Net-metered solar by California utility

How many net-metered solar installations does each California utility have?

EIA’s 2025 Form EIA-861 data count 2,290,366 net-metered solar PV installations in California (2,241,381 residential), with 20,041.1 MW of capacity after EIA’s state adjustment to AC. Pacific Gas & Electric Co. reported 949,590, Southern California Edison Co 746,002 and San Diego Gas & Electric Co 346,738; the other 28 utilities with rows reported 248,036 combined.

Counts from EIA’s 2025 Form EIA-861 net metering file, downloaded Nov 16, 2026. Not a finding about any utility’s programs or customers.

The U.S. Energy Information Administration collects net metering counts from every utility on Form EIA-861. This page lists the 31 California utilities with a 2025 net metering row, 31 of them with their own page here. EIA’s state total includes adjustment rows (-16.049 MW for California) that are not assigned to any utility.

Net-metered solar PV by utility, 2025

Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848
San Diego Gas & Electric CoInvestor Owned346,738340,5002,361.405AC10,687
Los Angeles Department of Water & PowerMunicipal97,72795,898745.215AC4,310
Sacramento Municipal Util DistPolitical Subdivision64,62662,657423.393AC3,281
City of Roseville - (CA)Municipal13,47613,36262.258AC424
Modesto Irrigation DistrictPolitical Subdivision12,25411,98695.713AC1,175
Imperial Irrigation DistrictPolitical Subdivision12,07811,728163.208AC0
City of Riverside - (CA)Municipal8,2487,97579DC0
Turlock Irrigation DistrictPolitical Subdivision5,6135,41571.514AC0
City of Anaheim - (CA)Municipal5,5445,35155.62DC0
City of Glendale - (CA)Municipal4,0143,87436.171AC343
Merced Irrigation DistrictPolitical Subdivision3,6993,62325.906AC141
City of Pasadena - (CA)Municipal3,2373,12129.947AC0
City of Moreno Valley - (CA)Municipal3,2253,20420.363AC87
City of Redding - (CA)Municipal2,4482,33224.927DC0
City of Burbank Water and Power - (CA)Municipal1,9891,89918.012AC92
City of Palo Alto - (CA)Municipal1,8911,76321.6AC229
City of Santa Clara - (CA)Municipal1,3471,23324.527AC0
City of Colton - (CA)Municipal1,2821,21122.03AC26
Alameda Municipal PowerMunicipal1,2641,2357.473AC0
PacifiCorpInvestor Owned1,10999515.896DC116
Liberty UtilitiesInvestor Owned8377445.366AC60
City of Lodi - (CA)Municipal7106437.701AC0
Bear Valley Electric ServiceInvestor Owned7036786.519DC0
City of AzusaMunicipal4764644.564DC0
City of Shasta Lake - (CA)Municipal1531461.271AC4
City of Vernon - (CA)Municipal418.7AC0
City of Corona - (CA)Municipal25201.45AC0
Surprise Valley ElectrificationCooperative20180.184AC0
City & County of San Francisco - (CA)Municipal00AC0

California totals by month, 2026 (EIA-861M)

MonthData statusPV customersResidentialPV capacity MWPV-paired batteries
Jan 2026Preliminary2,254,4882,206,86120,143.008339,469
Feb 2026Preliminary2,265,2322,217,39720,291.166348,599
Mar 2026Preliminary2,277,3202,229,10820,444.777356,544
Apr 2026Preliminary2,290,5152,241,77920,660.255366,515
May 2026Preliminary2,300,6572,251,62020,786.379374,096
Jun 2026Preliminary2,311,3092,261,94620,956.781382,215
Jul 2026Preliminary2,322,2122,272,63921,079.17390,937
Aug 2026Preliminary2,334,6802,284,75921,245.024398,780

From EIA’s EIA-861M net metering workbook for 2026, with the data status EIA prints on each row. Monthly figures come from EIA’s monthly survey and can differ from the annual Form EIA-861 numbers.

Utilities with no net metering row

EIA’s 2025 Service Territory file lists 30 more utilities or energy suppliers in California with no utility-level installations in the net metering file: Aha Macav Power Service (short form); Anza Electric Coop Inc (short form); Bonneville Power Administration; Central Coast Community Energy; City of Banning - (CA) (short form); City of Biggs - (CA) (short form); City of Escondido - (CA); City of Gridley - (CA) (short form); City of Healdsburg - (CA) (short form); City of Lompoc - (CA) (short form); City of Needles - (CA) (short form); City of Ukiah - (CA) (short form); City of Victorville - (CA) (short form); Colorado River Indian Irr Proj (short form); DOD USMC Marine Air Ground Combat (short form); Kings River Conservation Dist; Kirkwood Meadows PUD (short form); Lassen Municipal Utility District (short form); Lathrop Irrigation District (short form); Pittsburg Power Company (short form); Plumas-Sierra Rural Elec Coop (short form); Port of Oakland (short form); Port of Stockton - (CA) (short form); Rancho Cucamonga Municipal Utility (short form); Shelter Cove Resort Improvement Dist No. 1 (short form); Trinity Public Utilities Dist (short form); Truckee Donner P U D (short form); Tuolumne County Pub Power Agny (short form); Valley Electric Assn, Inc; WAPA-- Western Area Power Administration. For short form filers, EIA’s file note says its state adjustments “include PV capacity from the short form.” This is what the 2025 files contain, not a finding that a utility has no solar customers.

EIA’s definitions and caveats, quoted

From the Form EIA-861 instructions (Schedule 7, Part A), included in EIA’s 2025 zip:

“Net Metering tariff arrangements permit a facility, typically generating electricity from a renewable resource (using a meter that reads inflows and outflows of electricity) to sell excess power generated over its load requirement back to the electrical grid, typically but not necessarily at a rate equivalent to the retail price of electricity.”

“Virtual Net Metering: A billing arrangement that allows multiple energy customers to receive net metering credit from a shared onsite or remote renewable energy system as if it was located behind the customer’s own meter.”

“Report the number of net metering installations/customers that are actively enrolled in a net metering program as of December 31st of the data year.”

From EIA’s description of the files on the EIA-861 data page:

“The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority. … We make a state-level adjustment for missing PV capacity and to convert state total capacity to AC units for those respondents who report data in DC units; we use 0.8256 as a conversion factor to change DC to AC.”

“The data contain cumulative values of generators that are not net metered and are under 1 megawatt in size (and not reported on Form EIA-860 ). … Form EIA-861S respondents do not provide non-net-metering distributed data.”

The note printed under the 2025 net metering sheet:

“Note: Data is reported as collected. Adjustments remove capacity lost in conversion from DC to AC and include PV capacity from the short form. All Technologies does not include batteries. Some utilities reclassified net metering as non net metering distributed, or vice versa. Source: U.S. Energy Information Administration, Form EIA-861, 'Annual Electric Power Industry Report.'”

The note printed under the 2026 EIA-861M net metering sheet:

“Note: In August 2023 the collection of storage data was discontinued and PV paired and PV non-paired battery data began. NM = Not Meaningful due to large relative standard error. Data is reported as collected. All Technologies does not include batteries. Adjustments add capacity for non-respondents and remove capacity lost in conversion from DC to AC. The adjusted capacity values reported in the adjustments are for net metering and virtual net metering < 1 MW combined. Some utilities reclassified net metering as non net metering distributed, or vice versa. Source: U.S. Energy Information Administration, Form EIA-861M, 'Monthly Electric Power Industry Report.'”

Common questions

Why is this count larger than the installs elsewhere on this site?

The rest of this site counts residential systems in the PG&E, SCE and SDG&E interconnection records (DG Stats). EIA’s net metering file counts every sector and every California utility that files the long form, including LADWP, SMUD and the irrigation districts, as of December 31, 2025.

Are installations the same as customers?

EIA’s 2025 annual file labels the count “Installations”; its monthly EIA-861M file labels it “Customers”. The form instructions say: “Report the number of net metering installations/customers that are actively enrolled in a net metering program as of December 31st of the data year.”

Are the capacity numbers AC or DC?

Each utility row is in the unit the utility reported, shown in the Unit column. EIA’s state totals convert DC to AC; its utility rows do not, so this site does not add AC and DC rows together except where it says so.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.