GCI Solar

How many solar installs has GCI Solar done in California, and which license number is on its installs?

GCI Solar has 1,615 residential solar installs interconnected in California, active in the records from 2012 through 2018 (Sep 6, 2012 to Oct 25, 2018), most of them in Kern County (177), Fresno County (163) and Riverside County (146). The license number recorded on most of its installs, 1004645, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,615
Last 24 months
0
Total capacity
9,055.7 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
24.5% of 1,136 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 87, lease 191
First install
Sep 6, 2012
Latest install
Oct 25, 2018
Counties
39
Utilities
PGE 1,071, SCE 540, SDGE 4
CSLB license
1004645, 971660, 1000000

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012600
20132110
20145450
20154760
20161700
20171460
201870
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,615 interconnected installs with a tariff recorded (1,615) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,49892.8%not counted
NEM 2.01177.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 278 of GCI Solar’s installs the utility recorded a third-party ownership type: PPA 87, lease 191, prepaid lease 0, other 0. Across all installers, 7 residential systems list a third-party owner name that matches GCI Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNNOVA134
SUNRUN67
CLEAN POWER FINANCE50
CLEAN POWER FINANCE/SPRUCE22
CPF2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,127 of GCI Solar’s 1,615 installs name a module maker in the “Generator Manufacturer” fields, and most of those (678, 60.2%) used modules recorded as LG.

Across all years, 1,611 of GCI Solar’s 1,615 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (981, 60.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0678
Sharp0354
Trina Solar090
Qcells04
Canadian Solar01
Inverter makerEnphase0981
SMA0629
Power-One01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,127 of 1,615 installs, inverters on 1,611. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1004645Not found in the CSLB License Master file pulled Nov 4, 2026732
971660Not found in the CSLB License Master file pulled Nov 4, 2026521
1000000Not found in the CSLB License Master file pulled Nov 4, 202680

License numbers are the ones the utilities recorded on the interconnection applications (1,333 of 1,615 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Kern177
Fresno163
Riverside146
Los Angeles120
San Bernardino88
Orange75
Contra Costa67
Monterey67
Tulare65
San Joaquin63
Alameda61
Santa Clara54
Merced52
Madera48
Santa Cruz37
Sonoma37
Solano36
San Mateo27
Kings26
Placer26
Yolo25
Mariposa22
El Dorado20
Marin20
Sutter18
Calaveras13
Yuba13
Napa12
Ventura11
San Benito9
Amador5
San Luis Obispo3
Santa Barbara2
Stanislaus2
Butte1
Lake1
Nevada1
Sacramento1
San Diego1

Top cities

CityInstalls
Bakersfield123
Fresno91
Stockton35
Salinas30
Madera28
Palm Springs25
Merced23
San Jose23
Visalia23
Clovis20
Murrieta19
Mariposa17
Oakland17
Lancaster15
Yuba City15

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GCI SOLAR1,319
GCI Solar234
GCI SOLAR LLC61
GCI SOLAR, LLC1

Common questions

Where does GCI Solar install solar?

Its installs are spread across 39 counties. The most are in Kern County (177 installs), followed by Fresno County (163).

How often does GCI Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GCI Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,615 interconnected installs with a tariff recorded (1,615) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.