Solar installers in Davis, California
Most installs here are in Yolo County.
Who installs the most solar in Davis?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Davis are West Coast Solar (111), Sunrun (68) and Citadel Roofing and Solar (51). They account for 230 of the 515 residential solar installs interconnected there in that window.
In all, 6,121 homes in Davis have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 86 installers with installs in this window. 13 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | West Coast Solar | 890 | 890 |
| 2 | SunPower Corporation - Merideth | 532 | 532 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 463 | 463 |
| 4 | SunPower | 453 | 453 |
| 5 | Sunrun | 421 | 421 |
| 6 | Citadel Roofing and Solar | 145 | 145 |
| 7 | REC Solar, Inc. | 123 | 123 |
| 8 | Hooked On Solar | 115 | 115 |
| 9 | AMBROSE SOLAR | 114 | 114 |
| 10 | Vivint Solar Developer, LLC | 101 | 101 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 571 | 74 |
| 2023 | 736 | 84 |
| 2024 | 286 | 130 |
| 2025 | 301 | 180 |
| 2026 (through Aug 31, 2026) | 147 | 90 |
Under the Net Billing Tariff (NEM 3.0)
551 of the 6,121 residential solar installs in Davis (9.0% of the 6,121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Davis
| 1 | West Coast Solar | 126 | 29 | 23.0% |
| 2 | Sunrun | 89 | 87 | 97.8% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 41 | 37 | 90.2% |
| 4 | AMBROSE SOLAR | 21 | 20 | 95.2% |
| 5 | V3 Electric | 20 | 19 | 95.0% |
| 6 | Citadel Roofing and Solar | 15 | 10 | 66.7% |
| 7 | Empower Electric Solar | 10 | 9 | 90.0% |
| 8 | FIVE STAR SOLAR | 10 | 10 | 100.0% |
| 9 | NORTH VALLEY LLC | 10 | 10 | 100.0% |
| 10 | Capital City Solar Electric | 9 | 4 | 44.4% |
| 11 | FREEDOM FOREVER LLC | 9 | 8 | 88.9% |
| 12 | NRG Clean Power | 9 | 8 | 88.9% |
| 13 | Future Energy Corporation | 8 | 8 | 100.0% |
| 14 | Solectric | 8 | 5 | 62.5% |
| 15 | SunPower | 8 | 4 | 50.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 463 of Davis’ 515 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (145, 31.3%) used modules recorded as REC.
In the last 24 months, 515 of Davis’ 515 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (284, 55.1%) used inverters recorded as Enphase.
In the last 24 months, 247 of Davis’ 515 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (141, 57.1%) used batteries recorded as Tesla.
516 of 663 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 145 | 501 |
| Qcells | 118 | 908 | |
| JA Solar | 62 | 148 | |
| Silfab | 35 | not in top list | |
| LONGi | 23 | not in top list | |
| Inverter maker | Enphase | 284 | 1,697 |
| Tesla | 182 | 414 | |
| SolarEdge | 60 | 1,721 | |
| SMA | 31 | 820 | |
| FranklinWH | 22 | not in top list | |
| Battery maker | Tesla | 141 | 284 |
| Enphase | 61 | 101 | |
| FranklinWH | 21 | 22 | |
| SolarEdge | 9 | 29 | |
| Generac | 8 | 16 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,620 of 6,121 installs, inverters on 6,121. See the methodology and the equipment index.
ZIP codes in Davis
ZIP codes with their own page where the utilities recorded Davis on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Davis
The SGIP report lists 147 battery storage projects with the city Davis, 110 with the status Paid ($402,596 in current incentive allocations, 1,886 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 110 | 1,886 | $402,596 |
| PBI in Process | 2 | 622 | $195,660 |
| Reserved | 4 | 2,754 | $2,043,626 |
| Pending Reservation | 2 | 2,953 | $2,114,542 |
| Cancelled | 24 | 18,186 | $13,501,799 |
| RRF Rejected | 5 | 74 | $12,579 |
Installers named on the most SGIP storage projects in Davis
18 of the 147 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Davis is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 6,121
- Last 24 months
- 515
- Capacity
- 35.6 MW DC
- Median system size
- 4.8 kW DC
- With battery storage
- 10.8% all time; 60.2% last 24 months
- Third-party owned
- 10.2% where reported
- Ownership types recorded
- PPA 497, lease 107, prepaid lease 7, other 11
- Median battery size
- 13.5 kWh
- Earliest install in data
- May 28, 1999
Common questions
How many homes in Davis have solar?
6,121 residential solar systems in Davis were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 515 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Davis?
86 installer names have at least one install interconnected in Davis in the last 24 months, and 462 appear in the full record.
How common are batteries with new solar in Davis?
10.8% of the solar installs interconnected in Davis include battery storage across all years, and 60.2% in the last 24 months (310 of 515).
How many solar installs in Davis are under NEM 3.0?
551 of the 6,121 residential solar installs in Davis (9.0% of the 6,121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.