Premier Power

How many solar installs has Premier Power done in California, and which license number is on its installs?

Premier Power has 322 residential solar installs interconnected in California, active in the records from 2002 through 2017 (May 16, 2002 to Apr 4, 2017), most of them in Placer County (59), El Dorado County (50) and Yolo County (38). The license number recorded on most of its installs, 831223, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
322
Last 24 months
0
Total capacity
1,907.1 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.3% of 316 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 1
First install
May 16, 2002
Latest install
Apr 4, 2017
Counties
35
Utilities
PGE 239, SCE 83
CSLB license
831223

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200260
200390
2004180
200540
2006220
2007720
2008820
2009670
2010200
2011170
201230
201310
201400
201500
201600
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 322 interconnected installs with a tariff recorded (322) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032199.7%not counted
NEM 2.010.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Premier Power’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Premier Power exactly.

Third-party owner named on its installsInstalls
Premier Power Renewable Energy, Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 229 of Premier Power’s 322 installs name a module maker in the “Generator Manufacturer” fields, and most of those (142, 62.0%) used modules recorded as Sharp.

Across all years, 322 of Premier Power’s 322 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (182, 56.5%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp0142
General Electric044
Astro Power, Inc027
Suntech08
SunPower04
Inverter makerFronius0182
SMA079
General Electric023
Enphase020
SunPower013

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 229 of 322 installs, inverters on 322. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
831223Not found in the CSLB License Master file pulled Nov 4, 202683

License numbers are the ones the utilities recorded on the interconnection applications (84 of 322 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Placer59
El Dorado50
Yolo38
Los Angeles33
Orange28
San Joaquin14
Riverside12
Contra Costa11
Napa10
San Bernardino8
Santa Clara7
Sutter6
Alameda5
Solano5
Calaveras4
Yuba4
Glenn3
Sonoma3
Butte2
Marin2
Nevada2
San Luis Obispo2
Ventura2
Amador1
Colusa1
Fresno1
Lake1
Madera1
Merced1
Monterey1
Sacramento1
San Francisco1
San Mateo1
Stanislaus1
Tulare1

Top cities

CityInstalls
El Dorado Hills20
Woodland19
Lincoln17
Granite Bay12
Shingle Springs10
Auburn9
Corona8
Loomis7
Rocklin7
Cameron Park6
Davis6
Napa6
Newcastle6
San Jose5
Yuba City5

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Premier Power230
PREMIER POWER89
Premier POwer1
Premier Power Inc1
Premier Power, LLC1

Common questions

Where does Premier Power install solar?

Its installs are spread across 35 counties. The most are in Placer County (59 installs), followed by El Dorado County (50).

How often does Premier Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Premier Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 322 interconnected installs with a tariff recorded (322) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.