 24 months, 812 of Vallejo’s 1,048 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (443, 54.6%) used batteries recorded as Tesla.

1,339 of 1,472 battery-paired PG&E and SCE installs (91.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4481,459
JA Solar223423
LONGi117429
REC50653
Canadian Solar47436
Inverter makerTesla511784
SolarEdge2942,454
Enphase2861,828
Delta Electronics18146
Lunar Energy16not in top list
Battery makerTesla443670
SolarEdge200233
Enphase121205
Lunar Energy1616
LG13143

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,675 of 6,002 installs, inverters on 6,002. See the methodology and the equipment index.

ZIP codes in Vallejo

ZIP codes with their own page where the utilities recorded Vallejo on at least 10% of the ZIP’s installs, through Aug 31, 2026.

945913,5413,541611
945891,3791,380242
945901,0791,079195

SGIP battery storage projects in Vallejo

The SGIP report lists 234 battery storage projects with the city Vallejo, 118 with the status Paid ($493,020 in current incentive allocations, 1,683 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1181,683$493,020
Reserved185,767$3,006,363
Pending Reservation340$77,116
Cancelled747,249$5,283,354
RRF Rejected21229$35,104

Installers named on the most SGIP storage projects in Vallejo

InstallerProjectsPaid
Sunrun3420
Semper Solaris Construction Inc3013
AMBROSE SOLAR1712
SunPower1710
SOLAR 4 AMERICA159
PetersenDean149
Hooked On Solar116
Infinity Energy, Inc118
Citadel Roofing and Solar109
HAVEN ENERGY SERVICES INC102

10 of the 234 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
6,002
Last 24 months
1,048
Capacity
31.5 MW DC
Median system size
4.7 kW DC
With battery storage
24.5% all time; 85.2% last 24 months
Third-party owned
37.3% where reported
Ownership types recorded
PPA 1,852, lease 326, prepaid lease 11, other 50
Median battery size
13.5 kWh
Earliest install in data
Aug 11, 1999

Common questions

How many homes in Vallejo have solar?

6,002 residential solar systems in Vallejo were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,048 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Vallejo?

104 installer names have at least one install interconnected in Vallejo in the last 24 months, and 444 appear in the full record.

How common are batteries with new solar in Vallejo?

24.5% of the solar installs interconnected in Vallejo include battery storage across all years, and 85.2% in the last 24 months (893 of 1,048).

How many solar installs in Vallejo are under NEM 3.0?

1,225 of the 6,002 residential solar installs in Vallejo (20.4% of the 6,002 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.