Smart Energy Solar
How many solar installs has Smart Energy Solar done in California, and which license number is on its installs?
Smart Energy Solar has 837 residential solar installs interconnected in California, active in the records from 2011 through 2018 (May 12, 2011 to Aug 7, 2018), most of them in Kern County (118), Fresno County (100) and Los Angeles County (96). The license number recorded on most of its installs, 990049, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 837
- Last 24 months
- 0
- Total capacity
- 5,193.3 kW DC
- Median system size
- 5.6 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 44.1% of 657 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 40, lease 247, prepaid lease 3
- First install
- May 12, 2011
- Latest install
- Aug 7, 2018
- Counties
- 44
- Utilities
- PGE 548, SCE 289
- CSLB license
- 990049, 942329
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 6 | 0 |
| 2012 | 0 | 0 |
| 2013 | 3 | 0 |
| 2014 | 185 | 0 |
| 2015 | 271 | 0 |
| 2016 | 182 | 0 |
| 2017 | 185 | 0 |
| 2018 | 5 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 837 interconnected installs with a tariff recorded (837) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 647 | 77.3% | not counted |
| NEM 2.0 | 190 | 22.7% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 290 of Smart Energy Solar’s installs the utility recorded a third-party ownership type: PPA 40, lease 247, prepaid lease 3, other 0. Across all installers, 117 residential systems list a third-party owner name that matches Smart Energy Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunpower | 108 |
| Sunrun | 96 |
| Spruce | 40 |
| Smart Energy Solar | 14 |
| sun run | 13 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 632 of Smart Energy Solar’s 837 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (184, 29.1%) used modules recorded as SunPower.
Across all years, 837 of Smart Energy Solar’s 837 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (282, 33.7%) used inverters recorded as Power-One.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 0 | 184 |
| REC | 0 | 131 | |
| Qcells | 0 | 93 | |
| Canadian Solar | 0 | 89 | |
| Hyundai | 0 | 30 | |
| Inverter maker | Power-One | 0 | 282 |
| SMA | 0 | 187 | |
| ABB | 0 | 144 | |
| SolarEdge | 0 | 78 | |
| Solis (Ginlong) | 0 | 61 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 632 of 837 installs, inverters on 837. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 990049 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 809 | ||||
| 942329 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 19 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (830 of 837 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- Smart Energy USA: 2,030 installs, license 990049
- SMART ENERGY: 617 installs, license 990049
Counties
Top cities
| City | Installs |
|---|---|
| Bakersfield | 95 |
| Fresno | 53 |
| West Covina | 23 |
| Yuba City | 22 |
| Vacaville | 15 |
| Corona | 12 |
| Apple Valley | 11 |
| El Dorado Hills | 11 |
| Hemet | 11 |
| Lincoln | 11 |
| Salinas | 11 |
| San Jose | 11 |
| Fontana | 10 |
| Stockton | 10 |
| Merced | 9 |
Names as recorded by the utilities
The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Smart Energy Solar | 426 |
| Smart Energy Solar, Inc. | 146 |
| SMART ENERGY SOLAR | 107 |
| smart energy solar | 106 |
| Smart Energy Solar Inc. | 14 |
| Smart energy solar | 10 |
| Smart Energy Solar, Inc | 9 |
| Smart Energy solar | 6 |
| Smart energy Solar | 5 |
| Smart Energy SOlar | 3 |
| Smart Energy Solar Inc | 2 |
| SMART ENERGY SOLAR INC | 2 |
| SMART ENERGY SOLAR, INC | 1 |
Common questions
Where does Smart Energy Solar install solar?
Its installs are spread across 44 counties. The most are in Kern County (118 installs), followed by Fresno County (100).
How often does Smart Energy Solar install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Smart Energy Solar installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 837 interconnected installs with a tariff recorded (837) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.