Solar installers in Davis, California

Most installs here are in Yolo County.

Who installs the most solar in Davis?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Davis are West Coast Solar (111), Sunrun (68) and Citadel Roofing and Solar (51). They account for 230 of the 515 residential solar installs interconnected there in that window.

In all, 6,121 homes in Davis have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 86 installers with installs in this window. 13 installs in the window were self-installed or had no installer recorded.

1West Coast Solar111890
2Sunrun68421
3Citadel Roofing and Solar51145
4Tesla Energy Operations (formerly SolarCity)28463
5AMBROSE SOLAR18114
6Capital City Solar Electric1243
7V3 Electric1250
8NORTH VALLEY LLC1016
9Sunriver Solar99
10NRG Clean Power821
11Aztec Solar Inc744
12BETTER EARTH ELECTRIC INC719
13FREEDOM FOREVER LLC740
14Sierra Pacific Home & Comfort781
15FIVE STAR SOLAR626
16Solectric636
17Westhaven Inc631
18Future Energy Corporation597
19Hooked On Solar5115
20VOLT MODERN ROOFING AND SOLAR55
21CONNECTED TECHNOLOGY49
22Element Electric Inc427
23FREEDOM FOREVER NORTHERN CALIFORNIA LLC44
24Greiner Heating Air Solar Energy Inc456
25LIFESTYLE SOLAR ELECTRIC44

Most installs, all time

1West Coast Solar890890
2SunPower Corporation - Merideth532532
3Tesla Energy Operations (formerly SolarCity)463463
4SunPower453453
5Sunrun421421
6Citadel Roofing and Solar145145
7REC Solar, Inc.123123
8Hooked On Solar115115
9AMBROSE SOLAR114114
10Vivint Solar Developer, LLC101101

Installs by year

YearInstalls interconnectedWith battery storage
202257174
202373684
2024286130
2025301180
2026 (through Aug 31, 2026)14790

Under the Net Billing Tariff (NEM 3.0)

551 of the 6,121 residential solar installs in Davis (9.0% of the 6,121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Davis

1West Coast Solar1262923.0%
2Sunrun898797.8%
3Tesla Energy Operations (formerly SolarCity)413790.2%
4AMBROSE SOLAR212095.2%
5V3 Electric201995.0%
6Citadel Roofing and Solar151066.7%
7Empower Electric Solar10990.0%
8FIVE STAR SOLAR1010100.0%
9NORTH VALLEY LLC1010100.0%
10Capital City Solar Electric9444.4%
11FREEDOM FOREVER LLC9888.9%
12NRG Clean Power9888.9%
13Future Energy Corporation88100.0%
14Solectric8562.5%
15SunPower8450.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 463 of Davis’ 515 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (145, 31.3%) used modules recorded as REC.

In the last 24 months, 515 of Davis’ 515 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (284, 55.1%) used inverters recorded as Enphase.

In the last 24 months, 247 of Davis’ 515 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (141, 57.1%) used batteries recorded as Tesla.

516 of 663 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC145501
Qcells118908
JA Solar62148
Silfab35not in top list
LONGi23not in top list
Inverter makerEnphase2841,697
Tesla182414
SolarEdge601,721
SMA31820
FranklinWH22not in top list
Battery makerTesla141284
Enphase61101
FranklinWH2122
SolarEdge929
Generac816

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,620 of 6,121 installs, inverters on 6,121. See the methodology and the equipment index.

ZIP codes in Davis

ZIP codes with their own page where the utilities recorded Davis on at least 10% of the ZIP’s installs, through Aug 31, 2026.

956164,0044,006308
956182,1122,292224

SGIP battery storage projects in Davis

The SGIP report lists 147 battery storage projects with the city Davis, 110 with the status Paid ($402,596 in current incentive allocations, 1,886 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1101,886$402,596
PBI in Process2622$195,660
Reserved42,754$2,043,626
Pending Reservation22,953$2,114,542
Cancelled2418,186$13,501,799
RRF Rejected574$12,579

Installers named on the most SGIP storage projects in Davis

InstallerProjectsPaid
Citadel Roofing and Solar2120
Hooked On Solar2118
JAJ Roofing dba Citadel Roofing & Solar2120
Sunrun1111
AMBROSE SOLAR109
SWELL SERVICES INC DBA SWELL CONTRACTORS98
PetersenDean53
Semper Solaris Construction Inc54
SOLAR 4 AMERICA53
Tesla55

18 of the 147 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Davis is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
6,121
Last 24 months
515
Capacity
35.6 MW DC
Median system size
4.8 kW DC
With battery storage
10.8% all time; 60.2% last 24 months
Third-party owned
10.2% where reported
Ownership types recorded
PPA 497, lease 107, prepaid lease 7, other 11
Median battery size
13.5 kWh
Earliest install in data
May 28, 1999

Common questions

How many homes in Davis have solar?

6,121 residential solar systems in Davis were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 515 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Davis?

86 installer names have at least one install interconnected in Davis in the last 24 months, and 462 appear in the full record.

How common are batteries with new solar in Davis?

10.8% of the solar installs interconnected in Davis include battery storage across all years, and 60.2% in the last 24 months (310 of 515).

How many solar installs in Davis are under NEM 3.0?

551 of the 6,121 residential solar installs in Davis (9.0% of the 6,121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.