Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Yucaipa are Sunrun (129), SunPower (52) and BRIGHT OPS (38). They account for 219 of the 594 residential solar installs interconnected there in that window.
In all, 4,527 homes in Yucaipa have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 103 installers with installs in this window. 18 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 129 | 502 |
| 2 | SunPower | 52 | 174 |
| 3 | BRIGHT OPS | 38 | 43 |
| 4 | Citadel Roofing and Solar | 32 | 65 |
| 5 | Current Home | 28 | 170 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 28 | 271 |
| 7 | V3 Electric | 27 | 36 |
| 8 | FREEDOM FOREVER LLC | 17 | 103 |
| 9 | TIMEPROOFUSA | 12 | 12 |
| 10 | SolarMax Renewable Energy Provider, Inc | 10 | 116 |
| 11 | BURGESONS HEATING AND AIR CONDITIONING INC | 8 | 52 |
| 12 | APOLLO HOME POWER LLC | 7 | 7 |
| 13 | Semper Solaris Construction Inc | 7 | 76 |
| 14 | BRYTON POWER LLC | 6 | 6 |
| 15 | EXO Energy | 6 | 10 |
| 16 | IDA CONSULTANTS INC | 6 | 6 |
| 17 | MARS BUILDER SOLUTIONS | 6 | 6 |
| 18 | Complete Solar | 5 | 29 |
| 19 | DEMAND CONSTRUCTION | 5 | 5 |
| 20 | New Day Solar | 5 | 18 |
| 21 | Option One Solar | 5 | 14 |
| 22 | Powur PBC (Powur Home) | 5 | 49 |
| 23 | SUNNOVA ENERGY CORPORATION | 5 | 133 |
| 24 | Blalock electric | 4 | 22 |
| 25 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 4 | 69 |
Most installs, all time
| 1 | Sunrun | 502 | 502 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 271 | 271 |
| 3 | Vivint Solar Developer, LLC | 234 | 234 |
| 4 | SunPower | 174 | 174 |
| 5 | Current Home | 170 | 170 |
| 6 | Horizon Solar Power | 163 | 163 |
| 7 | SUNNOVA ENERGY CORPORATION | 133 | 133 |
| 8 | Bright Planet Solar | 121 | 121 |
| 9 | SolarMax Renewable Energy Provider, Inc | 116 | 116 |
| 10 | Smart Solar Power | 104 | 104 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 591 | 64 |
| 2023 | 791 | 123 |
| 2024 | 427 | 169 |
| 2025 | 318 | 260 |
| 2026 (through Aug 31, 2026) | 161 | 115 |
Under the Net Billing Tariff (NEM 3.0)
741 of the 4,527 residential solar installs in Yucaipa (16.4% of the 4,527 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Yucaipa
| 1 | Sunrun | 169 | 157 | 92.9% |
| 2 | Citadel Roofing and Solar | 51 | 5 | 9.8% |
| 3 | BRIGHT OPS | 43 | 43 | 100.0% |
| 4 | Current Home | 43 | 43 | 100.0% |
| 5 | SUNNOVA ENERGY CORPORATION | 33 | 0 | 0.0% |
| 6 | FREEDOM FOREVER LLC | 28 | 24 | 85.7% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 28 | 27 | 96.4% |
| 8 | V3 Electric | 28 | 28 | 100.0% |
| 9 | SunPower | 16 | 5 | 31.3% |
| 10 | BURGESONS HEATING AND AIR CONDITIONING INC | 13 | 10 | 76.9% |
| 11 | TIMEPROOFUSA | 12 | 0 | 0.0% |
| 12 | Complete Solar | 11 | 8 | 72.7% |
| 13 | SolarMax Renewable Energy Provider, Inc | 9 | 9 | 100.0% |
| 14 | Bright Planet Solar | 8 | 1 | 12.5% |
| 15 | EXO Energy | 8 | 4 | 50.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 594 of Yucaipa’s 594 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (237, 39.9%) used modules recorded as Qcells.
In the last 24 months, 594 of Yucaipa’s 594 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (276, 46.5%) used inverters recorded as Enphase.
In the last 24 months, 426 of Yucaipa’s 594 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (251, 58.9%) used batteries recorded as Tesla.
796 of 826 battery-paired PG&E and SCE installs (96.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 237 | 1,075 |
| JA Solar | 114 | 289 | |
| LONGi | 78 | 288 | |
| Canadian Solar | 35 | 318 | |
| Silfab | 29 | not in top list | |
| Inverter maker | Enphase | 276 | 1,916 |
| Tesla | 209 | 285 | |
| SolarEdge | 132 | 1,350 | |
| SunPower | 17 | 347 | |
| ABB | 11 | 172 | |
| Battery maker | Tesla | 251 | 413 |
| Enphase | 88 | 154 | |
| SolarEdge | 60 | 88 | |
| FranklinWH | 14 | 19 | |
| Lion Energy | 7 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,613 of 4,527 installs, inverters on 4,525. See the methodology and the equipment index.
ZIP codes in Yucaipa
ZIP codes with their own page where the utilities recorded Yucaipa on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92399 | 4,507 | 4,518 | 594 |
SGIP battery storage projects in Yucaipa
The SGIP report lists 197 battery storage projects with the city Yucaipa, 129 with the status Paid ($1,793,123 in current incentive allocations, 2,637 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 129 | 2,637 | $1,793,123 |
| PBI in Process | 4 | 8,472 | $5,344,806 |
| Reserved | 14 | 19,481 | $4,990,044 |
| Waitlist | 12 | 200 | $316,880 |
| Cancelled | 37 | 6,711 | $3,985,441 |
| RRF Rejected | 1 | 18 | $1,246 |
Installers named on the most SGIP storage projects in Yucaipa
21 of the 197 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Yucaipa is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,527
- Last 24 months
- 594
- Capacity
- 33.8 MW DC
- Median system size
- 6.7 kW DC
- With battery storage
- 18.2% all time; 73.4% last 24 months
- Third-party owned
- 39.5% where reported
- Ownership types recorded
- PPA 1,239, lease 209, prepaid lease 5, other 200
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 15, 2000
Common questions
How many homes in Yucaipa have solar?
4,527 residential solar systems in Yucaipa were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 594 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Yucaipa?
103 installer names have at least one install interconnected in Yucaipa in the last 24 months, and 473 appear in the full record.
How common are batteries with new solar in Yucaipa?
18.2% of the solar installs interconnected in Yucaipa include battery storage across all years, and 73.4% in the last 24 months (436 of 594).
How many solar installs in Yucaipa are under NEM 3.0?
741 of the 4,527 residential solar installs in Yucaipa (16.4% of the 4,527 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.