Evergreen Builders
How many solar installs has Evergreen Builders done in California, and which license number is on its installs?
Evergreen Builders has 349 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Mar 14, 2018 to Aug 27, 2026), most of them in Merced County (54), Contra Costa County (47) and San Joaquin County (45). CSLB lists license 1067368 (EVERGREEN BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 349
- Last 24 months
- 82
- Total capacity
- 2,564 kW DC
- Median system size
- 6.8 kW DC
- With battery storage
- 26.9% all time; 84.1% last 24 months
- Third-party owned
- 11.7% of 349 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 143 installs, latest Aug 27, 2026
- Ownership types recorded
- PPA 2, lease 36, prepaid lease 2, other 1
- Median battery size
- 8.4 kWh (18 installs list a capacity)
- First install
- Mar 14, 2018
- Latest install
- Aug 27, 2026
- Counties
- 29
- Utilities
- PGE 261, SCE 88
- CSLB license
- 1067368
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 1 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 10 | 0 |
| 2022 | 83 | 0 |
| 2023 | 147 | 6 |
| 2024 | 32 | 25 |
| 2025 | 22 | 18 |
| 2026 (through Aug 31, 2026) | 54 | 45 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
143 of its 349 interconnected installs (41.0% of the 349 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 206 | 59.0% | 4 (1.9%) |
| Net Billing Tariff | 143 | 41.0% | 90 (62.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 41 of Evergreen Builders’s installs the utility recorded a third-party ownership type: PPA 2, lease 36, prepaid lease 2, other 1. No residential system in the file lists a third-party owner name that matches Evergreen Builders exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Concert Finance | 36 |
| CONCERT | 1 |
| Concert / Propel | 1 |
| Sun Power | 1 |
| Sunlight | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 81 of Evergreen Builders’ 82 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 50.6%) used modules recorded as Qcells.
In the last 24 months, 82 of Evergreen Builders’ 82 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (82, 100.0%) used inverters recorded as Enphase.
In the last 24 months, 72 of Evergreen Builders’ 82 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (69, 95.8%) used batteries recorded as Enphase.
93 of 94 battery-paired PG&E and SCE installs (98.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 41 | 60 |
| Aptos Solar | 13 | 37 | |
| LONGi | 11 | not in top list | |
| JinkoSolar | 9 | not in top list | |
| JA Solar | 7 | not in top list | |
| Inverter maker | Enphase | 82 | 314 |
| SolarEdge | 7 | 25 | |
| SunPower | 7 | 16 | |
| ABB | 5 | 6 | |
| FranklinWH | 2 | not in top list | |
| Battery maker | Enphase | 69 | 90 |
| FranklinWH | 2 | 2 | |
| Tesla | 2 | 2 | |
| SolarEdge | 1 | 1 | |
| SunPower | 1 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 346 of 349 installs, inverters on 349. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1067368 | EVERGREEN BUILDERS (Corporation) | CLEAR, 7073E Probation | B General Building Contractor; C-10 Electrical Contractor | Jul 28, 2020 | Jul 31, 2028 | 348 |
License numbers are the ones the utilities recorded on the interconnection applications (349 of 349 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1067368. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Evergreen Builders’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | 2026 | Total |
|---|---|---|---|---|
| City and County of San Francisco | 1067368 | 0 | 1 | 1 |
| unincorporated San Diego County | 1067368 | 1 | 0 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
Top cities
| City | Installs |
|---|---|
| Stockton | 22 |
| Dos Palos | 21 |
| Atwater | 18 |
| Bakersfield | 13 |
| Tracy | 13 |
| Oakley | 10 |
| Fresno | 9 |
| Pittsburg | 8 |
| Antioch | 7 |
| Madera | 7 |
| Newman | 7 |
| Riverbank | 6 |
| San Jose | 6 |
| Lancaster | 5 |
| Livingston | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| EVERGREEN BUILDERS | 311 |
| Evergreen Builders | 38 |
Common questions
Where does Evergreen Builders install solar?
Its installs are spread across 29 counties. The most are in Merced County (54 installs), followed by Contra Costa County (47).
How often does Evergreen Builders install batteries with solar?
26.9% of its interconnected solar installs include battery storage across all years, and 84.1% in the last 24 months (69 of 82).
How many Evergreen Builders installs are under NEM 3.0 (the Net Billing Tariff)?
143 of its 349 interconnected installs (41.0% of the 349 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.