GRID Alternatives

How many solar installs has GRID Alternatives done in California, and which license number is on its installs?

GRID Alternatives has 13,679 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Mar 2, 2006 to Aug 31, 2026), most of them in Tulare County (1,622), Los Angeles County (1,482) and San Diego County (1,157). CSLB lists license 867533 (GRID ALTERNATIVES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to GRID Alternatives here carry more than one CSLB license number: 867533 on 9,428 (CSLB holder GRID ALTERNATIVES, Oakland) and 984380 on 1,809 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
13,679
Last 24 months
1,248
Total capacity
51,647.3 kW DC
Median system size
3.6 kW DC
With battery storage
5.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 60.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
64.4% of 11,458 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1,783 installs, latest Aug 31, 2026
Ownership types recorded
PPA 4,425, lease 2, prepaid lease 20, other 2,931
Median battery size
13.5 kWh (618 installs list a capacity)
First install
Mar 2, 2006
Latest install
Aug 31, 2026
Counties
44
Utilities
PGE 6,624, SCE 5,891, SDGE 1,164
CSLB license
867533, 984380

Is GRID Alternatives still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (805 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
2006160
2007480
2008570
20091000
20102690
20115870
20121,1340
20139620
20148390
20159380
20168840
20171,1970
20181,0670
20199410
20207000
20216400
20227274
20237410
202474826
2025626458
2026 (through Aug 31, 2026)458250

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1,783 of its 13,679 interconnected installs (13.0% of the 13,679 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05,97443.7%not counted
NEM 2.05,92243.3%29 (0.5%)
Net Billing Tariff1,78313.0%706 (40.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 7,378 of GRID Alternatives’s installs the utility recorded a third-party ownership type: PPA 4,425, lease 2, prepaid lease 20, other 2,931. Across all installers, 793 residential systems list a third-party owner name that matches GRID Alternatives exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun4,763
GRID Alternatives793
Sunrun Financing, LLC.575
Kilowatt Financial LLC476
Kilowatt Systems LLC221

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1,240 of GRID Alternatives’ 1,248 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (498, 40.2%) used modules recorded as JA Solar.

In the last 24 months, 1,248 of GRID Alternatives’ 1,248 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (647, 51.8%) used inverters recorded as Enphase.

In the last 24 months, 734 of GRID Alternatives’ 1,248 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (579, 78.9%) used batteries recorded as Tesla.

729 of 738 battery-paired PG&E and SCE installs (98.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar4981,325
Canadian Solar3661,879
Trina Solar1462,068
Silfab91not in top list
Elin Energy57not in top list
Inverter makerEnphase6478,066
Tesla597644
SolarEdge121,648
ABB1not in top list
Fronius1not in top list
Battery makerTesla579579
Enphase154154
Telsa11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 11,638 of 13,679 installs, inverters on 13,481. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GRID Alternatives as developer on 1,288 battery storage projects and as installer on 1,267 (1,261 name it as both), 1,294 projects in all with 20,333 kWh of storage. 682 have the status Paid, with $10,062,344 in current incentive allocations. Applications were received from May 1, 2017 to Nov 13, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid68210,019$10,062,344
Reserved4046,843$8,731,480
Pending Reservation22304$639,794
Waitlist8110$196,004
Cancelled1783,056$2,757,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity5198,418$7,174,529321$4,306,800
Residential Solar and Storage Equity - Ratepayer2994,021$4,407,823198$2,912,870
Residential Solar and Storage Equity - AB 209 Non-POU2473,308$5,271,800135$2,305,718
Residential Solar and Storage Equity - AB 2091672,373$3,072,55919$313,234
Residential Solar and Storage Equity - AB 209 POU34449$957,5690$0
Equity Resiliency19891$866,2569$223,721
Non-Residential Storage Equity7829$624,5620$0
Large-Scale Storage139$9,8010$0
Small Residential Storage15$1,7220$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
867533GRID ALTERNATIVES (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 14, 2005Nov 30, 20279,428
984380Not found in the CSLB License Master file pulled Nov 4, 20261,809

License numbers are the ones the utilities recorded on the interconnection applications (11,328 of 13,679 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 867533. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GRID Alternatives’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco86753316271024224572
unincorporated San Diego County86753329010000012
unincorporated Marin County8675330000000101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Tulare1,622
Los Angeles1,482
San Diego1,157
Contra Costa1,091
Riverside1,070
San Bernardino1,015
Fresno899
San Joaquin851
Monterey581
Alameda407
San Francisco318
Kern268
Inyo244
San Luis Obispo244
Ventura226
Merced206
Santa Clara177
Butte170
Kings164
Mendocino154
Madera145
Orange138
San Mateo135
Tehama113
Sonoma97
Lake86
Santa Barbara83
Humboldt81
Glenn70
San Benito65
Yolo61
Solano59
Shasta57
Santa Cruz35
Sutter26
Marin21
Yuba21
Mono10
Stanislaus9
Placer8
Napa5
Nevada5
Tuolumne2
Calaveras1

Top cities

CityInstalls
Richmond766
San Diego660
Stockton606
Fresno489
Visalia342
Porterville334
San Francisco318
Oakland307
Lindsay291
Long Beach287
Los Angeles227
Bishop223
Desert Hot Springs209
San Bernardino203
Ontario193

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GRID ALTERNATIVES6,337
GRID Alternatives3,831
Grid Alternatives3,498
GRID alternatives5
GRID ALternatives3
GRID-ALTERNATIVES2
Grid alternatives1
GrID Alternatives1
GRID Alternatives, Inc1

Common questions

Where does GRID Alternatives install solar?

Its installs are spread across 44 counties. The most are in Tulare County (1,622 installs), followed by Los Angeles County (1,482).

How often does GRID Alternatives install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years, and 60.8% in the last 24 months (734 of 1,207). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GRID Alternatives installs are under NEM 3.0 (the Net Billing Tariff)?

1,783 of its 13,679 interconnected installs (13.0% of the 13,679 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.