Empower Electric Solar

How many solar installs has Empower Electric Solar done in California, and which license number is on its installs?

Empower Electric Solar has 10,965 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Dec 16, 2019 to Aug 31, 2026), most of them in Fresno County (2,879), San Joaquin County (990) and Los Angeles County (795). CSLB lists license 1057693 (EMPOWER HOME SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
10,965
Last 24 months
3,090
Total capacity
79,686.7 kW DC
Median system size
6.6 kW DC
With battery storage
42.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 97.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 10,928 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4,499 installs, latest Aug 31, 2026
Ownership types recorded
PPA 59, prepaid lease 1
Median battery size
10 kWh (1,182 installs list a capacity)
First install
Dec 16, 2019
Latest install
Aug 31, 2026
Counties
43
Utilities
PGE 7,836, SCE 2,886, SDGE 243
CSLB license
1057693

Is Empower Electric Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1,196 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
20204970
20211,7795
20222,07315
20231,992457
20242,3202,024
20251,5171,381
2026 (through Aug 31, 2026)784711

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4,499 of its 10,965 interconnected installs (41.2% of the 10,928 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02682.5%not counted
NEM 2.06,16156.4%429 (7.0%)
Net Billing Tariff4,49941.2%3,897 (90.3%)
Not recorded37

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 60 of Empower Electric Solar’s installs the utility recorded a third-party ownership type: PPA 59, lease 0, prepaid lease 1, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Empower Electric Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun28
EverBright25
Sunnova3
Goodleap2
EVERFIX1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2,555 of Empower Electric Solar’s 3,090 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,812, 70.9%) used modules recorded as Qcells.

In the last 24 months, 3,053 of Empower Electric Solar’s 3,090 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2,781, 91.1%) used inverters recorded as Enphase.

In the last 24 months, 2,348 of Empower Electric Solar’s 3,090 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,755, 74.7%) used batteries recorded as Enphase.

4,046 of 4,593 battery-paired PG&E and SCE installs (88.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,8122,808
JA Solar4521,828
Elin Energy192not in top list
Trina Solar1332,151
LONGi482,418
Inverter makerEnphase2,7819,091
Tesla546639
SolarEdge3061,678
ABB74145
SMA60not in top list
Battery makerEnphase1,7553,442
Tesla589590
FranklinWH910
SolarEdge57
LG410

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 9,666 of 10,965 installs, inverters on 10,928. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Empower Electric Solar as developer on 7 battery storage projects and as installer on 7 (7 name it as both), 7 projects in all with 148 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 7, 2023 to Sep 10, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Pending Reservation479$71,049
Cancelled259$31,303
RRF Rejected110$1,303

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU479$71,0490$0
Equity Resiliency140$30,0000$0
Small Residential Storage119$1,3030$0
Not stated110$1,3030$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1057693EMPOWER HOME SERVICES (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorSep 3, 2019Sep 30, 202710,926

License numbers are the ones the utilities recorded on the interconnection applications (10,927 of 10,965 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1057693. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Empower Electric Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202020212023202420252026Total
unincorporated San Diego County1057693391318271383

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Fresno2,879
San Joaquin990
Los Angeles795
Kern772
Contra Costa751
Tulare683
San Bernardino623
Riverside544
Merced442
Madera408
Alameda338
Solano249
San Diego218
Kings206
Orange174
Yolo161
Placer132
Santa Clara90
Napa87
Yuba77
Stanislaus73
El Dorado55
Sutter50
Tuolumne32
Calaveras22
Mariposa18
Butte12
Nevada11
San Luis Obispo11
Amador9
San Mateo9
Ventura8
Colusa7
Marin6
Santa Barbara6
Sonoma6
Monterey3
San Benito2
Santa Cruz2
Glenn1
Lake1
Sacramento1
Tehama1

Top cities

CityInstalls
Fresno1,877
Bakersfield570
Stockton518
Clovis451
Madera314
Visalia217
Antioch196
Lancaster185
Tracy185
Manteca179
Merced156
Pittsburg143
Palmdale142
Tulare134
San Bernardino123

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EMPOWER ELECTRIC SOLAR8,580
EMPOWER HOME SERVICES1,050
EMPOWER SOLAR INC DBA EMPOWER ELECTRIC SOLAR1,035
EMPOWER SOLAR INC292
Empower Solar INC4
Empower Solar3
empower solar1

Common questions

Where does Empower Electric Solar install solar?

Its installs are spread across 43 counties. The most are in Fresno County (2,879 installs), followed by San Joaquin County (990).

How often does Empower Electric Solar install batteries with solar?

42.8% of its interconnected solar installs include battery storage across all years, and 97.5% in the last 24 months (2,829 of 2,901). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Empower Electric Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4,499 of its 10,965 interconnected installs (41.2% of the 10,928 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.