Smart Energy USA

How many solar installs has Smart Energy USA done in California, and which license number is on its installs?

Smart Energy USA has 2,030 residential solar installs interconnected in California, active in the records from 2010 through 2017 (Sep 15, 2010 to Dec 15, 2017), most of them in San Diego County (855), Riverside County (367) and Los Angeles County (232). The license number recorded on most of its installs, 990049, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,030
Last 24 months
0
Total capacity
13,025.9 kW DC
Median system size
6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
70.7% of 1,394 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 9, lease 950, prepaid lease 21, other 6
First install
Sep 15, 2010
Latest install
Dec 15, 2017
Counties
35
Utilities
SCE 958, SDGE 899, PGE 173
CSLB license
990049

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
2010160
2011380
20121140
20133600
20143620
20154430
20165820
20171150
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 2,030 interconnected installs with a tariff recorded (2,030) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,91994.5%not counted
NEM 2.01115.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 986 of Smart Energy USA’s installs the utility recorded a third-party ownership type: PPA 9, lease 950, prepaid lease 21, other 6. Across all installers, 74 residential systems list a third-party owner name that matches Smart Energy USA exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunpower369
Sunrun246
SunPower Capital, LLC117
Smart Energy Solar103
Smart Energy USA74

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,703 of Smart Energy USA’s 2,030 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,039, 61.0%) used modules recorded as SunPower.

Across all years, 1,990 of Smart Energy USA’s 2,030 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (740, 37.2%) used inverters recorded as Power-One.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower01,039
REC0161
Qcells0132
SolarWorld0106
Canadian Solar083
Inverter makerPower-One0740
SMA0389
SunPower0283
ABB0215
Enphase0126

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,703 of 2,030 installs, inverters on 1,990. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990049Not found in the CSLB License Master file pulled Nov 4, 20261,100

License numbers are the ones the utilities recorded on the interconnection applications (1,109 of 2,030 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Diego855
Riverside367
Los Angeles232
San Bernardino205
Orange109
Sonoma67
Tulare41
Kern31
Ventura22
Marin18
Napa12
Fresno10
Kings6
Solano6
Sutter6
Contra Costa5
Placer5
Merced4
Yolo4
San Joaquin3
Santa Clara3
Calaveras2
El Dorado2
Santa Barbara2
Tehama2
Yuba2
Alameda1
Colusa1
Humboldt1
Inyo1
Madera1
Monterey1
San Luis Obispo1
San Mateo1
Tuolumne1

Top cities

CityInstalls
San Diego200
Escondido96
Vista81
Corona62
Carlsbad45
Chula Vista45
San Marcos45
Murrieta40
Temecula38
Oceanside37
El Cajon32
Fallbrook31
Valley Center29
Apple Valley28
Moreno Valley28

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Smart Energy USA1,771
SMART ENERGY USA237
smart energy usa17
Smart Energy, USA2
smart energy USA1
smart Energy USA1
Smart Energy Usa1

Common questions

Where does Smart Energy USA install solar?

Its installs are spread across 35 counties. The most are in San Diego County (855 installs), followed by Riverside County (367).

How often does Smart Energy USA install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Smart Energy USA installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 2,030 interconnected installs with a tariff recorded (2,030) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.