BRIGHT OPS: latest installs on record in California

Is BRIGHT OPS still installing solar in California?

The most recent install credited to BRIGHT OPS in California’s interconnection data was approved in August 2026; it has 5,915 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 1020761 (BRIGHT OPS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026, the number recorded on 5,915 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 31, 2026
Last 12 complete months
5,915 installs, September 2025 through August 2026
Last 24 months
13,037 installs
All time
15,272 installs, first approved Mar 28, 2024
License on most recent installs
1020761, BRIGHT OPS, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
BRIGHT OPS installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to BRIGHT OPS
August 202647
July 2026170
June 2026247
May 2026348
April 2026564
March 2026476
February 2026627
January 2026718
December 2025683
November 2025495
October 2025689
September 2025851
Total5,915

Net Billing Tariff installs

15,225 of the installs credited to BRIGHT OPS (99.7% of the 15,272 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those include battery storage. The latest was approved Aug 31, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
20244,6073,917
20257,4687,251
2026 (through Aug 31, 2026)3,1973,159

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
1020761BRIGHT OPSCLEAR, Pending Case/CIT| Pending IFSC-10 Electrical ContractorNov 30, 20265,915

Names written on these installs: BRIGHT OPS (5,915). 5,915 of the 5,915 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

Other installer names in the records

Installer names that share a license number with BRIGHT OPS, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
Bright Planet Solarsame license 1020761August 202642533,294

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to BRIGHT OPS approved?

The latest App Approved date on an install credited to BRIGHT OPS is Aug 31, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Mar 28, 2024.

How many solar installs has BRIGHT OPS had in California in the last 12 months?

5,915 residential solar installs credited to BRIGHT OPS were approved for interconnection from September 2025 through August 2026. Across all years it has 15,272.

Does a recent install mean BRIGHT OPS is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.